Informs of Status of Training Program for Td Keith,Facility Radiation Protection Manager,In Further Response to Draft SER (NUREG-1002) Unresolved Confirmatory Issues,Part A,Item 8.All Training Completed Except Attendance at Refueling
ML20126B707
Person / Time
Site: Braidwood  
Issue date: 06/07/1985
From: Danni Smith
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-1002 0224K, 224K, NUDOCS 8506140187
Download: ML20126B707 (2)


Text

. _ _ _.. _ _ _ _ _

[^x Commonwealth Edison

-/

) One First. National Plaz3, Chicago, liiinois C '7 Address Fleply to: Post Office Box 767 Q' Chicago, lilinois 60690 June 7, 1985 Mr. Harold R. Denton U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC. 20555

Subject:

Braidwood Station Units 1 & 2 Radiation Protection Manager Training NRC Docket Nos. 50-456/457 Reference (a):

8.J. Youngblood Letter to D.L. Farrar dated July 15, 1983 (b):

E.D. Swartz letter to H.R. Denton dated September 30, 1983

Dear Mr. Denton:

Referenced (a) provided a draft SER, NUREG 1002, for our Braidwood Station and requested written response to the unresolved

' issues.

Reference (u) supplied that response and included a training program for the Radiation Protection Manager.

The purpose of this letter is to inform you and your staff of the current status of that training to assist in closing SER Confirmatory Issues Part A Item No. 8.

The attachment to this letter shows the detailed status of RPM Training.

It reveals that Mr. Keith has completed all of the training assignments except for attending the first refueling at Byron Unit 1 which is scheduled to occur 18 months from now.

Please address any questions that you or your staff may have concerning this matter to this office.

One signed original and fifteen (15) copies of this letter with attachment are provided for your use, ry truly yours, 8506140187 850607 v;Ji&[ JL PM ADOCK 05000456 David H. Smith

/klj Attachment cc:

J. A. Stevens I

W. B. Grant (Region III)

Ob NRC Resident Inspector-Braidwood l

L L_

h

a o;-

F STATUS OF RPM COMMITMENTS Timothy O. Keith Station = Health Physicist-Braidwood Station

. ASSIGNMENT:-

Six weeks at Zion Station during the current refueling outage.

STATUS:

Completed between August 29 and October 9, 1983.

ASSIGNMENT:

Byron Station start-up.

-STATUS:

10% start-up testing.. Completed February, 1985~

(Time. spent: 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />).

50% start-up testing.

Completed April, 1985 (Time spent:

20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />).

Also intend to monitor 100% start-up tests as schedule permits.

ASSIGNMENT:

Byron Station during first refueling.

STATUS:

Byron refueling scheduled for December 1986.

The current schedule calls for Braidwood fuel load in April 1986.

In this event the meeting between-Byron and Braidwood health physicist personnel will be held to discuss both the positive and negative health physicist _ aspects of the Byron Station refueling outage.

ASSIGNMENT:

Six days Introduction to Power Plant Operations.

STATUS:

Attended Zion IPPO May, 1983 (6 day course).

Attended PWR Indoctrination at Braidwood May, 1984 (two-week course).

2-

  • ASSIGNMENT :

Three days Management By Objectives.

g STATUS::

Attended January 31 through February 2, 1984.

t ASSIGNMENT:

Three days Kepner-Tregoe.

STATUS:

Attended June 12 through 14, 1984.

r June 5, 1985 0224K