Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116G120 + (03:31:17, 13 December 2024)
- ML20116G112 + (03:31:18, 13 December 2024)
- ML20116G108 + (03:31:18, 13 December 2024)
- RC-96-0194, Forwards Amend 96-02 to FSAR for Virgil C Summer Nuclear Station.Changes Made Under Provisions of 10CFR50.59 But Not Previously Submitted to Commission + (03:31:19, 13 December 2024)
- ML20116G094 + (03:31:20, 13 December 2024)
- ML20116G089 + (03:31:21, 13 December 2024)
- ML20116G087 + (03:31:22, 13 December 2024)
- ML20116G075 + (03:31:23, 13 December 2024)
- ML20116G049 + (03:31:24, 13 December 2024)
- ML20116G048 + (03:31:25, 13 December 2024)
- ML20116G044 + (03:31:26, 13 December 2024)
- ML20116G027 + (03:31:27, 13 December 2024)
- ML20116F995 + (03:31:28, 13 December 2024)
- ML20116F992 + (03:31:29, 13 December 2024)
- ML20116F981 + (03:31:30, 13 December 2024)
- ML20116F975 + (03:31:31, 13 December 2024)
- ML20116F971 + (03:31:32, 13 December 2024)
- ML20116F951 + (03:31:33, 13 December 2024)
- ML20116F969 + (03:31:33, 13 December 2024)
- ML20116F927 + (03:31:34, 13 December 2024)
- ML20116F924 + (03:31:35, 13 December 2024)
- ML20116F913 + (03:31:36, 13 December 2024)
- TXX-4461, Interim Significant Deficiency Rept SDAR-170 Re Stress Analysis Activity Valve Weights & Valve Weights Identified by Site Valve Weighing Program.Initially Reported on 850222. Evaluation Continuing.Completion Expected by 850510 + (03:31:37, 13 December 2024)
- ML20116F904 + (03:31:38, 13 December 2024)
- ML20116F897 + (03:31:39, 13 December 2024)
- ML20116F889 + (03:31:40, 13 December 2024)
- ML20116F884 + (03:31:41, 13 December 2024)
- ML20116F881 + (03:31:42, 13 December 2024)
- NRC-84-2332, Final Part 21 & Deficiency Rept (NCR-84-2332),Item 198 Re Brasch Mfg Co Electric Heating Coil Air Flow Switches W/Limited Operation Temp.Initially Reported on 850117.Vendor Replaced Switches + (03:31:44, 13 December 2024)
- ML20116F866 + (03:31:45, 13 December 2024)
- RBG-20-745, Final Deficiency Rept DR-218 Re Cracking of Puffer Piston Rods in Model 5HK Circuit Breakers Supplied by Brown Boveri Electric,Inc.Initially Reported on 850320.Piston Rods Replaced + (03:31:46, 13 December 2024)
- ML20116F843 + (03:31:47, 13 December 2024)
- ML20116F828 + (03:31:48, 13 December 2024)
- RBG-20-746, Final Deficiency Rept DR-291 Re Ruptured 22 Gauge Crankshaft Plug on Standby Diesel Generator Supplied by Tdi.Initially Reported on 850318.All 22 Gauge Crankshaft Plugs Replaced w/16 Gauge Plugs + (03:31:48, 13 December 2024)
- ML20116F824 + (03:31:49, 13 December 2024)
- ML20116F823 + (03:31:50, 13 December 2024)
- ML20116F818 + (03:31:51, 13 December 2024)
- AECM-85-0094, Part 21 & Interim Deficiency Rept 85/02 Re Tdi Air Start Valve for Emergency Diesel Generator Engine.Initially Reported on 850319.Valves on Both Diesel Generators Replaced & 800 H Limit Placed on Use.Updated Rept by 850426 + (03:31:52, 13 December 2024)
- ML20116F814 + (03:31:53, 13 December 2024)
- TXX-4465, Interim Significant Deficiency Rept SDAR-174 Re Unauthorized & Undocumented Welding Repairs to Pipe Support & Two Cable Tray Supports.Initially Reported on 850322.Structurally Impaired Support to Be Replaced by 850501 + (03:31:54, 13 December 2024)
- ML20116F797 + (03:31:55, 13 December 2024)
- TXX-4464, Interim Significant Deficiency Rept SDAR-176 Re Reliance Supplied Control Board Which Differs from Equipment Qualification Rept.Initially Reported on 850226.Evaluation Continuing.Completion Expected by 850531 + (03:31:56, 13 December 2024)
- ML20116F749 + (03:31:57, 13 December 2024)
- ML20116F769 + (03:31:57, 13 December 2024)
- NSD-NRC-96-4769, Forwards Response to Open Item Tracking Sys Item 2259 Re COLR Treatment for AP600 Design Certification + (03:31:59, 13 December 2024)
- ML20116F735 + (03:31:59, 13 December 2024)
- AECM-85-0101, Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II Replaced + (03:32:00, 13 December 2024)
- 3F0485-19, Florida Progress Corp Annual Rept 1984. Annual Financial Statements for Util & Participants Encl + (03:32:01, 13 December 2024)
- AECM-85-0096, Part 21 & Interim Deficiency Rept 85/30 Re MSIV Failure to Remain in Closed Position Due to Failure of Automatic Switch Co Dual Solenoid.Initially Reported on 850321.Listed Matl Nonconformance Rept Issued.Updated Rept Expected by 850430 + (03:32:02, 13 December 2024)
- ML20116F684 + (03:32:03, 13 December 2024)
- ML20116F663 + (03:32:11, 13 December 2024)