Intervenor Exhibit I-OCRE-5,consisting of Undated Summary of Tdi Diesel Generator Owners Group 840711 Meeting W/Nrc & Bnwl Re Encl Bnwl Rept Concerning Owners Group Program Plan. W/O Encl
ML20116N931
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/09/1985
From: Ray C
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), TDI (TRANSAMERICA DELAVAL, INC.) OWNERS GROUP
To:
TDI (TRANSAMERICA DELAVAL, INC.) OWNERS GROUP
References
OGTP-109--56, OGTP-109-0-56, OL-I-OCRE-005, OL-I-OCRE-5, NUDOCS 8505070408
Download: ML20116N931 (3)


Text

/

  • d e

DUHE POWER CO.VP_tNY TELEPncht, aata 70s

"'222" GENERAL OFFICES 372.a ::

I arr sourn enumen statti CnAnto rrn. N. C. OS242 TOI Diesel ' Generator Owners Group OGTP-109-0-5c Re: July 11, 1984 Meeting between NRC/PNL/

TOI Diesel Generator Owners Group The main topic of the subject meeting was a discussion of the PNL Eeport

~

on the Owners' Group Program Plan. This report is attached for yoLr informa ti on.

The major point of contgntion with the PNL Report is in the area of endurance testing to 10' cycles (approximately 750 hrs.). This endurance testing would be required for lead engines at high power levels.

Even though we discussed two components (AE Piston and Crankshaft) in detail, the report implies all components are required to undergo the, endurance, test.

One of the key arguments we made was that the loading requirements of the engine is much less than the rated load. The NRC was very receptive to

(..

this argument and requested mo're information regarding site specific diesel engir.e loading requirements.

Attached to this letter is a LILCO submittal which discusses loading,

requirements for SNPS diesels.

In general, FSAR tables exist;for each However,dery plant similar to the' table attached to the LILC0 submittal.1 Also',

this table has proven to be ultra-conservative in many cases.

little credit is taken for operator action to reduce. engine: loads af ter

}

i 10 minutes into the accident.

i 4

Our plan is to develop curves for each plant similar to the.one for SN)S (attached). Thus, the following information is needed for e'sch utility. l

5 For the limiting transient / accident on the highest leided engine.

E O

1.

Identify the transient / accident.

2.

Identify the engine (Train A or 8) f 3.

Initial peak load 4.

All load decreases due:to" sequencing of loads or operator action 3

or other reasons.

(,.

A brief explanation of the reason for decreasing the load, c

v 5.

6.

Source of the,information (FSAR, Preop testing, etc.')

i e e

;e 4

L b 8505070408 850409 PDR ADOCK 05000440 PDR g

DUKE MANAGEMENT AND POWER TECHNICAL SERVICES

--m y

-,n-

+ -

k 4e W

c k

I b

t

~4 GESY aa 1

.]

Eni YL,

~

m

,o 3

~

Tl qkk 2

i

\\

o 41 o[3,oJh. 6 $g

-} 3 } }0 g,} }. } !

s

.2

(

4 $g-3 s

i sg o

U a

a)

= _..

4 If possible, the above information should be as realistic as pessible and

_ (',

not a repeat of ultra-conservative FSAR information.

c If you have any questions, please call Bill Coleman at 704-373-3488.

(..

Very truly.yours, 1

C.

L'. Ray, Jr.

Technical Program Director TDI Diesel Generator Owners Group yds cc: Alternates Licensing Contacts 9

  • 4 y

b

/?

j,

-4 v.

e e

t e

n "i

f t

i e

?

~-

--m.m.--

- ~....

...,s u

-