Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20125E344 + (01:30:54, 13 December 2024)
- ML20125E342 + (01:30:57, 13 December 2024)
- ML20125E341 + (01:30:58, 13 December 2024)
- ML20125E338 + (01:30:59, 13 December 2024)
- PNO-I-79-040, on 791218,contractor Painter Fell from Ladder in Reactor Bldg & Sprained Ankle.Painter Was Treated & Released from Hosp.No Radiation or Contamination Involved + (01:30:59, 13 December 2024)
- PNO-I-79-039, on 791218,two Former Employees of Const Contractors Made Statements That Welding & Concrete Work Improperly Performed.Region 1 Conducting Investigation of Allegations + (01:31:00, 13 December 2024)
- ML20125E336 + (01:31:01, 13 December 2024)
- ML20125E334 + (01:31:01, 13 December 2024)
- ML20125E333 + (01:31:02, 13 December 2024)
- ML20125E332 + (01:31:04, 13 December 2024)
- TXX-3093, Forwards Up Geologic Info.Supersedes 790921 Transmittal.One Oversize Drawing Available in Central Files Only + (01:31:04, 13 December 2024)
- ML20125E328 + (01:31:06, 13 December 2024)
- ML20125E327 + (01:31:06, 13 December 2024)
- ML20125E325 + (01:31:07, 13 December 2024)
- ML20125E319 + (01:31:08, 13 December 2024)
- ML20125E324 + (01:31:08, 13 December 2024)
- ML20125E318 + (01:31:09, 13 December 2024)
- ML20125E317 + (01:31:10, 13 December 2024)
- ML20125E315 + (01:31:11, 13 December 2024)
- ML20125E314 + (01:31:12, 13 December 2024)
- ML20125E313 + (01:31:13, 13 December 2024)
- ML20125E312 + (01:31:13, 13 December 2024)
- ML20125E310 + (01:31:14, 13 December 2024)
- ML20125E309 + (01:31:15, 13 December 2024)
- ML20125E308 + (01:31:16, 13 December 2024)
- ML20125E306 + (01:31:17, 13 December 2024)
- PNO-III-79-057, on 791209,draining Operation from Svc Water Header of Heat Exchanger Resulted in Unplanned Release of Radioactive Liquid from Primary Side When All Valves Feeding Instrument Header Were Opened + (01:31:18, 13 December 2024)
- PNO-IV-80-004, licensee Discovered Cracks in One of Two Containment Spray Sys in Reactor Bldg.Licensee Will Inspect. Plant Presently in Cold Shutdown While Performing Mods Required by NUREG-0578 + (01:31:19, 13 December 2024)
- ML20125E302 + (01:31:19, 13 December 2024)
- ML20125E300 + (01:31:20, 13 December 2024)
- ML20125E299 + (01:31:21, 13 December 2024)
- ML20125E297 + (01:31:22, 13 December 2024)
- ML20125E295 + (01:31:23, 13 December 2024)
- ML20125E294 + (01:31:24, 13 December 2024)
- ML20125E291 + (01:31:25, 13 December 2024)
- ML20125E290 + (01:31:25, 13 December 2024)
- ML20125E288 + (01:31:29, 13 December 2024)
- ML20125E287 + (01:31:30, 13 December 2024)
- ML20125E285 + (01:31:31, 13 December 2024)
- ML20125E281 + (01:31:33, 13 December 2024)
- ML20125E280 + (01:31:33, 13 December 2024)
- ML20125E279 + (01:31:34, 13 December 2024)
- ML20125E277 + (01:31:35, 13 December 2024)
- ML20125E276 + (01:31:36, 13 December 2024)
- PNO-I-80-001, on 800104,isolation Condenser Isolated.Addl Insps of Containment Wall in Progress.Power Operation Will Continue Per Tech Specs for 15 Days.Precedures Require Power Be Reduced to 40% 24-h After Removing Condenser from Svc + (01:31:37, 13 December 2024)
- ML20125E274 + (01:31:38, 13 December 2024)
- 05000312/LER-1979-024-03, /03L-0:on 791217,during Normal Operation,Hpi Pump B Taken Out of Svc.On 800109,discovered That Cooling Water Supply Valves Were Isolated.Caused by Removal of HPI Pump B from Svc.Pump B Returned to Svc & Placed on Standby + (01:31:40, 13 December 2024)
- ML20125E270 + (01:31:41, 13 December 2024)
- 05000312/LER-1979-024, Forwards LER 79-024/03L-0 + (01:31:42, 13 December 2024)
- ML20125E263 + (01:31:42, 13 December 2024)
- ML20125E259 + (01:31:44, 13 December 2024)