Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126B697 + (01:13:22, 13 December 2024)
- ML20126B696 + (01:13:22, 13 December 2024)
- ML20126B695 + (01:13:23, 13 December 2024)
- 05000312/LER-1980-014-03, /03L-0:on 800219,while Moving Aris Calibr Block, Sling Failed & 3,000 Lb Block Fell Into Flange Transfer Canal.Caused by Inadequate Sling Utilized for Lift.Speed Change Problem Corrected + (01:13:26, 13 December 2024)
- 05000312/LER-1980-014, Forwards LER 80-014/03L-0 + (01:13:27, 13 December 2024)
- ML20126B691 + (01:13:27, 13 December 2024)
- ML20126B689 + (01:13:28, 13 December 2024)
- ML20126B688 + (01:13:29, 13 December 2024)
- ML20126B687 + (01:13:30, 13 December 2024)
- ML20126B682 + (01:13:34, 13 December 2024)
- ML20126B684 + (01:13:34, 13 December 2024)
- ML20126B681 + (01:13:35, 13 December 2024)
- ML20126B680 + (01:13:36, 13 December 2024)
- ML20126B677 + (01:13:36, 13 December 2024)
- ML20126B676 + (01:13:37, 13 December 2024)
- ML20126B674 + (01:13:38, 13 December 2024)
- ML20126B673 + (01:13:39, 13 December 2024)
- ML20126B672 + (01:13:39, 13 December 2024)
- ML20126B671 + (01:13:40, 13 December 2024)
- ML20126B670 + (01:13:41, 13 December 2024)
- ML20126B667 + (01:13:42, 13 December 2024)
- PNO-II-80-032A, updating PNO-II-80-032.Reactor Conditions Have Stabilized & Dome Radiation Decreased to Zero. Containment Pressure Returned to Normal.Steam Generator Levels About 90% W/Natural Circulation in Progress + (01:13:43, 13 December 2024)
- ML20126B664 + (01:13:43, 13 December 2024)
- U-600069, Forwards Emergency Plan Implementing Procedure EC-13, Reactor Core Damage Estimation. Procedure Revised to Include Third Core Damage Class,Referred to as Fuel Overheat Per TMI Item II.B.3 + (01:13:44, 13 December 2024)
- ML20126B661 + (01:13:45, 13 December 2024)
- ML20126B659 + (01:13:46, 13 December 2024)
- ML20126B658 + (01:13:48, 13 December 2024)
- ML20126B657 + (01:13:48, 13 December 2024)
- ML20126B656 + (01:13:49, 13 December 2024)
- U-600029, Forwards List of Selected Operating Events to Be Used in Sys Function & Task Analysis,Per 850424 Responses to NRC Comments on Dcrdr Program Plan.Plan Process Fulfills Suppl 1 to NUREG-0737 Requirements + (01:13:50, 13 December 2024)
- ML20126B651 + (01:13:51, 13 December 2024)
- ML20126B653 + (01:13:51, 13 December 2024)
- ML20126B650 + (01:13:52, 13 December 2024)
- ML20126B649 + (01:13:53, 13 December 2024)
- ML20126B648 + (01:13:54, 13 December 2024)
- ML20126B646 + (01:13:54, 13 December 2024)
- PNO-II-80-028, on 800219,criticality Warning Sys Experienced False Alarm.Fuel Mfg Bldg Evacuated.No Abnormal Radiation Levels Existed + (01:13:55, 13 December 2024)
- ML20126B639 + (01:13:56, 13 December 2024)
- ML20126B636 + (01:13:57, 13 December 2024)
- ML20126B637 + (01:13:57, 13 December 2024)
- ML20126B635 + (01:13:58, 13 December 2024)
- ML20126B634 + (01:13:59, 13 December 2024)
- ML20126B633 + (01:13:59, 13 December 2024)
- ML20126B632 + (01:14:01, 13 December 2024)
- PNO-II-80-032C, updating PNO-II-80-032.Plant Remains in Stable Hot Standby.Repairs & Testing of Inoperable Decay Heat Closed Cycle Cooling Pump Expected to Be Completed Today.After Testing,Unit Will Be Shut Down + (01:14:02, 13 December 2024)
- ML20126B629 + (01:14:02, 13 December 2024)
- ML20126B625 + (01:14:03, 13 December 2024)
- ML20126B627 + (01:14:03, 13 December 2024)
- ML20126B623 + (01:14:04, 13 December 2024)
- ML20126B620 + (01:14:05, 13 December 2024)
- ML20126B617 + (01:14:06, 13 December 2024)