Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126B733 + (01:12:53, 13 December 2024)
- ML20126B732 + (01:12:54, 13 December 2024)
- ML20126B730 + (01:12:55, 13 December 2024)
- ML20126B729 + (01:12:56, 13 December 2024)
- PNO-I-80-024, on 800210,facility Lost Incoming 345 Kv Transmission Line.Caused by External Power Sys Problems.Core Defueled & Spent Fuel Pool Temp Remained Relatively Constant During Event + (01:12:57, 13 December 2024)
- ML20126B727 + (01:12:58, 13 December 2024)
- ML20126B725 + (01:12:59, 13 December 2024)
- ML20126B726 + (01:12:59, 13 December 2024)
- PNO-I-80-028, on 800214,during Plant Startup W/Turbine at Rated Speed But Not Tied to Grid,Loud Noise Was Heard in Low Pressure Turbine Accompainied by Excessive Vibration. Turbine Coasted to Stop & Could Not Be Rotated + (01:13:00, 13 December 2024)
- ML20126B723 + (01:13:01, 13 December 2024)
- PNO-III-80-035, on 800222,Tri-State Semitrailer Containing Low Level Waste Was Involved in Accident.Trailer Was Hit on Side by Pickup Truck,But Remained Upright.Contents Intact.No Injuries Occurred + (01:13:01, 13 December 2024)
- ML20126B720 + (01:13:02, 13 December 2024)
- ML20126B719 + (01:13:03, 13 December 2024)
- ML20126B718 + (01:13:04, 13 December 2024)
- ML20126B717 + (01:13:04, 13 December 2024)
- ML20126B716 + (01:13:05, 13 December 2024)
- ML20126B714 + (01:13:09, 13 December 2024)
- ML20126B711 + (01:13:10, 13 December 2024)
- ML20126B713 + (01:13:10, 13 December 2024)
- ML20126B710 + (01:13:11, 13 December 2024)
- PNO-I-80-030, on 800218,while Refueling Core W/Pool Clarity & W/Approx 1/3 Core in Place,Problems Experienced in Seating Assembly.Assembly Placed in Core Improperly & Tilted Over. Area Evacuated + (01:13:12, 13 December 2024)
- ML20126B707 + (01:13:13, 13 December 2024)
- ML20126B708 + (01:13:13, 13 December 2024)
- ML20126B706 + (01:13:14, 13 December 2024)
- ML20126B705 + (01:13:15, 13 December 2024)
- ML20126B704 + (01:13:18, 13 December 2024)
- ML20126B701 + (01:13:20, 13 December 2024)
- ML20126B700 + (01:13:20, 13 December 2024)
- ML20126B699 + (01:13:21, 13 December 2024)
- ML20126B697 + (01:13:22, 13 December 2024)
- ML20126B696 + (01:13:22, 13 December 2024)
- ML20126B695 + (01:13:23, 13 December 2024)
- 05000312/LER-1980-014-03, /03L-0:on 800219,while Moving Aris Calibr Block, Sling Failed & 3,000 Lb Block Fell Into Flange Transfer Canal.Caused by Inadequate Sling Utilized for Lift.Speed Change Problem Corrected + (01:13:26, 13 December 2024)
- 05000312/LER-1980-014, Forwards LER 80-014/03L-0 + (01:13:27, 13 December 2024)
- ML20126B691 + (01:13:27, 13 December 2024)
- ML20126B689 + (01:13:28, 13 December 2024)
- ML20126B688 + (01:13:29, 13 December 2024)
- ML20126B687 + (01:13:30, 13 December 2024)
- ML20126B682 + (01:13:34, 13 December 2024)
- ML20126B684 + (01:13:34, 13 December 2024)
- ML20126B681 + (01:13:35, 13 December 2024)
- ML20126B680 + (01:13:36, 13 December 2024)
- ML20126B677 + (01:13:36, 13 December 2024)
- ML20126B676 + (01:13:37, 13 December 2024)
- ML20126B674 + (01:13:38, 13 December 2024)
- ML20126B673 + (01:13:39, 13 December 2024)
- ML20126B672 + (01:13:39, 13 December 2024)
- ML20126B671 + (01:13:40, 13 December 2024)
- ML20126B670 + (01:13:41, 13 December 2024)
- ML20126B667 + (01:13:42, 13 December 2024)
- PNO-II-80-032A, updating PNO-II-80-032.Reactor Conditions Have Stabilized & Dome Radiation Decreased to Zero. Containment Pressure Returned to Normal.Steam Generator Levels About 90% W/Natural Circulation in Progress + (01:13:43, 13 December 2024)