ML20116F995

From kanterella
Jump to navigation Jump to search
Applicant Exhibit A-6,consisting of 870506 Memo Re Reorganization of Nuclear Research Ctr
ML20116F995
Person / Time
Site: Neely Research Reactor
Issue date: 06/24/1996
From: Karam R
Neely Research Reactor, ATLANTA, GA
To:
References
REN-A-006, REN-A-6, NUDOCS 9608070250
Download: ML20116F995 (2)


Text

'

~, v s

6. 'r *Ge:rgia 4

O O

In:tituto cf T.chn:l:gy

- (}

G

-N O Nnly Nuclear Resiarch C:nt:r COCVEIED C==.

Atlanta, Georgia 30332 (404)894 3600 Ub 3C -~~

b c::ctmArre:r u.nitas 95 J1 18 Pi2 :26 """""

0FFICE 07 O Emy ifa'y C6',%1987 : ~ CE LRA O MEMORANDUM TO: Dr. T.E. Stelson, Vice President for Research FROM:

R.A. Karam, Director

/k/[ ,

SUBJECT:

REORGANIZATION OF THE NUCLEAR RESEARCH CENTER The license to opdrate the Neely Nuclear Research Center is given to Georgia Tech by the United States Nuclear Regulatory Commission. This license requires operation in compliance with the Technical Specifications, the Safety Analysis Report and all applicable rules and regulations in Title 10 of the Code of Federal Regulations. Technical Specifications 6.1.a, Figure 6.1 specifies that administrative responsibility for the NNRC resides with the office of the Vice President for Research. As such, I am formally requesting that the Neely Nuclear Research Center

-organization be restructured as shown on the attached chart.

4 There are many reasons for this request which ha.a been discussed with you informally. One of the main reasons, however, is that the U.S.N.R.C. charges the office of the Director of the NNRC, in accordance with Technical Specifications 6.1.a, with the overall- responsibilitiy for the direction and operation of the facility including safeguarding the general public and facility 1

personnel from radiation exposure and adhering to all requirements of ti he license. This responsibility cannot be met totally under the present organizational structure because the Office.of Radio-logical Safety is independent and in actual practice reports to no one. The U.S.N.R.C. is in agreement with this assessment.

I believe that the reorganization will immeasurably improve

. safety, productivity, and programatic goals. If you have any questions please let me know.

RAK:jlr Attachment NUCLEAR REGULATORY CoMMISSloN Docket No 5 o -/6 0 / 8 A) EXHlBIT No. [#

9608070250 960624 in a rnauw oLJa h PDR ADOCK 05000160 O staff a Appheant O Intervenor O other G PDR [yre ntir,ed [GAceived O Rejected Reporter , , J c v) l An Ecual Ecue:2n and Em#cyment c;,wtunty instavnon Date];f zgfLL. witness g//M A Unfol the Un,wrsity Sys:cm Cf Georg's

q _

g .,

4. : 'e '

... s  ;

g i P

. OFFICE OF THE '

. PRESIDENT, ~~~~~~~~~~~i '

i

. I

.. l l r

1 1

I I OFFICE OF THE - l l

VICE PRESIDENT FOR 8 ,

  • RESEARCH  ! l i t I

t I I

. I \

l

  • I

.?

- g-l  :

I I OFFICE OF THE -

NUCLEAR SAFEGUARDS i NNRC DIRECTOR COMMITTEE  ;

i

. MANAGER OF THE MANAGER OF MANAGER OF COORDINATOR OF-

! OFFICE OF

  • REACTOR HOT CELL EXPERIMENTAL RADIATION SAFETY OPERATION .

OPERATION RESEARCH O

\

l FIGURE 1: NNRC REORGANIZATION CHART ~

a 9

g

~

l _.