Advises That Svc Water Sys Operational Performance Insps Will Be Performed at Most Power Reactor Facilities.Insps Will Evaluate Capability of Svc Water Sys to Fulfill Thermal & Hydraulic Performance Requirements
ML20126B969
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/17/1992
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Yelverton J
ENTERGY OPERATIONS, INC.
References
NUDOCS 9212220300
Download: ML20126B969 (5)


Text

___ - -___ _ _--_ _ - - -

W h UNITED STATES o

.o y

'g NUCLEAR REGULATORY COMMISSION f

REGION IV g

611 RYAN PLAZA DRIVE. SUITE 1000 tj AR61NGTON, TEXAS 76011 DEC 1 T E Dockets:

50-313 50-368 Licenses: DPR-51 NPF-6 u

Entergy Operations, Inc.

ATTN:

J. W. Yelverton, Vice President Operations, Arkansas Nuclear One i

Route 3, Box 137G Russellville, Arkansas 72801 Gentlemen:

SUBJECT:

SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE INSPECTIONS A number of problems have recently been identified with service water systems, therefore, the NRC has designated these systems as the next generic area of emphasis and will perform an in-depth team inspection at most power reactor facilities.

The inspections will-be conducted in accordance with new guidance and will be referred to as service water system operational performance inspections (SWSOPIs).

It will be our intention to complete the inspection process at all involved facilities within the next 3 years.

The inspections will evaluate the capability of the service water system to fulfill its thermal and hydraulic performance requirements. The inspections will include evaluations of the system design, its operation, maintenance, and surveillance, and its past performance indicators. The NRC:has conducted-pilot inspections at a number of facilities, including the-South Texas _ Project in Region IV. These pilot inspections established.the inspection criteria that will be utilized in -the performance of future inspections.

In order to accomplish the planned inspections, Region IV will form five-person inspection teams. The teams will= be composed of Region IV personnel and a mechanical design engineering consultant. The inspections. will include a 4-day preparatory site visit and 2 weeks of onsite. inspection. Each of the onsite trips will be separated by a one week review of the; gathered documentation.

It will be our intent to have the normal authorized access for the.NRC inspectors and escorted access, as necessary, for the consultant.

b We will advise-you of our schedule for performing the -inspection at your-Arkansas Nuclear'One, Units 1 and 2,- facility in future correspordence. We a

i' will then confirm that schedule several weeks prior tofthe start of the inspection and will request that specific information be made available upon the team's arrival at the site.-

e a p. mm 4

9212220300 921217 PDR ADOCK 05000313 G

PDR

l Entergy Operations, Inc. ;

If you have any questions related to the schedule, conduct, or content of the inspection, please contact the assigned team leader, Philip C. Wagner, at (817) 860-8127.

Sincerely,

. Bill Beach, Director Division of Reactor Projects cc:

Entergy Operations, Inc.

ATTN:

Donald C. Hintz, President &

Chief Operating Officer P.O. Box 31995 Jackson, Mississippi 39286 Entergy (perations, Inc.

ATTN: John R. McGaha, Vice President Operations Support P.O. Box 31995 Jackson, Mississippi 39286 Wise, Carter, Child & Caraway ATTN:

Robert B. McGehee, Esq.

P.O. Box 651 Jackson, Mississippi 39205 Entergy Operations, Inc.

ATTN:

R. A. Fenech, General Manager Plant Operations Route 3, Box 137G Russellville, Arkansas 72801 Entergy Operations, Inc.

ATTN:

James J. Fisicaro Director, Licensing Route 3, Box 137G Russellville, Arkansas 72801 Honorable Joe W. Phillips County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801

a Entergy Operations, Inc. Winstoh & Strawn ATTN: Nicholas S. Reynolds, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502 Arkansas Department of Health ATTN: Ms. Greta Dicus, Director Division of Radiation Control and Emergency Management 4815 West Markham Street Little Rock, Arkansas 72201-3867 B&W Nuclear Technologies ATTN:

Robert B. Borsum Licensing Representative 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 Admiral Kinnaird R. McKee, USN. (Ret) 214 South Morris Street Oxford, Maryland 21654 ABB Combustion Engineering Nuclear Power ATTN: Charles B. BriqKman Manager, Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852

~ -. - -

4 l

6-f Entergy Operations, Inc.

4-1 bec to DMB (IE01) - DRS 4

3 bec distrib. by RIV:

3 J. L. Milhoan Resident Inspector l

DRP Section Chief (DRP/A) i Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System j

DRSS-FIPS RSTS Operator-Project Engineer (DRP/A)

RIV File i

DRS Section Chief (DRP\\TSS) i P. Wagner J. D. Wilcox, Jr., NRR (MS-9A1) i I

i i

p 1

i i

4 1

4 4

?

r 4

1 4

/l I!DRP' RIV:TL*

DiDArx k

D Phgner/lb dColYns-rABBeach i

/ /92, k/o / L ll/h/92'

  • previously concurred :

- 1 I

m

  • wss e

e-su=-

r

--- - - - *e-e---ewe,, w a.e

  • atv--r-emr P

+* -

w (9

n s.e,e*

1 Entergy Operations, Inc.,

bectoDMB-(IE01)-

b DRS bec distrib. by RIV:

J. L. Milhoan Resident Inspector DRP Section Chief (DRP/A)

Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RSTS Operator Project Engineer (DRP/A)

RIV File DRS Section Chief (DRP\\TSS) i P. Wagner J. D. Wilcox, Jr., NRR (MS-9A1) 1 I

l l

l

  1. L RIV:TL*

D:D A M D!DRP PWagner/lb hCMns

!,-ABBeach

/ /92 k/G1[

ll/h/92

  • previously concurred l