ML20116F904
| ML20116F904 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 03/25/1985 |
| From: | Hufham J TENNESSEE VALLEY AUTHORITY |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8505010295 | |
| Download: ML20116F904 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _
J r,
o TENNESSEE VALLEY AU ' HORITY TWHMSu\\ Yt"r"eW%dePTE N N' BLRD-50 Il38M2-75 BLRD-50 l439M2-69 U.S. Nuclear Regulatory Canmission Region II Attn:
Dr. J. Nelson Grace, Regiomi Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303
Dear Dr. Grace:
BELLEFOITE NIELEAR PLANT INITS 1 AND 2 - FAILURE TO P EFFORM ANALE>IS GECIG ON ISOFETRIG AND LOAD TABLES - BLRD-50 Il3842-75, BLRD-50 Il3942 THIRD INTERIM IEPORT The subject deficiency was initially reincted to NRC-0IE Inspector R. V. Crienjak on October 26, 1982 in accordance with 10 GR 50.55(e) as NCR BLN GB 8215. This was followod by our interim reports dated November 214, 1982 and March 21, 1983 Encioned is our third interim re por t.
We expect to subnit our next report on cr about Septonber 16, 1989.
If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours,
TENNESSEE VALLEY AUTHORITY g
J. W. Huf ham, am ger Licensing and Regulations Encion uro co:
Mr. James Taylor, Director (Enclonure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Comnission Was hington, D.C. 20555 Records Center (Enclonure)
Institute of Nuclear Power Operations 1100 circle 75 Parkway, 32ite 1500 Atlanta, Georgia 30339 OSOSO%hhh00 30 PDR PDR 0
nnrmm one.utomtv t mo oyer dC
\\
r
e f,
EN(LOSURE l
BELLEFmTE NUCLEAR PLANT UNITS 1 AND 2 l
FAILURE TO PE! FORM ANALYSIS CHECKS W ISOPETRICS NCR BLN B 8215 BLRD-50-438/82-75, BLRD-50-439/82-69 10 CFR 50.55(e) l THIRD INTERIM REPORT l
Description of Deficiency I
Problems N4-1KE-F, N4-2KE-F, !$6-1NK-B, and N4-2NK-B isometrics and load tables were signed out and issued before the analysis check was perfomed.
On problems N4-1KE-F and N4-2KE-F, the analysis check has now been perfonned i
and several analysis errors have been found which are significant. The cited isometrics and load tables are used in the design of essential raw cooling water pipe supports and reactor coolant drains and vents system supports.
l l
r Interim Progress i
TV A has completed the review of probles N4-2KE-F, N4-1NK-B, and N4-2NK-B noted in our previous report on this deficiency. Since submission of the i
second rwport, WA has reviewed all Bellefonte Nuclear Plant analysis f
problems and determined that the following problerns do not incorporate an l
amlysis checklist j
f N4 -2KE-I N4 -1NK-E i
N4-1KE-J N4 -2 NK-E N4 -2KE-J N4 -1NK-T N4 -1 RK-D l
TVA will review these problems and provide the results of our review in our next report.