i,-CCH S2-14142 4
PillLADELPillA ELECTRIC' COMPANY PEACH llOrrOM ATOMIC POWER STATION R.D.1, llox 208 Delta, Pennsylvania 17314 rrArn enou -uw nmie a e u1ua vi (717) 456-7014 D. ri M.fler, Jr.
Vme Prent>rt December 9, 1992 Docket Nos. 50-277 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of November 1992 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
I Sincerely, -
'l LJ m
&l,'vg
'b wr6
/
DBMTAAF/TJN/DRM/MJB: cmc
- Enclosure cc:
R.A. Burricelli,' Public Service Electric & Gas T.M. Gerusky, Commonwealth ~of Pennsylvania J.J. Lyash, USNRC Senior Resident Inspector R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC li.C. Schwemm, Atlantic Electric C.D. Schaefer, Delmarva Power INPO Records Center CC1191NRC 1G002a p,f' 9212160295 921130 r
PDR ADOCK-05000277 R
\\
~.
' NRC hionthly Operations Summary ~
~ ~~'~ ~ ~
~
Peach llottom Atomic Power Station -
November 1992 UNIT 2 Unit 2 was shut down the entire month for the ninth refueling outage.
UNIT 3 Unit 3 began the month shut down with testing and maintenance activities for various hlOV concerns in progress.
Unit 3 returned to service on November 10. Power was reduced from 70% on November 11 after removing the "A" circulating water pump from senice (the "C" pump had previously been removed from senice for overhaul) to repair a circulating water screen and clean a condenser waterbox. Power ascension continued following repairs wiih power held briefly at 80% to repair a TIP machine. 100% power was reached on November 21 and maintained for tlie rest of the month.
CC1192.NRC
.i_,
y
- p11, y.
f.-
g
' r,
)
T Docket No,50 277 Attachment to Monthly Operating
. Iteport for November '1992 IMILLFEFUELLNG INFORMATION 1.
Name of facility:
Peach llottom Unit 2 2.
Scheduled date for next refueling shutdown:
Itcload 9 in progress.
- ~
3.
Scheduled date foi tertart following refueling:
flestart following refueling forecast for Decemler10,1992.
4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendnient?
No.
If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A i..
- 6.
- Important licensing considerations associated with refueling, e.g., new or different fuel design or supplieri _.
- unreviewed design or performance analysis methods, significant changes in fuel design, new operating ~-
procedures:
. Technical Specification Proposal 92-03 & 92 04 subinitted to USNRC to accomodate 24 month fuel cycle, J.
i e
-__..,.,,._.s
Docket No. 50-277 Attachment to Monthly Operating Report for November 1992 Page 2 UNIT 2 RITUEl. LNG INFORM ATION (Continued) 7.
The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblics (b)
Fuel l'ool - 1896 Fuel Assemblies,58 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 20(B without full core offload capability.
September 1997 with full core offload capability.
CC t l'I2.,N NC
.~
t
+
.~ Docket No. 50-278 -
~
Attachment to Monthly Operating Report for November 1992 UNIT 3 REFUEL. LNG INFORM ATION 1.
Name of facility-Peach Bottom Unit 3
~ 2.
Scheduled date for next refueling shutdown:
Reload.9 scheduled for September 4,1993 3.
Schediiled date for restart folising'reTucling~
- Restart fol:owing refueling scheduled for October 29,1993 4
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
No if answer is yes, what, in general, will these be?
N/A 5.
Scheduled date(s).or submitting proposed liceming ac! ion and supportingNformation:
N/A 6.
Important licensing considerations associated with' refueling, e.g., new or different fuel design or supplier, :
- unreviewed design or performance analysis methods, significant changes in fuel design, new operating --
procedures:
Technical Specification Proposal 92-03 & 92-04 submitted to USNRC to accomodate 24 month -
fuel cycle.
h CClIN.NRC
...r%..,
e
.-3,.-
Docket No. 50-278 l
Attachment to Monthly Operating Report for November 1992 Page 2 i
UNIT 3 ItElliEl,1N(; INFORM ATLQN (continued) 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblics (b)
Fuct Pool - 1945 Fuel Assemblics,6 Fuel Rods S.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been iequested or is planned,in number of fucl assemblies:
The spent fuel pool storage capacity has been relicensed for 3S19 fuel assemblies.
9.
The projected date of the last refueling that can be dischargeci to the spent fuel pool assuming the present capacity:
September 2004 without full core offload capability.
September 1998 with full core offload capability.
CCI 192.NilC
4
~
h AVER ACE DAILY UNil POWER LEVEL 00Crti ko. 50 277 UNt1 PLACH B0110H UNIT 2 DATE LtttMBER 15, 1972 COMPANf Pnit ADELPHI A [LCCtRIC COMPANY M. J. BARON
$UPIRVISOR REPORTS GROUP PEACM B0fl0M ATOMIC POWER SIAllDN TELEPHONE (717) 456-7014 EXI. 3321 MONIH kOVfMBfR 1992 DAY AVERACE D AILY POWER LEVEL DAY AVE R ACE t, A !LY POWE R L IVi t (MWL hET)
(Mst hET) 1 0
17 0
2 0
18 0
3 0
1Y 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
2B 0
13 0
29 0
14 0
30 0
15 0
16 0
.-g
-:-:6.
+
6'
- .q :
.s j
_ l
' AVf. RAGE CA!LY UNil POWER LEVEL -'
i DOCKET NO. 50 - 278
- UNil PEACH B0iiOM UNii 3 DATE DECEMBER 15, 1992 COMPANY PHILADELPHIA flfCTRIC COMPANY H. J. BARON SUPERVISOR REPORi$ GROUP PEACH SOfiOM AICNIC POVER SIATION.
TELEPHONE (717) 456 7014 Exi. 3321 MONfH NOVEMBfA 1992 DAY AVERAct DA!LY POWER LEvtl DAY Avt# ACE DALLY PCMER LEVEL (MWC NE T )
~(MVEahti) 1 0
17 1047 2
0 18 1046 3
0-19 1047 4
0 20 1047 5
0 21
- 1040 6
0 22 1052 7
0 23 1046 8
0-24 -
1047 -
9.
0 25 1049 ~
10 105 26 '
1043
.11 454
-27 1036 12.
298 28 1049 13 705 29 1035 e
14.
950 -
30 1047 15
'1043-
-16 1046 E
a
- .-u a
t.
- -,. -... L, i,-.--, e:.
-........,.. ~.. -
.-.-.,.-,,,,.,.,.w,_..-
...,,n,,.
.n.
OPERAllNG DATA REPORT DOCKET No. 50 - 277 DATE DECEMBER 15, 1992 COMPLETED BY PHIL A0ELPHI A E LECTRIC COMr ANY M. J. BARON SUPERVISOR REPORTS CROUP PEACH BOTTOM ATOMIC PCWER ST ATION TELEPHOhE (717) 456 7014 EXT. 3321 OFERATINO STATUS
- 1. UNIT NAME: PEACH BOTICM VNll 2 l NOTES:
- 2. RfPORilNG FERIOD: kOVrMBER, 1992
- 3. LICt NSED THERMAL F0WER(MWT):
3293
- 4. NAMEPLATE kATING (CROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATINO (NET MWE):
1065
- 6. MAtlMUM DEFENOABLE CAPAClIY (CROSS MWE): 1098
- 7. MAxlMUM CEPEh0ABLE CAFAClif (hET MWE):
1C55
- 8. IF CPAh;ES OCCUR IN CAPACl1Y RATINCS (llEMS NUMSER 3 THROUGH 7) S!hCE LAST REPORT, CIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NE T MWE):
- 10. RE ASCNS FCR RESTRICT !CNS, IF ANY:
THl$ MONTH fR-TO-DATE CUuutATIVE
- 11. HOURS IN REPORTINO PERIOD 720 8,040 161,376
- 12. NUMBER OF HOURS REACTCR WAS CRITICAt 0
5,568.1 97,822.1
- 13. RE ACIOR RESERVE SHUT 00b4 HOURS 0.0 0.0 0.0
....... ~..
14 b0URS CEkERATOR ON-LINE 0.0 5,320.7 94,153.2
- 15. UNIT RESERVE SHUTCOWN HOURS 0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY CENE9ATED (MWH) 0 16,781,064 279,320,793
- 17. CRCSS ELECTRICAL ENEROY GENERATED (MWH) 0 5,563,000 91,851,590
- 18. NET ELECTRICAL ENERGY CENERATED (MWR) 3,9 76 5,361,370 87,978.603 PACE 1 CF 2
Ot[PAflNG DAT A &lPORT (CON 11NUID)
(s0Cl[i h0. 50 - 277 C:Al[ Citt Miit R 15, 1772 THIS MOhfH YR 10-DATE CUMJL All VE r
IV. tNif itRylCt FACTop 0.0 66.2 58.3
- 20. Uk11 AVAILABill1Y IACica 0.0 6t>. 2
$b.3
- 22. UNil CALAtlly FAC104 (Us1N; LER hti) 0.0 62.6 51.2
- 23. UNii f 0PCED (AJf ALE $ Att 0.0 13.1 14.5
- 24. SHU1DCMWs LCHL DUL[D OVt R kt KT 6 MDNTHS (1YF E, O Af f, AND DUR All0N OF f ACH):
hune
~^
N/A
- 26. Ukift IN IFS 1 $fATUS (FRIOR TD CO &ttCIAL Or[ rat!ON):
FoutCA$f ACH![vtD Ikit!AL CR111CAlltY 09/10/73 Ihlf!AL [LICTRICITY C2/18/74 COMM!PCIAL OftPAllCN 07/05/74 FACE 2 Of 2 htCAflVI VALUt Rt00RILD TOR CON 5151[NCY Wi1H FIDERAL ENERGY RECULATDRY COMMIS$10N RtFOR15.
i i
f CtERAllNG CATA k(PORT DOCKlf NO. 50 278 CAff DECEMBER 15, 1992 COMPLifED BY PHILADELPHIA (LECTRIC COMPANY M. J. BARON
$UPIRVl$0R REPORi$ GROUP
. PLACH B0110M ATOMIC PCWiR STA110N i
ItttPHON( (717) 456 7014 EXf. 3321 OFIRAtlNG STATUS
- 1. UNIT NAME1 PIACH BollOM UN,* 3 N0f f $ 3
- 2. REPORi!NG PIRIOD: NOVEMBER, 1 W2
- 3. LICENSED THERMAL POWER (MWT):
3293
- 4. NAM (PL ATE RAi!NG (Gross MWE):
1152
- 5. OtSIGN titCTRICAL RATING (Nil MWt):
1065
- 6. MAXIMUM D(FINDABLE CAPACITY (GROSS MVE): 1098
- 7. MAXIMUM DEP(NDABLE CAPACl!Y (NET MWE):
1035
- 8. IF CHANCES DCCUR IN CAFACITY RATINGS (ifEMS NUMGER 3 THRCUGH 7) $!NCC LAST REPORT, Glvt.RCASONS:-
- 9. POWER LEVEL 10 VHICH RESTRICifD, IF ANY (NET MWE):
- 10. k[ASONS FOR Ri$1RICTIONS, JF ANY:
TH15 MONTH TR*f0+DATE CUMUL AT IVE.-
- 11. HOUR $ IN REPORTING PERIOD 720 8,040 157,272
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 507.0
- 6,952.3 97,314.4'
- 13. REACIOR ret [RVE $HUTDOWN HOUR $
0.0 0.0 0.0 t
14.-HOURS CENTRATOR ON LINE' 498.0 6,660.2 93,965.2
- 15. UNil RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,463,904 20,125,344 276,219,274 17.' GROSS ELECTRICAL ENERGY CENTRATED (MWH) 477,200 6,663,200
. 90,665,732-
- 18. Nt1 ELECTRICAL EWiRGY GENERATED (MWH) 459.866 6,429,887 -
86,912,904f PAC &~1 0F 2 h
3 r
F M
" Wit's4y-wm
.m vN y
wi ap
.C
-e.y
%.g, y
mr mf' sayu-*g m:4i"w tewyVV N
y-twn-e mWy-r<isw+Ns'-
4'em.es y+w-'u 4*Mw dw g
g apsew'me
-2
l
- t
{
4 4
l OltR A11hG CAT A R(PORT (COhilkUCD)
DOCtli NO. 50 278 I
)
s L
CAlt CECt ett 15, 1??2 i
l IHis NONTH VR*10-DATE CUMULATIVI~
l
- 19. UN11 SERV!CC fACf0R 69.2 82.8 59.7 l
- 20. UNll AVAliA81Liff FACTOR 69.2 82.8 59.7 l
21, UNIT CAPAClif FACTOR (U5thG MDC Nft) 61.7 77.3 53.4
??. UNif CAI Atif f I ACTOR (USING DLR hti) 60.0 75.1 51.9
- 23. UN11 FORCID OUTAGE Raft 30.8 13.4 12.8 i
?4. $3U1 DOWNS $CNIDUlth OVER h[X16 MONTHS (f fff, DAf t, AND DURA 110N OF ( ACH):
N6ne 25.17 SHUfDOW AT END Of REFONI f'ERIOD, ($f!MA1ED DATE Of 5fAR1UP:
Dec entier 10, 1992
)
- 26. UNil$ IN 1($1 $I A10$ (0RIOR TO COMMERCI AL OPERA 110N):
TOR [ Cast ACHitytD '
r INillAL CRillCAll1Y 08/07/74 t
IN!11AL EL(CYPICITY CC '01/ 74 COMMIRCI AL Ol'[ RATION 12/23/74 PACE 2 0F 2 r
W 4
4 e
s P
5"f* Nt T ug bT"$r'su'4N 7 WW PrW N M W F-t'r TW T W
- rf "'m
-f
'w w wSe g +w nhw sm *W men,m -iursuerw1TN-+e**W-eW'**NN"deMwM*T'
tew9"4' ump-e - m e -N W
3
.4
.g UNIT SHUTDOWNS AND POWER REQUCTIONS DOCKET NO. 50 277 UNIT NAME PEACH 60ffEN UNIT 2
'DATE t,ECEMBER 15, 1992 REPC%1 M s tH NOVEMBER, D92 COMPLETED BY PHILADELPHIA ELECTRIC COM*AkV M. J. BARON-
$UPERVISOR REPOR15 CROUP-PEACH Boff 0H ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXI. 3321' METH00 Of LICENSEE SYSTEM COMFONENT CAUSE AND CORRECilVE fyPE DURAll0N REASON
$ HUTTING DOWN
, EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 18 921101 5
0,0 C
1 NA RC FUELXX SHUIDOWN FOR REFUELING OUTAGE (1).
(2)
(3)
(4)
F FORCED REA$0N METHOD EXH16ti G + INSTRUCTION $.
5. SCHEDULED
-A - EQUlPMENT FATLURE ! EXPLAIN) 1
ENTRY SHEETS'fDR LICENSEE C
- REFUELING 3. AUTOMAllC SCRAM.
.EVEhi REPORT (LER);
.D REGULATORY RESTRICil0N-4.. OTHER (EXPLAIN)
FILE (NUkEG.0161)
E OPLRATOR TRAINING + LICENSE EXAMINATION F, ADMINISTRAT!VE (5)
G + 0PERATIONAL ERROR (lXPLAIN)
H -'OTHER(EXPLAIN)
EXHIBli !. $AME SOURCE
_-.7..-
um m....
pW
a e.
l UNll SHUTDOWNS AkD FDW'ER REDUCi10NS DoctEi k0. 50 - 278 Uhli NAME FEACH B011DM UNil 3 DATE DE CE MBE R 15, 1992 REPORT MONTH NovtMDER, 1992 COMPLETED BY FHIL ACELPHI A ELECTRIC COMPANY M. J. BARON SUPERVISOR REFORi$ fROUP FEACH BOTTDM AIDMit POWER STATION TELErHONE (717) 456*7014 Ext. 3321 8
8 METHOD Or LittNSEE ' SYSTEM COMPONENT CAUSE AND COGRECilVE I
f f PE DUR Atl0N RE ASON SHulijkG 09WN EVfNT CODE CODE Atil0N 10 fDAlt
,1)!(HOURS)
(2)
REACTOR (3)
REFOR1 #
(4)
(5)
FPEVENT AECURRENCE
- a 23 921101 F
222.0 A
3 3 92 08 SH VAlvtx VAR.0US M010R OPERATED VALVES (HPCi 0C10, RHR, ETC.)
24 921111 f
0.0 A
4 N '.
Hf flL1ER REFAIR Cist '.AllNG WATER SCREEN I
REAC10R NOT HUID 36;J l
t i
, i?2.0 (1)
(2)
(3)
(4) f FORCED REASON METHOD ExHlati G INSTRUCTICNS S
- SCHLDutEO A
E0VIFMEh! FAILURE (EXPLAIN) 1 MANUAL TOR FREP ARATION OF C AT A B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEE15 FCR LICENSEE C - RifUEllk; 3 AUTOMATIC SCRAM.
EVENT REPORT (LER)
D REGULATORY RESTRICTION 4 OTHER (EXPLAIN)
FILE (NUREG 0161)
E - CPERATOR TRAINING + LICENSE EXAMINAi!DN f
AOMikl$iRATIVE (5)
G OPERA 110N AL ERROR (EXPL AIN)
H - OTHER(ExFLAIN)
ExHIBli 1 SA*E SOURCE
. _ - - _ - _ _ _ _ _ - _ _ _ _ _ - _ _ - - - _ _ _ - _ - - _