Text
.
/
9
]
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EuRiWMdiddE P. O. B O X 164 0. J A C K S O N. MIS SIS SIP PI 39215-1640 M"ahcNiT2 19 NUCLEAR LICEN51NG & SAFETY DEPARTMENT U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Attention:
Dr. J. Nelson Grace, Regional Administrator
Dear Dr. Grace:
SUBJECT:
Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 File:
0260/0511/0512 PRD-82/14, Interim Report #2 -
Unit 2, Sheared Bolts on Diesel Generator Rear Crankcase Cover AECM-85/2-0005
Reference:
(1) AECM-85/2-0002, 1-28-85 (2) AECM-83/0386, 7-5-83 Per Reference (2) Mississippi Power & Light Company (MP&L) stated a final report for Unit 2 Potentially Reportable Deficiency (PRD) 82/14 was expected to be submitted by January 30, 1985. MP&L notified Mr. Robert Carroll of your office on March 18, 1985, that due to reduced construction activities on Unit 2, a determination for applicability to Unit 2 would not be possible until after resumption of normal construction activities on Unit 2.
In addition, MP&L agreed to document an extension request in a letter to NRC Region 2 by March 22, 1985.
MP&L previously determined this deficiency was reportable under the provisions of 10 CFR 50.55(e) and 10 CFR 21 for the Unit 1 Division II Dinel Generator and provided a final report per Reference (2). As indicated in Reference (2) it remains indeterminate as to whether this deficiency is applicable to the Unit 2, Division I and II Diesel Generators. Per Reference (1), MP&L requested extensions for Unit 2 PRDs related to the Standby Diesel Generators but inadvertently did not list PRD-82/14 in that letter.
Based on the explanations provided in Reference (1), MP&L requests that further updates on PRD-82/14 be deferred until after resumption of normal construction a-ivities on Unit 2.
Yours truly, hh 7
PDR L. F. Dale Director EBS/SHH:vog cc (See Next Page)
J0P13AECM85032001 - 1 Member Middle South Utilities System t
r
'AECM-85/2-0005 Page 2 cc: Mr. J. B. Richard Mr. O. D. Kingsley, Jr.
Mr. R. B. McGehee Mr. N. S. Reynolds Mr. G. B. Taylor Mr. James M. Taylor, Director-Office of Inspection & Enforcement.
U. S. Nuclear Regulatory Commission Washington, D. C.