Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20055E2841990-05-30030 May 1990 Final Response to FOIA Request.App C Record Encl & Available in PDR ML20246D8951989-08-18018 August 1989 Forwards Safety Evaluation Re Dispute Between Case & Util on Acceptability of Jul 1982 RCS Cold Hydrostatic Test ML20247Q4001989-07-27027 July 1989 Advises That Recipient 890713 Motion to Reopen Record Withdrawn,Per 890725 Request.W/Certificate of Svc.Served on 890729 ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245D0521989-06-16016 June 1989 Informs of Understanding of Dispute Between Case & Texas Utilities Electric Co,Including Issues Involved in Dispute & Update on NRR Plans for Resolution.Summary of Understanding of Dispute Encl ML20244B1211989-06-0909 June 1989 Partial Response to FOIA Request for Documents.Forwards App E & F Documents.App E Documents Also Available in Pdr.App F Documents Partially Withheld (Ref FOIA Exemptions 5,6 & 7). App G Totally Withheld (Ref FOIA Eexemption 7) ML20245J9461989-04-25025 April 1989 Partial Response to FOIA Request for Records.App B & C Records Available in Pdr.App D Documents Provided to Requestor But Not Publically Available Since Related to Oia Investigation Re Allegations by Client ML20247G6141989-03-28028 March 1989 Advises of Plans to Resolve Case Dispute W/Util Re RCS Cold Hydrostatic Test for Plant Conducted & Recorded in 1982,per Case 890313 & 17 Ltrs.Public Meeting Will Be Held in Arlington,Tx to Assure That NRC Understands All Info ML20235G1771989-01-17017 January 1989 Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6) IA-88-524, Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6)1989-01-17017 January 1989 Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6) ML20206H0921988-11-17017 November 1988 Partial Response to FOIA Request for Documents.Forwards App F Documents.App F Documents Also Available in PDR ML20206H5971988-11-14014 November 1988 Responds to Appeal of Partial Denial of FOIA Request for App F Documents.Request Approved in Part & Denied in Part. Portions of Documents 1,3,5,23,25 & Attachments to Document 20 Withheld (Ref FOIA Exemption 5) ML20206H4941988-11-10010 November 1988 Final Response to FOIA Request for Documents.Forwards Documents Listed in App a ML20206E7741988-11-0808 November 1988 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App B.Documents Being Placed in Pdr.App a Documents Also Available in Pdr.Documents Listed in App C Totally Withheld (Ref FOIA Exemption 5) ML20195G1951988-11-0808 November 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents & Records Available in Pdr.App D Documents Also Available in PDR ML20206C1801988-10-17017 October 1988 Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl IA-88-152, Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl1988-10-17017 October 1988 Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl ML20205E9561988-10-0505 October 1988 Final Response to FOIA Request for Documents.Forwards App B Documents.Apps a & B Documents Also Available in PDR ML20151W5631988-08-16016 August 1988 Forwards Memo to Jg Partlow Re Mutually Agreed Upon Interpretation of Certain Provisions of Joint Stipulation in Proceeding.W/O Encl.Related Correspondence ML20196H0571988-06-23023 June 1988 Forwards Draft Pages from Ofc of Inspector & Auditor Rept 86-10, Allegations of Misconduct by Region IV Mgt Re Comanche Peak Steam Electric Station, Per Attached List.W/O Encls.Related Correspondence ML20195E8821988-06-15015 June 1988 Third Partial Response to FOIA Request for Documents.App C, E,F & G Documents Encl & Available in Pdr.App D Documents Available in Pdr.Portions of Records Subj to Request Withheld (Ref FOIA Exemptions 4,5,6 & 7) ML20155C3731988-05-25025 May 1988 Advises of Projected Schedule for Issuance of NRC Ssers Re Collective Significance & Evaluation Repts,Per . Next Rept on Cable Trays Should Be Issued on 880624 & Sser Re Environ Activities Anticipated on 880630 ML20155C3071988-05-24024 May 1988 Advises That NRC Counsel Will Not Be Executing Nondisclosure Statement,Per NRC Manual Chapter Governing Treatement of Protected Info by NRC Employees,Per Recipient ML20151M6061988-04-19019 April 1988 Responds to FOIA Request for Info Re Scores of Reactor Operators & Senior Reactor Operators.Forwards Requalification Exam Summary Source Sheets Listed in Encl App W/Personal Privacy Info Deleted ML20148J7801988-03-25025 March 1988 Final Response to FOIA Request for Documents Re Insp Repts 50-445/87-27 & 50-446/87-20.App B Documents Encl.App a Documents Available in PDR ML20150C7341988-03-15015 March 1988 Final Response to FOIA Request for Documents.App I Documents Encl & Available in Pdr.App J Records Totally Withheld (Ref FOIA Exemption 5) ML20150C1241988-03-14014 March 1988 Final Response to FOIA Request for Documents.Forwards App F Documents.Apps E & F Documents Available in PDR ML20147E4681988-03-0202 March 1988 Partial Response to FOIA Request.App C Documents Encl & Available in Pdr.App D Documents Re Insp Repts 50-445/85-07 & 50-446/85-05,Ofc of Inspector & Auditor Rept 86-10 & ASME Code Hydrostatic Test Encl & Available in PDR ML20147D7651988-03-0101 March 1988 Final Response to FOIA Request for Documents Re Insp Repts 50-445/87-23 & 50-446/87-17.Forwards App B Document.App a & B Documents Available in PDR ML20196B2161988-02-0505 February 1988 Responds to Appeal of Denial of FOIA Request for Documents Listed on App C,Per Dh Grimsley .Encl Documents Listed on App Also in Pdr.Documents Partially Withheld (Ref FOIA Exemptions 5 & 7) ML20147B3821988-01-13013 January 1988 Final Response to FOIA Request.App H Documents Re Correction to Ofc of Inspector & Auditor Rept Encl & Being Made Available in PDR ML20147C0281988-01-12012 January 1988 Final Response to FOIA Request for Documents Re Safeteam Program.Forwards App I & J Documents.App H & I Documents Available in Pdr.Other Records Available in Pdr.App J Documents Partially Withheld (Ref FOIA Exemption 6) IA-87-634, Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr Dtd 8712101988-01-11011 January 1988 Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr Dtd 871210 ML20147A8261988-01-11011 January 1988 Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr ML20237A5081987-12-10010 December 1987 Partial Response to FOIA Request.Forwards App G Documents. Documents Also Available in PDR ML20236X5841987-12-0808 December 1987 Final Response to 871106 Appeal of Dh Grimsley 871027 Denial of Documents for FOIA Request Re Keppler to Counsil on Facility.Listed Document Partially Released & Encl.Stated Documents Withheld (Ref FOIA Exemption 5) ML20236V6351987-12-0202 December 1987 Responds to Appeal Re Denial of FOIA Request for Documents Re Stello 871021 Memo Establishing Comanche Peak Rept Review Group & Notes of Stello Meeting W/Involved Individuals.Info Withheld (Ref FOIA Exemption 6) ML20236V7221987-12-0202 December 1987 Provides Details of How NRC Will Make Documents Available to Parties Once Sser Issued Re Project Status Rept.Procedure Should Obviate Necessity for Any Party to File for FOIA Request or Production of Documents.Related Correspondence ML20236S4271987-11-19019 November 1987 Further Response to Appeals of FOIA Request for Records Re Evaluation of issue-specific Action Plan Re Plant.Documents I.2.b & I.10 Addressed in Responses to FOIA 86-A-203 & 86-A-204 & Contained in Other Documents Available in PDR ML20236Q5511987-11-17017 November 1987 Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR IA-87-684, Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR1987-11-17017 November 1987 Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR DD-87-17, Advises That Commission Declined Review of Director'S Decision DD-87-17.Time Provided by NRC Regulations for Commission to Act Expired.Decision Became Final Agency Action on 871110.Served on 8711171987-11-17017 November 1987 Advises That Commission Declined Review of Director'S Decision DD-87-17.Time Provided by NRC Regulations for Commission to Act Expired.Decision Became Final Agency Action on 871110.Served on 871117 ML20236P2581987-11-13013 November 1987 Advises of Tentatively Scheduled 871209 Public Meeting in Dallas,Tx to Discuss NRC Review of Corrective Actions Described in Util 870625,0820,28,0908 & 23 Ltrs.Comments Requested by 871201 for Inclusion in Agenda ML20236L7401987-11-0909 November 1987 Partial Response to FOIA Request for Documents Re Implementation of Piping Generic Technical Issue Resolution.Forwards Documents Listed in App A.App a Documents Available in PDR ML20236K0871987-11-0404 November 1987 Response to Appeal of Denial of FOIA Request for Documents Re Insp Rept 50-455/87-07 & 50-446/87-06.Documents Listed in Encl App Will Continue to Be Withheld (Ref FOIA Exemption 5) ML20245D0621987-11-0303 November 1987 Responds to Appeal Re Denial of FOIA Request for Documents Re Ofc of Investigations Investigation 4-84-050.Forwards Portions of Transmittal Memo Listed on App.Remaining Documents Continue to Be Withheld (Ref FOIA Exemptions 5) ML20236G6301987-10-30030 October 1987 Final Response to FOIA Request for Documents,Including V Stello 870414 Memo Re Comanche Peak Rept Review Group.Encl App B Documents Also in Pdr.App B & C Documents Partially & Completely Withheld (Ref FOIA Exemption 5) ML20236J9541987-10-29029 October 1987 Final Response to FOIA Request.App a Documents Re Mgt of Allegations Already Available in Pdr.App B Document Encl & Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) ML20245C4291987-10-29029 October 1987 Partial Response to FOIA Request Re Plant.App a Records Available in Pdr.App B Records Encl & in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5).App D Documents Partially Withheld (Ref FOIA Eexemption 6) ML20236D8821987-10-27027 October 1987 Partial Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Documents Encl & Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) 1990-05-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H7501999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209G7421999-07-0808 July 1999 Forwards SER Concluding That Licensee Individual Plant Exam of External Events Process Capable of Identifying Most Likely Severe Accidents & Severe Accident Vulnerabilities & IPEEE Met Intent of Supp 4 to GL 88-20 ML20196L0121999-07-0808 July 1999 Forwards Safety Evaluation Granting First 10-Year Interval Inservice Insp Requests for Relief B-6 (Rev 2),B-7 (Rev 2), B-12,B-13,B-14 & C-9,pursuant to Tile 10CFR50.55a(g)(6)(i) ML20196K6771999-07-0202 July 1999 Ack Receipt of & Encl Scenario for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721-22.Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20196J4881999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid as Version 2 ML20196J0401999-06-29029 June 1999 Forwards Safety Evaluation Re Plant,Units 1 & 2 Proposed Changes to Emergency Plan ML20196E6641999-06-22022 June 1999 Forwards Insp Repts 50-445/99-11 & 50-446/99-11 on 990418- 0529.No Violations Noted.Licensee Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance & Acceptable Radiological Control ML20207H3801999-06-0909 June 1999 Forwards Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Violations Identified & Being Treated as Noncited Violations ML20195G3771999-06-0909 June 1999 Ack Receipt of Ltr & Encl Objectives for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721.Based on Review,Nrc Determined That Exercise Objectives,Appropriate to Meet Plan Requirements ML20207G3291999-06-0707 June 1999 Ack Receipt of Which Transmitted Rev 27 to Comanche Peak Steam Electric Station EP Under Provisions of 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of EP No NRC Approval Required ML20207E9291999-06-0202 June 1999 Discusses 990526 Request That USNRC Exercise Discretion Not to Enforce Compliance with TS 4.8.2.1e Re Performance of Battery Performance Discharge Test,In Lieu of Battery Svc Test.Concludes Action Satisfactory & Discretion Exercised ML20207D7111999-05-28028 May 1999 Advises That Info Contained in Licensee 990514 Submittal Re License Amend Request 98-01-0 Will Be Withheld from Public Disclosure,Per 10CFR2.790. 10CFR2.790 ML20207D7011999-05-27027 May 1999 Advises That Info Contained in TU Electric 990514 Submittal (TXX-99115) Re License Amend Request 98-010 Will Be Withheld from Public Disclosure (Ref 10CFR2.790),per 990511 Application & Affidavit ML20207B7241999-05-25025 May 1999 Advises That Info Contained in Application & Affidavit 990507 (CAW-99-1333),submitting WCAP-15004,dtd Dec 1997,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20206Q0031999-05-14014 May 1999 Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 ML20206P5961999-05-12012 May 1999 Forwards Insp Repts 50-445/99-09 & 50-446/99-09 on 990419- 23.No Violations Noted.Nrc Determined That Releases of Radioactive Waste Effluents Controlled,Monitored & Quantified Well ML20206N7061999-05-12012 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206S5841999-05-11011 May 1999 Forwards Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint & Acceptable Radiological Controls ML20206K0311999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info,Without Encl ML20206H1701999-05-0606 May 1999 Forwards Copy of Exemption & Safety Evaluation Supporting Requirement in App K to 10CFR50.Proposal Will Use New Feedwater Flow Measurement Sys to Allow More Accurate Measurement to Thermal Power ML20206K3931999-05-0505 May 1999 Ltr Contract,Task Order 41, Comanche Peak Safety System Engineering Insp, Under Contract NRC-03-98-021 ML20206G1221999-05-0303 May 1999 Discusses 981215 Request That Document, Responses & Further Clarifications to NRC Questions from 980929 Meeting, Be Withheld from Public Disclosure.Determined Information to Be Proprietary & Will Be Withheld from Public Disclosure ML20206F5711999-04-30030 April 1999 Forwards Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Insp Re Focus on Radiation Protection Program Activities During Unit 2 Refueling Outage ML20206E5211999-04-27027 April 1999 Discusses GL 96-01 Issued on 960110 & TU Responses, ,970102 & 980502 for Cpses,Units 1 & 2.Determined That Submittals Provided Both Info Requested & Responses Required by GL 96-01 ML20206B3831999-04-23023 April 1999 Forwards FEMA Final Rept for 990311,Comanche Peak Steam Electric Station Medical Drill.No Deficiencies or Areas Requiring Corrective Actions Identified ML20206B5321999-04-22022 April 1999 Ack Receipt of Ltrs Dtd 970407,09 & 0204,which Transmitted Revs 6 & 7 to Safeguards Continency Plan,Rev 10 to Security Training & Qualification Plan & Rev 29 to Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20206A2301999-04-14014 April 1999 Refers to Public Meeting Conducted on 990329 in Glen Rose, Tx Re Results of Plant Performance Review Completed on 990211 & Transmitted to Licensee on 990319.List of Attendees Encl ML20205L8711999-04-0707 April 1999 Forwards Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Were Identified.Review of Operability Evaluation Re MOVs Disclosed That Licensee Failed to Include Info About Degraded ECCS Performance ML20205L1051999-04-0606 April 1999 Informs of Completion of Review of Tuec 980312 Submittal Re GL 97-05, SG Tube Insp Techniques. No Concerns Identified with SG Insp Techniques Employed at Cpses,Units 1 & 2,that Would Indicate Noncompliance with Current Licensing Basis ML20205F9141999-04-0101 April 1999 Informs That as of 990329 Dh Jaffe Has Been Assigned as Senior Project Manager for Plant IR 05000446/19920491999-03-24024 March 1999 Discusses Concern That Postulated Fire in CR Could Create Single Hot Short in Control Circuitry of MOVs Resulting in Spurious Operation.Required Hardware Mods Implemented to Control Circuits of Affected Mov,Per Insp Rept 50-446/92-49 ML20204F3311999-03-23023 March 1999 Forwards Discussion Items for 990323 Telcon 1999-09-07
[Table view] |
Text
h m ~ .. % _ . m = =.= .__ -
.. w m- mma-m::-x.--=.
%o C.;;l ya my.?5.,.
-am -
-qm 9.. .". 2. q,
. . -; y ,
Attachment J .
1 I
DCT ; "to t $ ,
'rr. J...it.- [Ilif., i r. ! i; : it ,g
\
)
Clji . :.. ('.i'.iz m r.j) u;s l : e:ic-i;.n i or \ g @@ ~ l
. M l
. .. . I l i . .,, , I L ,. . . ,
4 .,
7 - ,,.,. :
i in ti. .tti:r of To.ir. Ltil .n r. i : t rc tii.: Cc , c: al.
(Co..nche ren. '.tc.c. .lu '. r i c : ti t i u:, l'.ii ts 1 . ...l )
.....t,. . ,
. . . .L . -
l ficar i:rs. Ellis: ' . J1 Jg]a.4 '
l
. 1 l I l In tecer.:ar.ce with our r:' cent t?lt....' r c c:nversction, 1 N c: prertrad und i cncloses a crcit stil.ultticn coverim th. cont:ntiens ci C .E. Inis craft l sti ulction r<fitets t'.e psitier. of t~.c ;.rties uit: res;zct tc th?se con- l t:ntions, cs set fort!. it. tFe s t. t c : r t cf contentions ;,rt.eiously trcnstritted '
tc yea u.c' Ap: licant's cm.sc1, .:.: i:. ': : p:. rti es ' ti: :v:.: : csfer:nce of .
ip pst 31, 1 Hi..
~3 '.c 1 u.-1:ine.' in tur t<_1t a:mr.; ccm r;;.ti r. of h* t:
- r
, F 77, sat sc- l
( ) .. .c..t .t the ccaf .r;:.t. c:.11, U.. . ;_ f f r _ st :-LL _:. its , ::n 4:. .t
. i t. - l
's ec:.',eli2 ted cententien 1;, rcluir.- t. a r3r.cy pli r. .i' . i:;. r.- uff's I r...:ss_s:.: .:nt is bast:' en rccent c'cyc1:q.. 2: ts, more fully i:.a.ssel t elo,.. I vi.ich b;.ve c ccurred in tr.c aru. cf c :.r: cr.::y r.lcnnin:.. Ti:2 ca.alctive ir;rct of these oevc1c.prents ceutes t!.c Staff to belicvc t'.: t the r.: rties snould t fer further carsiderctic.; of constelidated cenicntic l. T h refore.
l l the Sti.ff has includui in the stir.u1Ltion o separate r.:;r6;.rt rh coverin;. con-l.
I:.ntion 12, uhich rcficcts this patiticri. P.csed on cur convers.ction of Mrt:".Scr 10. I understtnd that you kgree to deferral of conte:itior; 12. &
T :. uvtic,r o ts r.cictrv to c.cv. nra: 1) the Consissicr istced a ";'c tice ri i ro. :s a : '3 m it2'. lric . !.ir; cu t'._ i .:.quecy cnt' Iccc::t. net of D'Orponey
/ i t .. .ir, !.rcm. . cl.:.r Ti.cilities" ( : ticc ), 4 Fed. ~; . <1' T' (.1uly 17, l'.7. ); ')d tha Jcint s .;i.C Tcch Ftrco Ili'.ninc Ocsis f er i vt 1:" cr.t cf l
.is 1: ;:.. Lo:(1 '. eve rr :cnt T eir,1r ic'l _ c r: cr.cv kos .w . i b r.s i . ' t :.rt l L4 L 1 . .: cu r acler r Pe . r i lents b.b.L-tGD6) (Joint 1cs.. f t rcr) is DEnc- i iw rtn.re tnc Lc :;ission for its p;rw;1; and on July ::.,1: 73, :r. D:r. tor, l
'irector cf ::acitar T;0.cter i% eleticr., crc.7alr ated SECY-7:s l.:", "T.tticn Pitn l
fer T'rc..itly intrwir.p E.criency T rM '.rce. css," (i.ctica Fli n). The ! ctice l ci f rarcsec !.uleac hin .'.y n:.t r.irectly e ffect tF.it prec ::in;. i.act.use c r..jer ":.rtica of it r.:lt tes to c; r;ti:.- re:.ctc.rs. i:o":.v. r, ti.; Joint 7t tL Terce re;0rt is i.'r::rttr.t ts tris ,.r..:c: ing kc:.rse it n.r. s :t.jt r cortica
- c;f tr., b sis fc.r exterdin.. c cr s. ;.cy :.lt :ir.: to r.t ic:t i n .11rs. In t-' a
. .. : i= rm. .e- ir -,
& ~ . w-+-.i .=l ,
u .d. . r.. .....p.c.....
. c.t..r ..l id.c-.
. ..n.
.s. ..i.. .o..r, enr, .,.J...
c--c:
... 1.1.. A . :=--l
. _t...i..n.
y
- ' -* ' fp:1;My
~% .,, .W .M M...;. ~O ~.. p.
gg.,;;,s 8008100 3O
w nm...,.-,... .-
- a. .
,aw
. x. .,
3::x::x n w ,,.n.L,,..,mn ..
,:&.; _2 x %g 4
't;'9
~w.n . 1 g, y:, , mriqW.r7g+'b;≫;.;na n c ,. ;a. gf/ r '.. .,qngg;
+w ww h
.. . .i p '
.1111 - -
( T.) Ast:.ss tN r:.it.tiu. .i:i ' c4 51;'. . /1< :. .1 r1<.ns to the lic r.- l cc 's 1.nd Tc: crtl pli.ns sc, t.s t- r c:cra ti.e cr i t.H11ty to (
. t t. f.: i.r;'re. ria te r: r.'ct cy t e t : : <.. /.t.r u re ti ::t tH s c: rs- ,
i !:ility t.ill !c a:tu.ic: tt i- di:1 r.cc cf 10 niles as scDn l cs rr; ctic:1, i ct nct let< r ta:- i iq.cc ry 1, lr) , ' .
i c .u n.: yu: in c:a c rii m.~ir.- t ~ r ::.:: ^'crirp.:ent: in c :.r u.cy ' 1:.r.niq, ,
ie c :1csin. cc:ies v." 1:. c. c- ..t1 rc -irr . to t 'ovt.
I r. .'li. cr,.reciate it if y2 n.. id r. vie t. i t cri.f t t ti; al: tira 0: in exte- 1
- ci tet ksis, since I brill b cr.:.it ctin,1.-m : rd I.;411 cent's cu n c1 thcrtly in c r ':. r to <'i r c ut s t u s.r t' rc c r t a C '.: tim t t o t hr: li .
in ibe s ti; .;1 t.ti en. Tnt troit s ti; . L tiva im . .: u. .:.t of cent.ntit..: ull then k ':rci:. red in fini:1 fcr.' cnt' trcr s:.itter to .e::u fcr your sigr..mre, oncer.
t scpi.rste cover. As prepcred in final ferr, the docur= hts vill ruficct cor-7 gd~
recticns cr chances c3 rect' to 1.y the rd.rties. After sientturc, the stipule;M' tien ud statenant of cententions .iill f.: tren:nitt t to the Licu Line I:c:;rd for its consic:eri. tion.
Linccr:iy, 70n- -
. r l . i .: . . ni c r.e.c L ..
.. . .a. . .. s. , r . , .e., o t t. . T
(
%.A
- ncl.,a rts:
- 1. Ft: :ral "c :ister Pcticc d ttd u.
..'.,...,G..ily
...i- s 17, if/P
. 2CY-D-450 t, . rrt f t Stipult tion
. 2 1..
cc i /;atlesures: T.ichtrd Toub o itic'.c r; . . Lo..i.rre. , E.s : . 4
- ./;nclosure H : C.:.cif r g" " by c/~.. :lesurcs G , 2, 3: Liccr. Ling ! oitr:: r ; .',a rs A@s o\\\a .
QF ${Ng cc 0/0 inclosurcs: I.ch t 'i k rViCc. Lis t 9)(\p VM '
m e
- I
. . . . , - . - -._ _ . , .. ._.i.,_
~. . .. .
I
-w . , , d. ,. , . .
.s.' <w r
. , .d. 7.,;w .> _ , . , ,; . . , . . . . . . .
a . . . .. .
":m;uffr;*'"
" ' ' ~ -~*" "# * * - * * ' * '
Y -' , [*f ) ; ss . e< sa rp$ f 'd' to *- * **6*
. . ~ .. - . . ,,
' ' " ' " *"-W 9
.h.9N4 N_ gM p. .M.
' ~ ' t; -
3 3a a ~; y ~ ~-
g p. n - j_y 3x 9 .w < > sm 9 .- ty y v.xx.y ,m QQQ k 4 ..g ;u e y.. g wf' Attachment K P^d **
3 I
,5 M 41979
( E NO Eichard L. Fouke .
Citizens for Fair Utility lji '
3r r '
s Peoulation(CFIM) 1r/.r " Certer Prive
~
F
~' *l g* ' ' .E,(I Arlinf.on, TX 76010 ~
In the ' fatter cf Texas litilities Generating Conpany, ~et d,, .
(remnche Deal: fteen riectric Stetion, Hnfts 1 and T) .
Docket Nos. 50-445 and 50-446 .
[QMW p
Dear Mr. Fouke:
. . , .. .&; .,; . 7.*%b$ K eI f, i . - -ry -
m
. .s w I am vriting in response to your lettef dated August.25,1979, and received 4 at IPC on Septenher 7,1979, which requests information pursuant to our w conversation of July 17, 1979. The conversation you refer to took place at -
the neetino held by the parties on July 17, 1979, to discuss the contentions
. proposed by CFUP in this oroceeding. In connection with our discussion of
' . th es t' cententions, the Staff offered to consider, on an infomal basis, rtruests by CFT for NGC documents related to the specific issues raised by CFT in this proceeding. /. nrcli*inary review of your request of July 17, 1076, indicates that your recuest is beyond the scope of our offer. You 4' reouest not only dncunents, but infomation from a number of different .
sources, one of which (the President.'s Corrnission investigating the acct-dont at Three '!ile Island, Unit 2) is outside NRC. In addition, some of p? ~ this information does not appear to relate to the specific issues raised by-c 2.,
the contentions of CFUR. It will take us considerable time to fully evaluate
. your request. However, based on our preliminary review of your request.'we,g,, .
- k. have detemined that we can furnish you with certain documents covered by
~
R~' your request, as discussed below, under the' headings contained in your.
letter. .f .i im I. ""RC Staff In vouse Projects." '
. v ad.K.
.: ;* Ns.L
- w <
E ' ~
You state that CF"' has detemined that the NRC Staff initiated a number of $
proincts related to the Three !!ile Island accident and request all interim -
4 and final reports for thirty-two projects enumerated under this category. U
. qr. '
' b 'if any, issued with respect to there projects.He are currently reviewing' cur A preliminary review hasi 3 identified certain renorts on the NRC Staff In-House projects which you gN p
7,..
list under subcategories in Category I. -
.I Q ,
'n
- Mith respect to subcategorv A. " Inspection and Enforcemnt," you p@;* ft.:Oue5 L LDl ' repOT'E OT A t. AffVessi s10n.- A ndi e OD Ld l DtN en J .3 N.'
,_ = = * .
.....cnclosed.gcopy..of..tha 1 (tMtEr , M )..entit1.ed; ".I.nY.9.Suti.RhiM. . . .
wtc . -
f . ., gi w. ~ ,
_ .. . . h; wsn e yr y.m,yy p
_d =- . .. s
. m. , - .. ~ ,, w,wm -
x . . . .
w . uw -. ;c m.......
gp
,, e '@ ^
Kn . : <
.. .., ,.,,g. g , ,.
w h56 ~
&^ ^ '
- ~ k *~ }
'icStrd L. Feute - -
,.m ,f R '
- - ~
.a x o .
/ )
Nj Into the 'iarch 28,197n, Three "ile Island t.ccident," v51ch was issued by the imC Office of Inspection cn't Enforcem nt in August 1976 L'nder Category E. " Standards revele",cnt," you refer tn P report of the Depcrtnent of FCElth, Bect tien and 'lelforo (FO') on porula-tion and nexiru, individual dosc csrers ent. I prce.'re tht t you ,
are referring to fen 95M, "rt tulation "osa tnd 4;;I:5 Irwet of l the Accident at Three "ile Isicn *:vcicar Station, it s m' in 'iay l 1979. . This report, which I c, cc.closinn, contains "r.li .inary '
estinates prepared by the /,d l'oc Interar.:ncy "ose f.s .t;;,ent rroup, l censisting cf ' ",C, th:. Envirer v.t.:.1 "r:d c< ' i:.
. iT!. l gb ..
Jn -the the category activity entitled " Executive as "Detemination Legal Director,"
of Extraordinary you refer,to. h.s?9
fluclear Occurrences.
l i
As you indicate, the Comission has this determinetion under l
m.
review. In Federal Recister notices published on July 2? (V Fed.
~M Rea. 4312P), and September 7,1079 (U Fed _ Oen. E2??l), copies of which are enclosed, the Comission stated that pursuant to the Atonic Energy Act of 19M, as cm^nic', the Co-issir is initi- l ating a detcrrination as to uh:ther th; pccident at Trrte 'il e l 9
Island (T"I) constitutes an extranrfinere nuclear occurrence. The notice of Septen%r 7 provides that sur .ittnis of n:.'lic cc Tr.ts, alone with other informttion tsu -1: ' l." thc CF ini-n frc- its I own and other sources, will be consi 'ered 9 a panci cc rised of
, principal Comission staff. ,.cccrc'ine tS this noticc, the panel 6, intends to complete its vorl crd re" ort to the Conissico es soon w as possible after the panel has b .d En oncortunity to revicu eny b information relevant to its revieu presented in the rc ort of the c .. Presidential Connission investicating the T"I-2 accident. At the f' time the pcnel reports to the Comission, it intends to publish *' -
b Th.n.m.
w..... its report in the Federal Recister for public coe cnts.
r r$-.' -~ ' '
knowledge, this report has not yet been published, but when To ny pub-W; . W-
~ ~ ~ ' ~
C
^
lished, I will provide you uith c cc-9 A .. .
^
&"WU: . II. "ACP.S Activities" g ~.
$bre You renuest copies of the transcripts ci rortions of nu creus 1979 neetinns
'" of the Advisory .Co rnittee Dn P.cactor S3ir.nnrds (fr"S). St:ff counsel does 7
not have copies of thc transcrints of these meetinns. Conies ~.cy be obtainci, at a cost of p/ pace froa the WC's Pu'. lic "ocu snt 'com (rM) in %hington, f%r g6 -
You should direct your reonest to:
n .
Qp i Lynn Scattolini b&
MT-x
& Public Document P.ce, f'uclear P,coulatory Co-nission tMg j
.p-
. . . u. "ew.'s.
. _ .L .
n r 12 ' l
--r
- -A
- * - ~~
! .J. ~ . .
, ;
- N..,. .
.- lc ~
- 1. -
r- W W t"d* g j h g p_ n,y g . y w h. g g gfg,,, ;,_ , _,g , .y, q@g
^ ~'^
.a ..n
~ # Qfk,f @a -Qg
,~
t w
n,,
. :.7 7 . g ; ,- n. ,_., . .na., . . . .
,,,., .. ~,*g.,ggh.:yg;rs.,;n.
yy
, . <.,ay.,.-.- ~ g , ,
.n. : c: wn .
s v n ;m... m.s , wy gyng r "i c'" i ' ! . rm>! e - -
NIO
/, '
rD-) %r r Il!Lb t b
!,a)t f U g 4.J J% .LJ.- a III. ""I " Lessons Learned TesF rnrce" i
Yev rancst infor ation relatinc to the items considerei ky tha T"!-?
, Lrtsons Let rner' Task Force, such es vote counts on ell ita"r. consid: red by tM Tet' rerce an? infor ation describina the title, descrirtion end <Mscus-si", v tv itons considered bv the as't icrre t# ici did not raceive t. ti.'n-thir" r .-iority vote of the Tas i Force. I r. corrertl" tr.'ing to dcterr'in?
- "ib e roc 5 infor .r. tion crists, En' if so, d . t' er it crn he feraished to .
" 09. ! '. .z v E obtaine? e copy nf M" E"-97^ "T"I-? Lc".ser.s Lct:rnc? Tash
, Ferce "trtes report and Short-Tern Pece mnd?tinns," issue? in July 1970, j
- "ic- is tr.c1csed.
l Y. " *r Enocial Innuirv" i 1
' I am not aware of any reports, interim or final, which have been issuMT"% l
, the "'C Enrcial Inquiry. Uhen such reports are available, I eill provide "M I t' r to "00.
I It is nn+ certain that I can provide you with all cf the infor.ation rennested l ur 't r t r - re,ainder of the snurces listed in your r^runst (VI. "L.wis Co-" ittee,"
i i e. Ric' "nu recuest the wrFinc pacers of the Cr-ittee; uy], n ciei.cn l
'"lic :.icu" ir !!bic5 yc" rencest a copy of the " interim secntrit" Rich h .c " Science 'mtlicatiens, Inc. prenarec unSr subcentract te " ndia
[] 'Lv m -- rias, an P"I contractnr, and VIII. "" "" re ertt"). 1 -svr r'itained
\ / a con" c.' """F0 0550, "fenticiocted Transients iC "::t Scra . for Liri t "cte.r tr:ctor ," 2*iich you asF fnv i t. P6tencry IY. IS cv0 cortacted the "PC f ffice of Ins 9ection ' Enforcement (I'E) re ar'ir- "our renuest in Catennrv X.
thet I!E include CFlO on the distribution list 'nr ell en unications 'etveen If.E an ' the Anplicant, Texas Utilities n et al. % c 'c-ion IV
. office of ISE advised me that it is nnt I?F encratin- noliceB.to, iEclii7e intervenors on i such distribution lists. Accordino to Recion IV, the Comanche Poal: Local Public "ocunent Roo- (LPM) in Glen Rose contains copics of I'.E documehtMW
- relatinr to Conanche Peak, such as .infomation notices, bulletins. investlE.$
ettier recris, insocction reports, and other correspondence betwaen IEE e65 "-
the t711c nt relating to enforcement. T%us, it annears that copies of the tynes of Scenents covered by your request ir Cetenorv X. are available to ! 4 -
you at the L*.. If srecific docuvnts dich vna uculd life to c tsin are 5 r.ct avci1P lc in the LPDF, plcase contact ne so I can atte ?t to oktain them for vnu. _
I uill centr.ct you aaain unon comnletion of our cvaluation of "our request for inforrrtion. At that tino, I will advise you whether an" of the g s/f
. 'h
..._;., --- .a-- -
1
~-.t ,
f.4.
f .* s Vy ,"
uA:.a ,
~.&.m.. w, . .
,.m ,,ns_,d. . . , , . , . y &W'%., .
.n w.,,- n n -e. n . m .u p- , , , ,e tg .s.
w e h
- p .,
ege
- .,n ve w ,.., ;w ,.=.gM,4A a
g
?.a Y t-~
$ '? 'hife&Q ;. ?
~~ - " ~ ~ ~
~ ~~~
-: e .sc, t
b
. -... ezte : .wM ,, __ _. . e,..ner=*r 2.me: r4,sv..s.s' ..1 9' "s' O ,e.r.
v4m
, m.s.,. 1, ~ - - -
u m.< rgs:,,e i- se- a* n
- % % ;:' : d E_.o JMIEVA,m@-shG 9*2- L d cw. M. o . .ww w. M. $
.a . mm-rie n, L, c,'- . r .
1 4 l
' infor ? tion trecified in your renuest which is net nrerently ava1191e r.ny Le provided in vou.
I Si nce. rely, i
"a rjorie P. '!1 me n .
Counsel for t'*C Ttaff D.cl w. rc s :
i 1. "'J r Ec-O f.00 e .e 1' ster Notices ' ~' * "'E '
'* '*Id.
~
! c.tu' Julv 23 and
%,t<c " cr 7,1979 r, w' e r..t q 75
- .i , r,. t a , r* t .a r)
- r. e l
l cc '../n enr19 turns: Fervice Lirt e., w! nMM,
- n. ,,
l
,.,p n\ , ,./e \ \
i ' '3 \..\\ \1u
. . , t 1 s-
<.(' 1\ .'i ( -
',i
\.
l * '
' * ' " * ~'
.. .4.pS**.IU
- x. MT* *
,0 '
_ . . . ~..&-
..a .. . .m. .o
.,3 .
.p
.. .~...,.;..',., ,
- t , 'l . . % ~ ,- }.- sgW y .e
,y .
3 . , . .. *n.%
,g.
4 I
h
< t
( *+ 9 .p.
$
(.', e p 5 +% s eng
--).
r.
.ets . &
s , e ..ges. .n 4
. . . " . ~ . . . . . , 1. - -...
.; w w . g s.... e , % g g r ag: g",g s ,.
g.
+w a
' +
.. -. , y,p wv..x
,w wp.y yy~ ._
pl.
+
-l
- p. .
-n,..-...-...-. . - . . . , - . . - . ~ . - . . -- - - . - - . . - . -
a Attachment L January 25, 1980 Mr. Richard Fouke Citiaens for Fair Utility Regulation (CFUR) 1668-B Carter Drive Of-O ' h;1 ;
Arlington, TX 76010 '4 'A In the Matter of Texas Utilities Generating Company, et al.
(Comammeha peak Steam Electric Station Units 1 and 2)
Dock &t Nos. 50-445 and 50-446
Dear Mr. Fouka:
Enclosed is the stipulation covering the contentions proposed by CFUR for admission as issues in controversy in this proceeding. The stipulation has been rigned by counsel for the Applicants and Staff and includes as an attach-ment 4 statement of CFUR's proposed contentions.
( The stipulation and attactament differ in some respects from the draft statement of contentions and draft stipulation forwarded to you in August and October 1979, respectively. The draft statement of con %entions and draft stipulation reflected the positions taken by the parties at the July meeting of the parties and in the parties' telephone conferences of August 31, 1979. As you recognise, these positions were not final. As a result of further negotiations between the parties subsequeet to the meeting of the partiet % July 1979 and telephone conference of August 31, 1979, there has been a chan, 3f position with respect to several contentions. In partie=1mr, we note that at ths.
partiesdeferredconsiderationofcontentions3.5.and3.3.yulymeeting,the Bowever, the parties have now agreed that deferr&1 is no looser necessary and have taken positions with respect to these sententions. Also acts a change in position regarding costantions 4.A. and 4.3. The stipnistion and attachment also now reflect the position of the parties with respect to the coatsetion proposed by CFUR fa its " Motion To Add Contention," dated October 31, 1979. This contention is designated as aumber 8. In addition, although the Applicants and Staff orally agreed to eone language changes in contention 3. A. which were suggested by CFUR in a telephone conversation, the Applicants and Staff have stipulated only to the language agreed to by the parties in our July meeting. Based so our records, these are the only shanges of substance in the stipulation and statement of contentions.
= p(
- f As the stipulation and statense! of contentions indicate, the conten-tions have been reoimbered. We are referring to the contentions as
.Keeunbered. ] l l l l b tA M goo 20 I O M
9 2 --
0 I would appreciate it if you would review the stipulation and attachment on an expedited basis. Please return the stipulation to me after signature, with the attachment, so both can be submitted to the Licensing Board for its consideration. An extra copy of each is soclosed for your retention. Thank you for your cooperation.
Sinceraly, Marjorie Ulman Rothschild ,
Counsel for NRC Staff
Enclosure:
As stated ec w/o emel: Service List L
0
+
4 i
Attachment M
/
l
(. i l
January 25, 1980 s '
Mrs. Juanita Ellis, President . l CASE (Citisans Association for Sound Energy) g"
/I - h jj 1426 S. Polk Dallas, 21 75224 f' :
l i tj In the Matter of Texas Utilities Generating Company, et al.
(r===*ha Peak Stean Elaetric Station, thiits 1 and 2) '
Docket Mos. W 445 and W 446 -
i
Dear Mrs. Ellis:
I l
Enclosed is the stipulation covering the contentions proposed by CASE for l admission as issues in controversy in this proceeding. The stipulation has been signed by counsel for the Applicants and Staff and includes as an attach-ment a statement of CASE's proposed contentions.
( The stipulation and attachment differ in some respects from the draft statement of contentions and draft stipulation forwarded to you in August and October 1979, respectively. The draft statement of contentions and draft stipuistion reflected the positions taken by the parties at the July meeting of the parties
(
l and in the parties' telephone confereness of Angust 31, 1979. As you recognite. l these positions were not-final. As a result of further negotiations between j the parties subsequent to the meeting of the parties in July 1979 and telephone conference of August 31, 1979, and consideration of the connants made la your letter of October 30, 1979, there has been a change of position with respect to I several contentions. In particular, we note that the draft stipulation indi- i ties had agreed to defer consideration of consolidated j ested that 12.
eentention thepBowever, the parties have now agreed that deferral is no j longer necessary and have taken a position with respect to this contention.
Also note changes in position regarding contentions 1., 4., and 5. The stipulation and attachment also now reflect the request of the Applicants and Staff that the Licensing Board defer ruling on the admissibility of contention 7. !
Based on our records, these are the only changes of substance in the stipulation j and statement of contentions. 1 d
- f. As the stipulation and statement of contentions fadicate, the contentions
, l have been renumbered. We are referrina to the contentions as renumbered. j b$
goo 2 O I 6 i O se:c roa
- J
% v 2 --
I would appreciate it if you would review the stipulation and attachment on an expedited basis. Flosse return the stipulation to me after signature, with the attachment, so both can be sv.bmitted to'the Licensing Board for its consideration. An aztra copy of each ta enclosed for your retention. Thank you for your cooperation. .
Sincerely ,
Marjorie Ulman Rothschild Counsel for NRC Staff
Enclosure:
As stated ec w/o es, cit Service List
., . , ]\
i i
I i
L
1 A'17ACHMENT N
(
February 25, 1980 .
(l t 1 Elk.1:th S. Eowcrs, Esq. , Chairran Rfchard Cole, Esq., Mcaber Ate ic h fety cnd Licensing Loard Atonic Safety cnd Licensing Board U.S. Tuclear Regulatory Co= mission U.S. Nuclear Regulatory Co==ission t?arhh: ton, DC 20555 Washington, DC 20555 Dr. Torrest J. Renick, IIember 1 Atonic Scfety cad Licensi.ng Board -
305 E. Emmilton Avenue D)
I State College, PA 16801 [ [)
(
ll In the Matter of Tc::as Utilities Gencrating Company, et al.
(Con:nche Tcak Steam E1cetric Station, Units 1 and 2)
Docket Nos. 50-445 and 50-446 Dccr it.kbers of the Board:
On Jcnuary 25, 1980, the NRC Staff filed a " Status Report on Proposed Stipula-tions and Request to Schedule Prehearing Conference." This report responded to the request of the Atomic Safety and Licensing Board (the Licensing Board) for cn cppraical of the status of negotiations among the parties to this pro-ceeding concerning the contentions of the respective Intervenors. The report reficcted the Staff's. belief, on that date, that the stipulations on contentions l which by the had been executed by the Applicants and the Staff would shortly be executed Intervenors.
Accordingly, the Staff 1) suggested that the Licensing Board schedule a prehearing conference on March 20, 1980, to hear oral argument .
on cententions and 2) proposed that the parties file statements of position on contentions on February 29, 1980.
Since the filing of the Staff's status report, the stipulations have not been executed by the Intervenors. The staff continues to be hopeful that it will ;
be possible to reach a stipulation on contentions. However, since the parties have not yet reached such a stipulation, the Staff believes that it would be prcrature to file statements of position on contentions on February 29, 1980, espccielly since the -Licensing Board is not considering having a prehearing confercnce until April 30, 1980. The Staff therefore does not intend to file a state:,ent of position on contentions on February 29, 1980. In the event that the parties reach a stipulation on contentions, it is the Staff's inten- ,
tion that the stipulation provide that the parties will file statetents of position on contentions no later than twenty (20) days prior to the holding k
b@
gooz Wo2
3;
_2 of the prehearing conference. If it is not possible to reach a stipulation, the Staff will file a statement of pocition on the contentions originally propor,cd or as amended by the Intervenors no later than twenty (20) days pri,or to the prehearing conference.
Sincerely,
)
I
!!arjoric Ulaan Rothschild
. Counsel for NRC Staff cc:..Scrvice List f
4 ll l
a
4 i
Attachment 0 j
V.
January 29, 1980 Mr. Richard Touke Citizens for Fair Utility Regulation (CFUR) /
/
1668-B Carter Drive Arlington, TX 76010 .
/
In the Matter of Texas Utilities Generating Company, et al. '
(Comanche Peak Steam Electric Station, Units 1 and 2) -
Docket Nost 50-445 and 50-446
Dear Mr. Touke:
In your request for information and documents dated August 25, 1979 you 3 requested several reports which, as our response stated, had not yet been issued. In particular, you requested reports related to the NRC staff s determination on whether the March 28, 1979, accident at Three Mile Island .-
( (TMI)-2 constitutes an " extraordinary nuclear occurrence" (ENO), as defined by the Corrission's regulations,10 CFR Part 140, BS 140.84 and 140.85. You also requested reports of the NRC Special Inquiry Croup investigating the TMI-2 accident. These reports have recently been issued. A Federal Register notice of January 4, 1980, (45 Fed. R_ej. 1180) announced that the panel making
- 1. ;~-
),; ' _
i the determination on whether TMI-2 constitutes an "EN0" has completed its investigation, evaluation and anlaysis. The findings of the panel are con-tained in NUREG-0637, " Report to the Nuclear Regulatory Commission from the Staff Panel on the Commission's Determination of an Extraordinary Nuclear Occurrence (ENO)." Copies of the Federal Register notice and NUREG-0637 are /
enclosed. On January 24, 1980, the NRC Special Inquiry Croup issued "A Report :
To The Corrnissioners and To The Public." We understand that this report will I be made available to you and all parties in NRC adjudicatory proceedings as .
part of a " Board Notification." If this is not the case, we will provide you with a copy of the report. .
4 Sincerely, Marjorie Ulman Rothschild Counsel for hTC Staff
Enclosure:
As stated I
cc w/o enc 1: Service List '
. v_$ 8 1)uhk Y' go o a &O Il 6 3
.sc , '
Attachment P
+
Dot. hut Nus. 50-445 february 14,1979 50-446
?'rs. Juanita Ellis President CASE m^-
P. O. Box 4123 Dallas, Te::as 75208 h L LJ
[V
Dear ! irs. Ellis:
In cccordance with our phone conversation of February 8,1978, enclosed ic a copy of:
- 1. the Lewis Conunittee Report (NUREG/CR-0400);
L$
I f,
- 2. the Cc:amission's policy statement regarding the Lewis
'.' Committee's review of the Reactor Safety Study (h'A Sil-1400);
i
',[ 3. the Staff's letter to Mr. R. J. Gary of Texas Utilities Generating Company and attached notice of cpportunity t
' for hearing, dated January 26,1979, (published in the Federal Register on February 5,1979); a copy of which was sent to you that date; f; 4.
! the NRC Staff's Final Environmental Statement related to the construction of Comanche Pcak, Units 1 and 2 issued in June 1974; and, j, 5. the NRC Staff's Safety Evaluation Report for Cecanche 3f
'j. Peak Units 1 and 2 issued in September 1974, and r Supplement No.1 thereto, issued in November 1974.
I If I can be of any further assistance, please let me know.
Sincerely, Lawrence J. Chandler Counsel for NRC Staff e
h
)
. 14C ]{$0 lE b
-_--_a
Attachment Q
(
February 27, 1979 Docket Nos. 50-445 50-446 Mrs. Juanita Ellis f ?, " N -
E 1426 South Polk Street "~
Dallas, Texas 75224
Dear Mrs. Ellis:
ti
- .' t .
In accordance with our phone conversation of today, enclosed is a copy of:
5 3 1. the Lewis Coramittee Report (NUREG/CR-0400);
- 2. the Commission's policy statement regarding the Lewis Committee's review of the Reactor Safety Study (WASH-1400);
i .
- 3. the Staff's letter to Mr. R. J. Gary of Texas Utilities l Generating Company and attached notice of opportunity
, a for hearing, dated January 26, 1979, (published in the i i Federal Renister on February 5, 1979); a copy of which t was sent to you that dat.o;
- 4. the NRC Staff's Final Environmental Statement related r i, to the construction of Comanche Peak, Units 1 and 2
.f issued in June 1974; and,
.s L di 5. the NRC Staff's Safety Evaluation Report for Comanche
- f Peak Units 1 and 2 issued in September 1974, and Supplement No. 1 thereto, issued in November 1974.
Q The above documents were originally sent to you under cover of a letter
[% <
dated February 14, 1979, from Lawrence J. Chandler, of this office.
Apparently, you did not receive all of the documents included in that maillag. Also enclosed are copies of two other documents you requested
.. (Staff's letters to Mr. R. J. Gary of Texas Uti3ities Generating Company 0[ dated November 2 and 22, 1978). All of this material was sent via Federal Express, in order to insure timely delivery.
If I can be of any further assistance, please let me know.
Sincerely,
.s Marjorie B. Ulman Counsel for NRC Staff B
k quwoM
! l Attachment R I l
l
?
,1 rch 21,19 '9 Docket Nos. 50-445 j 50-446 i '
Mrs. Juanita Ellis President, CASE 1426 South Folk Street h D ar r Ellis L In accordance with our phone conversation of March 19, 1979, enclosed .
is a copy of the Atomic Safety and Licensing Appeal Board's decision in W"I Union Electric Compayn (Callaway Plant, Units I and 2), ALAB-527, (February 23, 1979). This decision discusses a number of matters arising from the dismissal of a construction worker for advising the Commission of construction problems.
4 Sincerely, Lawrence J. Chandler Counsel for NRC Staff
Enclosure:
As stated I
l 0 .
f) U.4 qq0y.QCO V ]l ~