Forwards Reflecting Agreement Reached Between Util & State of Il Atty General Re Protocal Under Which Independent Design Review Conducted.Protocal Will No Longer Be in Effect After 850307 Public Meeting
ML20102B850
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/28/1985
From: Hall D
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
U-0810, U-810, NUDOCS 8503040447
Download: ML20102B850 (3)


Text

, . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . .

. g U-0810 l L40-85(02-28)-L ILLIN0/8 POWER COMPANY 1g,120 ggy 500 SOUTH 27TH STREET. DECATUR, ILUNOIS 62525-1805 February 28, 1985 Director of Nuclear Reactor Regulation Mr. A. Schwencer, Chief

_, Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. _20555

Dear Mr. Schwencer:

Enclosed is a copy of a letter dated February 11, 1985, reflecting an agreement reached between Illinois Power Company and the Illinois Attorney General (IAG) concerning the r Protocol under which the Independent Design Review (IDR) for the Clinton Power Station has been conducted. Pursuant to that agreement, insofar as the IAG is concerned, the Protocol shall no longer be in effect after the public meeting on the IDR scheduled for March 7, 1985. Accordingly, by copy of this letter, we are informing Bechtel Power Corporation of the agreement with the State.

As.we have discussed with you, we believe that once Bechtel has completed its explanation of the IDR final report at the March 7 public meeting, the Protocol will have served its basic purpose. If you agree, we would appreciate receiving the concurrence of the NRC that the Protocol can be terminated entirely after the public meeting.

S erely yours,

. Itall Vice President cc: See attached distribution list Attachment K 1

~

o 3 Clinton Power Station Independent Design Review Standard Distribution List Director of Nuclear Reactor Regulation Richard J. Goddard, Esq.

Attn: Mr. A. Schwencer, Chief Office of the Legal Director Licensing Branch No. 2 U.S. Nuclear Regulatory Comission Division of Licensing Washington, D. C. 20555 U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Terry Lash Director, Illinois Department of James G. Keppler Nuclear Safety Regional Administrator 1035 Outer Park Drive Region III Springfield, Illinois 62704 U.S. Nuclear Regulatory Comission 799 Roosevelt Road Allen Samelson, Esq.

Glen Ellyn, Illinois 60137 Assistant Attorney General Environmental Control Division Byron Siegel Southern Region Clinton Licensing Project Manager 500 South Second Street Mail Code 416 Springfield, Illinois 62706 U.S. Nuclear Regulatory Connission Washington, D. C. 20555 Jean Foy Spokesperson, Prairie Alliance Fred Christianson 511 W. Nevada Mail Code V-690 Urbana, Illinois 61801 NRC Resident Office Clinton Power Station Richard Hubbard R.R. #3, Box 228 MHB Technical Associates Clinton, Illinois 61727 1723 Hamilton Avenue Suite K James L. Milhoan San Jose, California 95125 Section Chief, Licensing Section Quality Assurance Branch Gordon L. Parkinson Office of Inspection and Enforcement Bechtal Power Corporation Mail Stop EWS - 305B Fifty Beale Street U.S. Nuclear Regulatory Conmission P. O. Box 3965 Washington, D. C. 20555 San Francisco, California 94119 Richard C. Knop Roger Heider Section Chief Sargent & Lundy Engineers Projects Section 1-C 55 East Monroe Street U.S. Nuclear Regulatory Comission Chicago, Illinois 60603 799 Roosevelt Road Glen Ellyn, Illinois 60137 Ted DelGaizo WESTEC Services Inc.

1 Meeting House Center Suite 100 2240 Butler Pike Plymouth Meeting, Pennsylvania 19462

1

. 3 SCHIFF HARDIN & WAITE o.~.~~w,, ~,.- C...no,,,

WASHINGTON OFFICE:

7200 Sears Tower, Chicago, Illinois 60606 1101 Connecticut Avenue. N.w., Washington, D C. 20036 Telephone (312) 876-1000 Twx 910-221-2463 Telephone (202) 857-0600 Telex SHw 64590 February 11,1985 BY MESSENGER Mr. John McCaffrey Assistant Attorney General Attorney General's Office Public Utilities Division 160 North LaSalle Suite 900 Chicago, Illinois 60601-3084 Re: Clinton Power Station Independent Design Review

Dear John:

I am writing to confirm our discussions on the termination, as between Illinois Power Company (IP) and the Illinois Attorney General (IAG), of the Protocol under which the Independent Design Review (IDR) has been conducted. As you know, Bechtel Power Corporation (Bechtel) has issued its final IDR report. Our understanding is that the Nuclear Regulatory Commission will schedule a public meeting for March 7,1985 for the purpose of discussing and commenting on Bechtel's performance of the IDR as reflected in the report, i.e., Bechtel's review effort, the information and commitments Bechtel relied upon, and Bechtel's conclusions.

Based on our discussions, the IAG and IPC have agreed that, insofar as the IAG is concerned, the Protocol shall no longer be in effect after the conclusion of that meeting. However, pursuant to paragraphs A.5, 6 and 7 of the January 28, 1985 Joint Stipulation, IP will be obligated to furnish the IAG with notice and opportunity to attend any meetings scheduled by the NRC concerning findings and corrective actions which relate to the IDR, copies of any requests to the NRC to change the IDR and copies of all documents submitted by IP to the NRC relevant to the IDR. As part of this obligation, should Bechtel submit any additional documents concerning the IDR to the NRC,IP will furnish copies to the IAG.

If the foregoing reflects our agreement, please execute the copy of this letter I have enclosed and return it to me.

Very truly yours, Sheldon A. abel Agreed a;p! Accepted One of the Attorneys This %J #tlay of February,1985. for Illinois Power Company, et al.

The People of the State of Illinois Neil F..Hartig , tor ener th /sC " M n

7 7