Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217C7961999-10-0606 October 1999 Marked-up & Type Written Proposed TS Pages,Revising TSs 1.0, 3.6,Bases 3.0,Bases 3.6 & 5.5,to Adopt Implementation Requirements of 10CFR50,App J,Option B for Performance of Type A,B & C Containment Leakage Rate Testing ML20209A7351999-06-23023 June 1999 Proposed Tech Specs Pages 3.3-4 & 3.3-6,replacing Page 3.3-6 Re Recirculation Loop Flow Transmitters & Applicable SRs Associated with Function 2.b ML20196B4741999-06-17017 June 1999 Proposed Tech Specs Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610 ML20195E9101999-06-0808 June 1999 Proposed Tech Specs,Correcting Described Method by Which SGTS Heaters Are to Be Tested ML20205H2891999-03-31031 March 1999 Proposed Tech Specs Modifying ACs for Unit Staff Qualifications for Shift Supervisor,Senior Operator,Licensed Operator,Shift Technical Advisor & Radiation Manager Positions ML20236W1141998-07-28028 July 1998 Proposed Tech Specs Re Implementation of BWR Thermal Hydraulic Stability Solution ML20151Q0621998-07-28028 July 1998 Final Version of Improved TS & Bases Re Proposed Change to Conversion to Improved Standard TS ML20236R9821998-07-16016 July 1998 Proposed Tech Specs Section 6.5.1,re Implementation of BWR Thermal Hydraulic Stability Solution ML20236Q0641998-07-13013 July 1998 Proposed Tech Specs Re Rev B to Conversion to Improved STS ML20216H0801998-04-15015 April 1998 Proposed Tech Specs Sections 2.1.A.1.d & 3.2.C,deleting Max Rated Power for APRM Rod Block Trip Setting ML20216H0571998-04-15015 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20216B4481998-04-0202 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20148G3481997-05-30030 May 1997 Proposed Tech Specs,Changing Frequency of Testing RHR Cross Tie valve,RHR-MOV-MO20,position Indication from Once Per Month to Once Per Operating Cycle ML20138J0751997-05-0505 May 1997 Proposed Tech Specs,Relocating Control of Standby Liquid Control Relief Valve Setpoint in TS 4.4.A.2.a & Associated Bases ML20148B0041997-05-0202 May 1997 Proposed Tech Specs,Deleting SLC Relief Valve Testing Described in TS Section 4.4.A.2.a & Associated Bases in Bases Section 3.4.A Since Testing Is Already Performed Under ISI Program ML20134K3771997-02-10010 February 1997 Proposed Tech Specs Re Requirements for Avoidance & Protection from Thermal Hydraulic Instabilities to Be Consistent w/NEDO-31960 & NEDO-31960,Suppl 1, BWR Owners Group Long-Term Stability Solutions.. ML20117K3291996-06-0606 June 1996 Proposed Tech Specs Revising Safety Limit MCPR from 1.06 to 1.07 for Dual Recirculation Loop Operation & from 1.07 to 1.08 for Single Recirculation Loop Operation ML20100R4431996-03-0505 March 1996 Proposed Tech Specs,Consisting of Change Request 142, Revising TS, DG Enhancements ML20086K4421995-07-14014 July 1995 Revised Proposed Tech Specs Re DG Enhancements Reflecting More Conservative Approach to Enhancing DGs ML20086B7061995-06-28028 June 1995 Proposed Tech Specs Re Increasing Required RPV Boron Concentration & Modifying Surveillance Frequency for SLC Pump Operability Testing ML20085J2631995-06-15015 June 1995 Proposed Tech Specs Re Extension of Surveillance Intervals for Logic Sys Functional Testing for ECCS ML20083A7241995-05-0505 May 1995 Proposed Tech Specs Reflecting Changes to TSs & Associated Bases for License DPR-46 ML20083A1341995-05-0202 May 1995 Proposed Tech Specs Re Temporary Rev to SR to Extend Two Year LLRT Interval Requirement ML20149H8821994-12-27027 December 1994 Proposed Tech Specs Re Control Room Emergency Filter Sys ML20078S5711994-12-22022 December 1994 Proposed Tech Specs Re Definition of Lco,Per GL 87-09 ML20073J2371994-09-26026 September 1994 Proposed TS LCOs 3.5.C.1 & 3.5.C.4,increasing Min Pressure at Which HPCI Sys Required to Be Operable from Greater than 113 Psig to Greater than 150 Psig ML20071K1541994-07-26026 July 1994 Proposed Tech Specs to Increase Flow Capacity of Control Room Emergency Filter System ML20070M6671994-04-26026 April 1994 Proposed Tech Specs Re Intermittent Operation of Hydrogen/ Oxygen Analyzers ML20065K1931994-04-12012 April 1994 Proposed Tech Specs,Reflecting Removal of Definitions 1.0.Z.B.1 Through 5,change to LCO 3.21.B.1.a (Line 5) Re Ref to 10CFR20.106 & Change to Paragraphs 1,4,5 & 6 (Lines 6,3,8 & 2 Respectively) Re Ref to 10CFR20.106 ML20058N2321993-12-10010 December 1993 Proposed Tech Specs 3/4.21, Environ/Radiological Effluents, 6.5, Station Reporting Requirements & 6.5.1.C.2 Re 10CFR50.59(b) Rept ML20058N2881993-12-10010 December 1993 Proposed Tech Specs for Pressure Vs Temp Operating Limit Curves ML20058M2591993-09-28028 September 1993 Proposed Tech Specs Modifying Organizational Structure by Removing Mgt Positions of Site Manager & Senior Manager of Operation ML20056G5971993-08-31031 August 1993 Proposed TS Re Primary Containment Isolation Valve Tables ML20056G5821993-08-31031 August 1993 Proposed TS Re Primary & Secondary Containment Integrity ML20056G2341993-08-25025 August 1993 Proposed Tech Specs Bases Section to Reflect Operational & Design Changes Made to CNS Svc Water Sys During 1993 Refueling Outage ML20056F3331993-08-23023 August 1993 Proposed Tech Specs 6.0, Administrative Controls, Reflecting Creation of Mgt Position of Vice President - Nuclear ML20045D8991993-06-23023 June 1993 Proposed TS SR 4.9.A.2 Re Determination of Particulate Concentration Level of Diesel Fuel Oil Storage Tanks ML20045C0031993-06-14014 June 1993 Proposed Tech Specs Associated W/Dc Performance Criteria ML20045C8301993-06-14014 June 1993 Proposed Tech Specs Incorporating New Requirements of 10CFR20 ML20128L5561993-02-12012 February 1993 Proposed TS Table 4.2.D, Min Test & Calibr Frequencies for Radiation Monitoring Sys & TS Pages 81 & 84 Re Notes for Tables 4.2.A Through 4.2.F ML20128E6201993-02-0101 February 1993 Proposed Tech Specs Reflecting Current NRC Positions Re Leak Detection & ISI Schedules,Methods,Personnel & Sample Expansion,Per GL 88-01 ML20127B8331993-01-0505 January 1993 Proposed TS Pages 53,55,70 & 71,removing Bus 1A & 1B Low Voltage Auxiliary Relays ML20115F8531992-10-15015 October 1992 Proposed Tech Specs Page 48,reflecting Relocation of Mechanical Vacuum Pump Isolation SRs ML20115A3481992-10-0808 October 1992 Proposed TS Section 6.1.2 Re Offsite & Onsite Organizations, Delineating Responsibilities of Site Manager & 6.2.1.A Re Min Composition of Station Operations Review Committee ML20104B2091992-09-0909 September 1992 Proposed TS 3.1.1 Re Reactor Protection Sys Instrumentation Requirements & TS Table 3.2.D Re Radiation Monitoring Sys That Initiate &/Or Isolate Sys ML20104A8691992-09-0202 September 1992 Proposed TS 3.9 & 4.9 Re Auxiliary Electrical Sys ML20099D4151992-07-28028 July 1992 Proposed TS 3.6 Re LCO for Primary Sys Boundary & 4.6 Re Surveillance Requirements for Primary Sys Boundary ML20113G8241992-05-0404 May 1992 Proposed Tech Spec Pages for Removal of Component Lists,Per Generic Ltr 91-08 ML20096D6111992-05-0404 May 1992 Proposed Tech Specs Change 100 to Eliminate Main Steam Line Radiation Monitor Scram & Isolation Functions ML20090A8061992-02-25025 February 1992 Proposed Tech Specs Re Dc Power Sys 1999-06-08
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217C7961999-10-0606 October 1999 Marked-up & Type Written Proposed TS Pages,Revising TSs 1.0, 3.6,Bases 3.0,Bases 3.6 & 5.5,to Adopt Implementation Requirements of 10CFR50,App J,Option B for Performance of Type A,B & C Containment Leakage Rate Testing ML20209A7351999-06-23023 June 1999 Proposed Tech Specs Pages 3.3-4 & 3.3-6,replacing Page 3.3-6 Re Recirculation Loop Flow Transmitters & Applicable SRs Associated with Function 2.b ML20196B4741999-06-17017 June 1999 Proposed Tech Specs Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610 ML20195E9101999-06-0808 June 1999 Proposed Tech Specs,Correcting Described Method by Which SGTS Heaters Are to Be Tested ML20207A0761999-05-14014 May 1999 Rev 3 to CNS Strategy for Achieving Engineering Excellence ML20206J2661999-04-22022 April 1999 CNS Offsite Dose Assessment Manual (Odam) ML20205H2891999-03-31031 March 1999 Proposed Tech Specs Modifying ACs for Unit Staff Qualifications for Shift Supervisor,Senior Operator,Licensed Operator,Shift Technical Advisor & Radiation Manager Positions ML20151Q0621998-07-28028 July 1998 Final Version of Improved TS & Bases Re Proposed Change to Conversion to Improved Standard TS ML20236W1141998-07-28028 July 1998 Proposed Tech Specs Re Implementation of BWR Thermal Hydraulic Stability Solution ML20236R9821998-07-16016 July 1998 Proposed Tech Specs Section 6.5.1,re Implementation of BWR Thermal Hydraulic Stability Solution ML20236Q0641998-07-13013 July 1998 Proposed Tech Specs Re Rev B to Conversion to Improved STS ML20206P9051998-07-0707 July 1998 Rev 2, Strategy for Achieving Engineering Excellence, for Cooper Nuclear Station ML20216H0571998-04-15015 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20216H0801998-04-15015 April 1998 Proposed Tech Specs Sections 2.1.A.1.d & 3.2.C,deleting Max Rated Power for APRM Rod Block Trip Setting ML20216D8971998-04-0808 April 1998 Rev 1 to Strategy for Achieving Engineering Excellence ML20216B4481998-04-0202 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20203G4271998-02-24024 February 1998 Rev 0 to First Ten-Year Interval Containment Insp Program for Cns ML20202H5311998-02-11011 February 1998 Strategy for Achieving Engineering Excellence ML20216G1571997-09-0505 September 1997 Rev 2.1 to Third 10-Yr Interval Inservice Insp Program ML20210H5641997-08-0707 August 1997 Rev 2 to NPPD CNS Third Interval Inservice Testing Program ML20148G3481997-05-30030 May 1997 Proposed Tech Specs,Changing Frequency of Testing RHR Cross Tie valve,RHR-MOV-MO20,position Indication from Once Per Month to Once Per Operating Cycle ML20148G8531997-05-0909 May 1997 Nebraska Public Power District Nuclear Power Group Phase 3 Performance Improvement Plan, Closure Rept ML20138J0751997-05-0505 May 1997 Proposed Tech Specs,Relocating Control of Standby Liquid Control Relief Valve Setpoint in TS 4.4.A.2.a & Associated Bases ML20148B0041997-05-0202 May 1997 Proposed Tech Specs,Deleting SLC Relief Valve Testing Described in TS Section 4.4.A.2.a & Associated Bases in Bases Section 3.4.A Since Testing Is Already Performed Under ISI Program ML20138H3861997-04-29029 April 1997 Rev 1.2 to CNS Third Interval IST Program ML20134K3771997-02-10010 February 1997 Proposed Tech Specs Re Requirements for Avoidance & Protection from Thermal Hydraulic Instabilities to Be Consistent w/NEDO-31960 & NEDO-31960,Suppl 1, BWR Owners Group Long-Term Stability Solutions.. ML20134E1091996-10-25025 October 1996 NPPD Cooper Nuclear Station Third Interval IST Program, Rev 1 ML20117K3291996-06-0606 June 1996 Proposed Tech Specs Revising Safety Limit MCPR from 1.06 to 1.07 for Dual Recirculation Loop Operation & from 1.07 to 1.08 for Single Recirculation Loop Operation ML20100R4431996-03-0505 March 1996 Proposed Tech Specs,Consisting of Change Request 142, Revising TS, DG Enhancements ML20101L8381995-12-31031 December 1995 Reactor Containment Bldg Integrated Leak Rate Test. W/ ML20113B0531995-12-29029 December 1995 Rev 4.1 to NPPD CNS Second Ten Yr Interval ISI Program for ASME Class 1,2 & 3 Components ML20093L1901995-10-18018 October 1995 Rev 0 to Third Ten-Yr Interval ISI Program for Cns ML20086K4421995-07-14014 July 1995 Revised Proposed Tech Specs Re DG Enhancements Reflecting More Conservative Approach to Enhancing DGs ML20086H7341995-07-14014 July 1995 Rev 7 to CNS Second Ten Yr Interval IST Program ML20086H7601995-06-30030 June 1995 Rev 4 to CNS Second Ten Yr Interval ISI Program for ASME Class 1,2 & 3 Components ML20086B7061995-06-28028 June 1995 Proposed Tech Specs Re Increasing Required RPV Boron Concentration & Modifying Surveillance Frequency for SLC Pump Operability Testing ML20085J2631995-06-15015 June 1995 Proposed Tech Specs Re Extension of Surveillance Intervals for Logic Sys Functional Testing for ECCS ML20083A7241995-05-0505 May 1995 Proposed Tech Specs Reflecting Changes to TSs & Associated Bases for License DPR-46 ML20083A1341995-05-0202 May 1995 Proposed Tech Specs Re Temporary Rev to SR to Extend Two Year LLRT Interval Requirement ML20083M0401995-01-20020 January 1995 Rev 1 to Restart Readiness Program ML20083M0901995-01-13013 January 1995 Rev 2 to Startup & Power Ascension Plan ML20149H8821994-12-27027 December 1994 Proposed Tech Specs Re Control Room Emergency Filter Sys ML20078S5711994-12-22022 December 1994 Proposed Tech Specs Re Definition of Lco,Per GL 87-09 ML20083M0141994-11-0909 November 1994 Rev 3 to Phase 1 Plan, ML20083M0321994-11-0808 November 1994 Rev 0 to Restart Readiness Program ML20073J2371994-09-26026 September 1994 Proposed TS LCOs 3.5.C.1 & 3.5.C.4,increasing Min Pressure at Which HPCI Sys Required to Be Operable from Greater than 113 Psig to Greater than 150 Psig ML20149F9921994-09-15015 September 1994 Rev 1 to CNS Startup Plan ML20071K9311994-07-27027 July 1994 Diagnostic Self Assessment (DSA) Implementation Plan ML20071K1541994-07-26026 July 1994 Proposed Tech Specs to Increase Flow Capacity of Control Room Emergency Filter System ML20070M6671994-04-26026 April 1994 Proposed Tech Specs Re Intermittent Operation of Hydrogen/ Oxygen Analyzers 1999-06-08
[Table view] |
Text
. -.
I K. LimitingSafetySystemSetting(LSSS)-Thelimitingsafetysystemsettingsareseti tings on instrumentation which initiate the automatic protective action at a Icvel !
such that the safety limits will not be exceeded. The region between the safety limit and these settings represent a margin with normal operation lying below these' settings. The margin has been established so that with proper operation of the in-strumentation the safety limits will never be exceeded.
L. Mode - The reactor mode is established by the mode selector switch. The modes in-clude refuel, run, shutdown and startup/ hot standby which are defined as follows:
- 1. Refuel Mode - The reactor is in the refuel mode when the mode switch is in the REFUEL position. When the mode switch is in the REFUEL position, the refueling interlocks are in service.
- 2. Run Mode - In this mode the reactor system pressure is at or above 825 psig and the reactor protection system is energized with APRM protection (excluding the 15% high flux trip) and RBM interlocks in service.
- 3. Shutdown Mode - The reactor is in the shutdown mode when the mode switch is in the SHUTDOWN position.
- 4. Startup/ Hot Standby Mode - In this mode the reactor protection scram trips initiated by the main steam line isolation valve closure are bypassed, the low pressure main steam line isolation valve closure trip is bypassed, the reactor protection system is energized with APRM (15% SCRAM) and IRM neutron monitoring system trips and control rod withdrawal interlocks in service.
M. Operable - Operating - Inoperable
- 1. Operable - Operability - A system, subsystem, train, component or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified function (s). Implicit in this definition shall be the assumption that all necessary attendant instrumentation, controls, normal and emergency electrical power sources, cooling or seal water, lubrication or other auxiliary equipment that are required for the system, subsystem, train, component or device to perform its function (s) are also capable of performing their related support function (s).
- 2. Operating - Operating means a system, subsystem, train, component, or device is performing its intended function in its required manner.
- 3. Inoperable - A system, subsystem, train, component, or device is inoperable if it is not capable of performing its intended function (s) in its required mannen.
N. Deleted. l
- 0. Operating Cycle - Interval between the end of one refueling outage and the end et the next subsequent refueling outage.
$hh f DC ,
P
~
X?(A(X4'
6.0 ADMINISTRATIVE CONTROLS
~ ~ -
6.1 ORGANIZATION 6.1.1 Responsibility The Division Manager of Nuclear Operations shall have the over-all fulltime onsite responsibility for the safe operation of the Cooper Nuclear Station.
During periods when the Division Manager of Nuclear Operations is unavailable, he may delegate his responsibility to one of the managers in the Nuclear Operations Division.
6.1.2 offsite The portion of the Nebraska Public Power District management which relates to the operation of this station is shown in Figure 6.1.1.
6.1.3 Plant St'aff - Shift Complement The organization for conduct of operation of the station is shown in Fig. 6.1.2. The shift complement at the station shall at all times meet the following requirements. Note: Higher grade licensed operators may take the place of lower grade licensed or unlicensed operators. ,
A. A licensed senior reactor operator (SRO) shall be present at the station at all times when there is any fuel in the reactor.
B. A licensed reactor operator shall be in the control room at all times when there is any fuel in the reactor.
C. Two licensed reactor operators shall be in the control room during all startup, shutdown and other periods involving signif-icant planned control rod manipulations. A licensed SRO shall either be in the Control Room or immediately available to the Control Room during such periods.
D. A licensed senior reactor operator (SRO) with no other concur-rent duties shall be directly in charge of any refueling opera-tion, or alteration of the reactor core.
A licensed reactor operator (RO) with no other concurrent duties shall be directly in charge of operations involving the handling of irradiated fuel other than refueling or reactor core alteration operations.
E. An individual who has been trained and qualified in health physics techniques shall be on site at all times that fuel is on site.
F. Minimum crew size during reactor operation shall consist of four licensed reactor operators (two of whom shall be licensed l SRO) and three unlicensed operators. Minimum crew size during reactor cold shutdown conditions shall consist of two licensed reactor operators (one of whom shall be licensed SRO) and one unlicensed operator.
In the event that any member of a minimum shift crew is absent or incapacitated due to illness or injury a qualified replace-ment shall be designated to report on-site within two hours.
-219- ,. g . ,
NUC L E AR O PER ATIONS DIVISION MANAGER STATION OPERATIONS FIRE PROTECTION REVIEW COMMITTEE ENGINEER M (SO RC)
T ECHN IC A L QUALITY ASSURANCE
STAFF M AN AGER - CNS MANAGER I I I I T R AIN ING T ECHNICAL OPERATIONS ADMINISTRATIVE MANAGER M AN AGER MANAGER MAN GER l
OPER AT ION S SENIOR l l TRAINING ---
RAD / TECH SECURITY ADM INIS TR ATIVE M ATE RIAL SUPERVISOR I ADVISOR SUPPORT I SUPERVISOR SU PERV ISO R SUPERVISOR r - -- --- 8 '
N I, I I l ~1 N CHEM.8 RR COMPUTER PLANT DPERATIONS APPLICATIONS ENGINEER CNGINEER SUPERVISOR SUPERVISOR SUPERVISOR SUPERVISOR l l l I/S ONE/ SHIFT I&C OPERATIONS 2/S TWO/ SHIFT MAINTENANCE SUPERVISOR 3/S THREE/ SHIFT SUP ERVISO R SUPERVISOR (S RO )
RO-NRC REACTOR OPERATORS LICENSE g SRO-NRC SENIOR REACTOR OPERATORS LIC EN S E I I SHIFT M FUNCTIONAL POSITION ONLY MAINT ENANCE MECHANICAL SUPERVISORS (SRO)
ELECTRIC AL PHYSICALLY LOCATED IN GENERAL OFFICE PLANNER / I/S SUPERVISOR SCHEDULER SUPERVISOR l CONTROL ROOM SUPERV ISOR (SRO) 1/S
- . ~ . , .4 y Figure 6.1.2 5..~ l
~
f N.P.RD. Cooper Nuclear S tation 2/S (UNIT OPER (RO)
Organization Chart _
3/S Q ,1CN )ER
- . . n@f