Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000250/LER-1985-009, :on 850401,evaluation Required for Inoperable Mechanical Shock Arrestor (Snubbers) Not Completed within Allowable Time Limits.Caused by Snubbers Inadequately Evaluated + (03:06:57, 13 December 2024)
- ML20116N978 + (03:06:58, 13 December 2024)
- 05000244/LER-1985-004, :on 850326,safety Injection Actuation Signal Generated Twice.First Event Caused by Deficiency in Maint Procedure M-48.14.Second Event Caused by Momentary Loss of Power + (03:06:59, 13 December 2024)
- ML20116N973 + (03:07:01, 13 December 2024)
- ML20116N966 + (03:07:02, 13 December 2024)
- ML20116N968 + (03:07:02, 13 December 2024)
- BVY-92-129, Responds to Initial SALP Rept 50-271/91-99 Covering 910317-920801,per 921029 Public Meeting.Improvements Made in Area of Security During Reporting Period Which Have Not Been Given Full Consideration in Rept + (03:07:03, 13 December 2024)
- 05000454/LER-1985-039, :on 850402,reactor Trip Occurred Due to Steam Generator 1B LO-2 Level.Caused by Loss of Feedwater Flow from Feedwater Pump 1B.Procedure Used for Power Ascension Revised + (03:07:05, 13 December 2024)
- ML20116N947 + (03:07:06, 13 December 2024)
- ML20116N958 + (03:07:06, 13 December 2024)
- ML20116N944 + (03:07:07, 13 December 2024)
- ML20116N941 + (03:07:09, 13 December 2024)
- ML20116N943 + (03:07:09, 13 December 2024)
- ML20116N937 + (03:07:10, 13 December 2024)
- ML20116N933 + (03:07:11, 13 December 2024)
- ML20116N931 + (03:07:11, 13 December 2024)
- ML20116N929 + (03:07:12, 13 December 2024)
- ML20116N926 + (03:07:13, 13 December 2024)
- ML20116N925 + (03:07:14, 13 December 2024)
- ML20116N924 + (03:07:15, 13 December 2024)
- ML20116N920 + (03:07:16, 13 December 2024)
- ML20116N918 + (03:07:16, 13 December 2024)
- ML20116N917 + (03:07:17, 13 December 2024)
- B11494, Forwards Addl Info Re SER Open Item 14.10, Cable Spreading Room Protection on Capability for Manual Fire Fighting,To Support Request for Deviation from Provisions of Branch Technical Position Cmeb 9.5-1,Section C.7.C + (03:07:18, 13 December 2024)
- ML20116N909 + (03:07:18, 13 December 2024)
- ML20116N906 + (03:07:19, 13 December 2024)
- ML20116N897 + (03:07:29, 13 December 2024)
- ML20116N889 + (03:07:29, 13 December 2024)
- ML20116N877 + (03:07:30, 13 December 2024)
- ML20116N875 + (03:07:31, 13 December 2024)
- ML20116N872 + (03:07:32, 13 December 2024)
- ML20116N858 + (03:07:33, 13 December 2024)
- ML20116N864 + (03:07:33, 13 December 2024)
- ML20116N853 + (03:07:41, 13 December 2024)
- 05000397/LER-1985-027, :on 850412,automatic Isolation of Div 1 balance-of-plant Relay Cabinet Occurred.Caused by Inadequate Procedure.Logic Reset.Surveillance Procedures Revised.W/ + (03:07:43, 13 December 2024)
- ML20116N841 + (03:07:44, 13 December 2024)
- ML20116N837 + (03:07:47, 13 December 2024)
- ML20116N833 + (03:07:48, 13 December 2024)
- ML20116N836 + (03:07:48, 13 December 2024)
- RBG-37762, Forwards Corrected Monthly Operating Rept for Sept 1992 for River Bend Station Unit 1 + (03:07:49, 13 December 2024)
- ML20116N820 + (03:07:50, 13 December 2024)
- ML20116N827 + (03:07:50, 13 December 2024)
- ML20116N814 + (03:07:51, 13 December 2024)
- ML20116N811 + (03:07:52, 13 December 2024)
- ML20116N807 + (03:07:53, 13 December 2024)
- ML20116N804 + (03:07:53, 13 December 2024)
- ML20116N798 + (03:07:54, 13 December 2024)
- ML20116N789 + (03:07:55, 13 December 2024)
- ML20116N787 + (03:07:55, 13 December 2024)
- ML20116N779 + (03:07:56, 13 December 2024)
- ML20116N777 + (03:07:56, 13 December 2024)
- ML20116N772 + (03:07:57, 13 December 2024)