ML20126B717

From kanterella
Jump to navigation Jump to search
Forwards Westinghouse PWRs Tech Specs & Board Notification Re Licensee Regulatory Performance Evaluation,In Repsonse to 790427 & 0504 Requests
ML20126B717
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/04/1979
From: Chandler L
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Ellis J
Citizens Association for Sound Energy
Shared Package
ML20126B715 List:
References
NUDOCS 8003190309
Download: ML20126B717 (1)


Text

  • . G . . .* '

Attachment S 9'

I

?-

Docket Nos. 50-445 May 4,1979. ' ~

50-446 ,

F

?<

Mrs. Juanita Ellie D i $

Prccident, CASE '

- /h j// // fj h[,f 'l 1426 South Polk Street ~b / t.

Dallas, Texas 75224 Dear Mrs. Ellis;

.,  ; y .

~ . , y * .Q ~' .-l;; if&;

Enclosed in accordance with your telephone requests of April 27 and May 4, .

1979, are:

l

( 1. Standardized Technical Specifications for Westinghouse PWRS (Pressurized Water Reactors) _

l

2. Board Notification - Licensee Regulatory Performance Evaluation e

Sincerely,. <l ,. ,-

Lawrence J. Chandler Counsel for NRC Staff

Enclosures:

As stated i

=

D 8003190  :) i 30

Attachment T Au, un 17,197 9 lhi. itn TJ11s In: ... . : ; , C!.Sr, 3426 '..ra le2h Strcot It:13. f , U 75224

, In the 12 ttcr of Texas Utilities Generating Co=peny, et al. l (Concnche Peak Steam Electric Station, Units 1 and 2) l Docket Mos. 50-4',5 cnd 50-446 D:cr 1:rs. Ellis:

As I e:micin d in our telcphone conv(rration on /,.:gurt 14, 1979, in response t'o your requect, na cre forwarding to gu un::er scpr.rt.te cover threc (3) 8 copics of NiTIG-0!50, 'lcle.1, 2 rnd 3. /Jtl.euch vc cre providin you with the number of copic:: you rcquccted, in the future no vill not furnich rore than one copy of a particular docucent.

Sincerely, i

i l

l Marjorie B. Ulcan Counsci for NRC Staff cc: Service List 6 L E w c

7c7ol/402Ez

a 4 A,ttachment U December 14, 1979 Mrs. Juanita Ellis, President '

CASE (Citizens Association for Sound Energy)

~

b) ~ j 1426 S. Polk -

. ;l Dallas, TX 75224 .y .. 4i hf i

, jl In the Matter of Texas Utilities Generating Company, et al.

(Comanche Peak Steam Electric Station, Units 1 and 2)

Docket'Nos. 50-445 and 50-446

Dear Mrs. Ellis:

This is in response to your letter of October I We will address each request in turn: 30, 1979, "Information Requests " .  !

1.

t Sinceisthis reply request is of Nick Reynolds for the FSAR and ER, no necessary.

l '

l L

2.

As we advised Mr.' Touke in response to his similar request, it is generally lists for reportsI6E policy fromgthat to include office. intervenors on the distribution ,

1 Upon their public release, copics are, however, sent to appropriate local public document rooms.

However, in this proceeding we have requested that I6E add all parties to Comanche for the distribution Peak. list for I&E investigation and inspection reports

3. -

I have confirmed with Mrs. Souder of the 1.ocal Public Document Room Branch that copies of all 16E reports in connection with Comanche j Peak a weeklyarebasis. being sent to the University of Texas, Arlington (UTA), on  :

You should recognize, however, that there may be a gap between the date of the report and its public release, in view of the proprietary considerations attendant to some of the matters covered 1n such reports.

Mrs. Souder also advises that TSAR and ER amendments are being sent to UTA as well, as soon as possible i

i after their receipt.

1 I vould local likedocucent public to reiterate room.that the facility at UTA is not an official Rather, it is a nini-local public docu-ment room, set up on a temporary basis for the public's convenience and contains only selected documents (e.g. TSAR, ER, and amendments, I6E reports).

N A The official local public document room established

%nche "cak faciMt@-4oceted in Cice h. .

-gp e 2 0 0 6 3 2.

  • r e

_2

( 4.&5. We have obtained and enclosed copies of the NRC investigation and inspection reports which relate to the allegations and subject matter a Specified in these sections of your letter. The Ictter dated '

September 28, 1979, and attached report (#99900529/79-01)' documents the NRC investigation of the allegations received by NRC relating primarily to activities performed by Southwest Research Institute

  • at NRC licensed nucicar reactor facilities. NRC investigation and inspection reports (78-12 (August 22, 1978); #79-01 (February 16, l.

. 1979); f 79-04 (April 11,1979); and f 79-14 (October 16, 1979) cover a11cgations of falcification of documents and intimidation of Brown

& Root quality assurance / quality control inspectors at the South Texas Project. All of these reports have been pieced in the NRC Public Document Room.

These reports ' appear to provide the information you are seeking regarding the thoroughness of the investigations.and the substance if any, to these allegations. ,

We trust that th'e foregoing responds to the inquiries contained in your letter.

With respect to your other letter of October 30, 1979, regarding the wording of the stipulation and con'tentions, we are still considering your comments and expect to provide a full response (including any revisions) very shortly.

j Sincerely, Lawrence J. Chandler Marjorie U. Rothschild Counsel for NRC Staff

Enclosures:

As stated ec w/o encis: Service List A

g ,

e ==

5 9

0 e

- a e.

P

!.' Attachment V 4

t D cember 27, 1979 Docket Nos. 50-445 50-446 l

l

!!rs. Juanita Ellis, President CASE (Citizens Association for Sound Energy) 1426 S. Polk Dallas, TX 75224 l

Dear Mrs. Ellis:

This is in reply to your ietter of December 10, 1979, to Mr. D. B. Vassallo, Acting Director, Division of Project Management, requesting two extra copies of !!UF.EG-0630.

l As I recently advised you by phone, copics of 2' RECS can be obtcined directly I from the Distribution Services Branch. They cay be contacted by phone at (301) 492-7333, or by mail. As a courtesy to you in this instance, however, >

(( I have obtcined the two extra copics of MIREG-0630 you recucrted and enclose them with this letter.

1 As you are aware, this NUREG is still in draft form. I have been advised (

that the final version is not scheduled to be completed for about two months and that comments on the draft may still be submitted for Staff l consideration.

Sinec ely, Lawrence J. Chandler Counsel for NRC Staff

Enclosures:

As stated l

4 DQh un p I 0 20 3 "i l

D Attachment W Decl+1 8.'es. 50 44E U"""'# II' I

, c n_ .m .

' rs . Jucr.i tt Elli:,, T rt. sic:cnt CASE (Citizens Association for Cou nt' Enc rgy) 142C 0. Poll Callas, TX 7E.224 In the f tatter of _

Texas Util1 ties Ccnerating Company, et al. -

(Conanche Peck Steen Electric Station, Units 1 and 2)

Doc ket i;os . f,G-445 and 54-446

Dear 'trs. Ellis:

(- In rc;1y tc Itcr 2 of your letter of Cctober 30, 1979, rcgsrdine the tiraf t stirulation and contentions, uc have enclosed a copy of fir.C Translation f4ET,

" Investigations On The Conrarison of Createst Possible Accident Consequences In a Reprocessine Plant and in a l!uclear Poucr Plant (Critical Conents on Ucrt P.eport AB-290). The attached copy of a letter dated ' lay 14, 1970, fron Joseph D. Lafleur, Jr., Deputy Director, Office of International Prograns, concerning this report also hears on your request.

Also enclosed is a copy of the recent Appeal Board decision (ALAB-574) and Federal Peaister flotice (44 fed. Reg. 61372) (dealing with your contention 6 c.

and d.) which you requested in your telephone conversation with Larry Chandler, on January 16, 1900.

l Ue will contact you shortly to finalize the stipulation.

Sincerely, i

I',arjorie i'othschild Counsel for imC Staff h

ib 3

h'M

,y3 h f )A"'\;y, M %

w C

900l%'C~Q!$