Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126C022 + (01:08:50, 13 December 2024)
- PNO-III-80-040, station Will Start Limited Const of safety- Related Activities During Wk of 800303-08.Staff Will Slowly Be Increased to High of 700 in June + (01:08:51, 13 December 2024)
- ML20126C020 + (01:08:52, 13 December 2024)
- ML20126C019 + (01:08:53, 13 December 2024)
- ML20126C018 + (01:08:54, 13 December 2024)
- PNO-II-80-037, investigation of 800226 Transient Revealed Power Failure Caused by Mismated Set of Connector Pins on Printed Circuit Board Between Electrical Cabinet & Solid State Subsys in Control & Indicator Circuits + (01:08:55, 13 December 2024)
- AECM-85-0178, Forwards Final Response to Generic Ltr 83-28,Item 4.5.2 Re Reactor Trip Sys Reliability (Sys Functional Testing),Per 850315 Request for Addl Info.All Sys Required by Tech Specs to Perform Reactor Trip Tested + (01:08:56, 13 December 2024)
- ML20126C013 + (01:08:57, 13 December 2024)
- ML20126C014 + (01:08:57, 13 December 2024)
- ML20126C010 + (01:08:58, 13 December 2024)
- PNO-IV-80-010, on 800304,hydraulic Oil Fire Occurred in Turbine Bay.Caused by Hydraulic Oil Leakage from Valve Flange on to Hot Steam Traps.Fire Extinguished Immediately by Security Guard.Platteville Fire Dept Notified + (01:09:00, 13 December 2024)
- ML20126C006 + (01:09:01, 13 December 2024)
- ML20126C005 + (01:09:02, 13 December 2024)
- ML20126C000 + (01:09:03, 13 December 2024)
- ML20126B999 + (01:09:03, 13 December 2024)
- ML20126B997 + (01:09:06, 13 December 2024)
- ML20126B996 + (01:09:07, 13 December 2024)
- ML20126B994 + (01:09:08, 13 December 2024)
- ML20126B993 + (01:09:08, 13 December 2024)
- JAFP-92-0855, Responds to NRC Re Violations Noted in Insp Rept 50-333/92-82.Corrective Actions:Installed Scaffolding Inspected,Discrepancies Identified & Training Provided to Individuals Responsible for Evaluating Scaffolding + (01:09:09, 13 December 2024)
- IR 05000482/1984046 + (01:09:10, 13 December 2024)
- ML20126B990 + (01:09:10, 13 December 2024)
- ML20126B987 + (01:09:11, 13 December 2024)
- ML20126B985 + (01:09:12, 13 December 2024)
- ML20126B979 + (01:09:13, 13 December 2024)
- ML20126B978 + (01:09:14, 13 December 2024)
- ML20126B977 + (01:09:15, 13 December 2024)
- ML20126B976 + (01:09:16, 13 December 2024)
- ML20126B975 + (01:09:17, 13 December 2024)
- ML20126B969 + (01:09:57, 13 December 2024)
- ML20126B966 + (01:09:58, 13 December 2024)
- ML20126B962 + (01:09:59, 13 December 2024)
- ML20126B964 + (01:09:59, 13 December 2024)
- ML20126B959 + (01:10:00, 13 December 2024)
- ML20126B958 + (01:10:01, 13 December 2024)
- ML20126B956 + (01:10:02, 13 December 2024)
- ML20126B955 + (01:10:02, 13 December 2024)
- ML20126B954 + (01:10:03, 13 December 2024)
- ML20126B953 + (01:10:04, 13 December 2024)
- ML20126B952 + (01:10:04, 13 December 2024)
- ML20126B951 + (01:10:05, 13 December 2024)
- ML20126B949 + (01:10:06, 13 December 2024)
- ML20126B950 + (01:10:06, 13 December 2024)
- ML20126B948 + (01:10:07, 13 December 2024)
- ML20126B947 + (01:10:08, 13 December 2024)
- ML20126B944 + (01:10:09, 13 December 2024)
- ML20126B938 + (01:10:10, 13 December 2024)
- ML20126B940 + (01:10:10, 13 December 2024)
- ML20126B934 + (01:10:11, 13 December 2024)
- 05000321/LER-1980-022-03, /03L-0:on 800222,w/reactor in Cold Shutdown,Lack of Electronic Annunciation Discovered on 122-ft Elevation West Cable Way Door C19.Caused by 800123 Security Re Audit Securing Door.Door C19 Was Annunciated on 800131 + (01:10:14, 13 December 2024)
- ML20126B930 + (01:10:15, 13 December 2024)