Second Part 21/Deficiency Rept NCR 3615 Re Category 1 Components & Miscellaneous Steel Not Meeting QC Stds. Initially Reported on 841029.Deficiencies Reviewed.Next Rept Due by 850626
ML20116F889
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 03/25/1985
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-85-243-000 NCR-3615, NRC-3615, PT21-85-243, PT21-85-243-000, NUDOCS 8505010285
Download: ML20116F889 (2)


Text

  • ~,

TENNESSEE VALLEY AUTHORITY CHATT ANOOG A. TENNESSEE 37401 400 Chestnut Street Tower II WM $8 : 5 7 BLRD-50-43 844 -55 BLRD-50-43 944 -51 U.S. Nuclear Regulatory Cmmission Region II Attn:

Dr. J. Nelson Orace, Regiomi Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

BELLEF0iTE NUCLEAR PLANT LNITS 1 AND 2 - DEFICIENT CATEGORY I COWQiENTS AND MISGLLANEOUS STEEL - BLRD-50-43844-55 AND BLRD-50-43944 SECOND INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector P. E. Fredrickson m October 29, 1984 in accordance with 10 TR 50.55(o) as NCR 3615.

Our first interim report was autaitted November 27, 1985.

Enclm ed is our second interim report. We expect to autnit our next report on or about June 26,1985.

Contrary to what was stated in our letter dated November 27, 1985 transmitting the first interim report, we do not consider 10 TR Part 21 applicable to this d efi ci ency. Please correct your records accordingly.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours,

TENNESSEE VALLEY AUTHORITY

$t /$

I J. W. Huf ham, Mam gor Licensing and Regulations Encim uro 00:

Mr. James Taylor, Dimotor (Encimure)

Office of Insmotion and Enforooment U.S. Nuclear Regulatory Cmmission Was hi ngton, D.C. 20555 Records Center (Encimuro)

Institute of Nuclear Power Operations 1100 Cirolo 75 Parkway, 32ite 1500 Atlanta, Georgia 30339 0505010205 050325 gDR ADOCK 05000430 PDR TG & f w,uumau m,,w,un

\\ \\

~

1

  • M ' s ENCLOSURE BELLEFCNTE NUCLEAR PLANT UNITS 1 AND 2 DEFICIENT CATEGORY I (IM(NENTS AND MISGLLAE003 STEEL BLRD-50-438/84-55, BLRD-50-439/84-51 to TR 50.55(e)

NCR 3615 SECOND INTERIM REPORT Description of Deficiency Reinspection of several structural components, which had been inspected and approved, revealed that several components do not meet requirements documented in Bellefonte Nuclear Plant (BLN) quality control procedure (QCP) i 2.15 and design drawings. Scme of the affected components include stairs, ladders, platforms, tank supports, and pipe supports. Approximately 73 percent of the total itens minspected failed to meet the referenced re quimment s.

I Interim Prcuress t

WA's BLN Office of Construction (OC) personnel are documenting the results of inspections performed to determine the scope of the deficiency. The deficiencies documented are being reviewed by BLN OC personnel to determine if the affected components may be "used as is" in accordance with the BLN QCP-2.15 varianoe Tonn. All features so approved will be subnitted to TVA's Office of Engineering (08) for review and concurrenos.

Deficiencies which cannot be approved for use by OC will be doctanented on a l

separate nonconfonnance report (NCR) and subnittel to OS for dispositioning.

l t

TVA will supply details of the inspection program results in our next repart.