ML20102B807

From kanterella
Jump to navigation Jump to search
Provides Interim Response to IE Bulletin 84-03, Refueling Cavity Water Seal. Design Mods Being Implemented.Seals Reinforced W/Stainless Steel Pins in Elastomer Seal Flange. Final Response Expected by 850430
ML20102B807
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/28/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-84-03, IEB-84-3, NUDOCS 8503040406
Download: ML20102B807 (4)


Text

.

o Arizona Public Service Company ANPP-EEVB/WJP/WFQ-32027 February 28, 1985

' John B. Martin, Regional Administrator U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Waltiut Creek, CA 94596-5368

Subject:

Palo Verde Nuclear Generating Stai. in (PVNGS) Units 1, 2 and 3 Docket Nos. STN-50-528 (License No. NPF-34)/529/530 NRC IE Bulletin 84-03 Refueling Cavity Water Seal File: 85-056-026; G.1.01.10

References:

(A) NRC IE Bulletin 84-03 Refueling Cavity Water Seal (B) ANPP Istter to NRC, 11/14/84 (ANPP 31121-EEVB/SRF)

Dear Mr. Martin:

ANPP has reviewed IE Bulletin No. 84-03, which requests licensees review the Haddam Neck seal failure and evaluate the potential for and consequences of a refueling cavity water seal failure and provide a summary report of these actions.

Reference (B) requested an extension to the end of February, 1985 to respor.d to the Bulletin.

This is an interim report on the progress made to date.

Design modifications to the refueling cavity water seal at PVNGS are currently being implemented.

The design modifications will incorporate the consideration of the Haddam Neck experience.

The seals are being reinforced with stainless steel pins in the elastomer seal flange.

While the PVNGO design seals are also Presray inflatable type, there are some important differences between these and the Haddam Neck design such as:

1.

The PVNGS design incorporates 24 seal supports from the seal ribs whereas the Haddam Neck design is only supported at nine locations.

2.

The gaps between the reactor flange and pool seal assembly and containment embedment ring are controlled by means of two locating pins.

The pins, 1-7/16 inch diameter, are necessary for gap control.

The original Haddam Neck design did not contain any locating pins.

28

ANPP-32027 Page 2.

ANPP has contracted Combustion Engineering, the NSSS supplier, to investigate the modified pool seal assembly.

Among the items to be addressed are:

1.

Reliability Evaluation 2.

Heat Loss Analysis 3.

Refueling Machine Review 4.

Fuel Bundle Drop Analysis and Test 5.-

Containment, Spent Fuel Building and Boundary Dose Rates The. ANPP final response to IE Bulletin 84-03 will be submitted by April 30, 1985.

This will allow us to complete the design modifications and evaluations of the refueling cavity water seal design.

If you have any questions, please contact me.

Very truly yours, d

E.E. m oc t E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVBJr/WJP/dh cc:

R. Zimmerman A. C. Gehr U. S. NRC Document Control Desk (Original)

1 ANPP-32027 a

0 STATE OF ARIZONA )

) ss.

COUNTY OF MARICOPA)

I, Edwin E. Van Brunt,. Jr., represent that I am Vice President, Nuclear Production of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief. the statements made therein are true.

~.

L LL CLLt G LLk Edwin E. Van Brunt, Jr.

Sworn to before me this c'l day of blr2evtu, 1985.

VTwas 8 77h/At Votary Public My Commission Expires:

My Commission Expires April 6,1987 9

,,-