Interim Deficiency Rept DER 85-07 Re Lack of Bolt Nut Retention Mechanism on C-E Instrument Rack Design.Initially Reported on 850305.Corrective Action Under Investigation. Final Rept Will Be Submitted by 850517
ML20116N958
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/08/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-32329-TDS, DER-85-07, DER-85-7, NUDOCS 8505070418
Download: ML20116N958 (3)


Text

u I

Arizona Nuclear Power Project P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 I L3 C I

~,c

.. r.,

,.3 April 8, 1985 ANPP-32329-TDS/PJCJJ,i:;1'  ?

U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Subj ect:

Interim Report - DER 85-07 A 50.55(e) Potentially Reportable Deficiency Relating To The Lack Of Bolt Nut Retention Mechanism On CE Instrument Rack Design File: 85-019-026; D.4.33.2

Reference:

Telephone Conversation between L. Miller and T. Bradish on March 5, 1985

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the ref-erenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due tu the extensive investigation and evaluation required, an Interim Report is attached.

It is now expected that this information will be finalized by May 17, 1985, at which time a complete report will be submitted.

Very truly yours, QC N

t-C.

clu.

ALLL E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/PJC/nj Attachment cc:

See Page Two 11 8505070418 850408 1

DR ADOCK 05 g9 g.g

a.

Ly ANPP-32329-TDS/PJC Mr. D. F. Kirsch-

. DER 85-07

.Page-Two cc:

. Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N..Russo-B.-S. Kaplan

'J. R. Bynum D. Canady J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. W. Welcher H. D. Foster D. R. Hawkinson R.' P. Zimmerman M. L. Clyde M. Matt-T. J. Bloom D. N. Stover J. D. Houthen J. E. Kirby Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 t-h I

_g-

.t.

. L.,

'a.

INTERIM REPORT - DER 85-07 POTENTIAL REPORTABLE DEFICIENCY ARIZONA NUCLEAR POWER PROJECT PVNGS UNIT 2 & 3 I.

Potential Problem ASME Section III.. Subsection NF, requires a positive means of bolt nut retention. This is lacking on the current CE instrument rack design. Without such a retention mechanism,. installed nuts could become: loose when subjected to vibration. The consequential loosen-ing-of tube clamps and valve / manifold brackets could prevent proper.

operation of associated safety-related instrumentation during seismic events.

II.

Approach To and Status Of Proposed Resolution 3

Bechtel Engineering is currently corresponding with CE on this problem to determine reportability and technical justification for corrective action.

III.

Projected Completion of Corrective Action and Submittal of the Final Report The complete evaluation and final report are forecast to be completed by May 17, 1985.

4 iiT-*1

. -- -