In Reply Refer To:
00 g gg
Dockets:
50-313/85-07
50-368/85-07
Arkansas Power & Light Company
ATTN:
John M. Griffin,
Senior Vice President -
Energy Supply
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnscn and P. H.
Harrell of this office during the period April 1-30, 1985, of activities
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
Units 1 and 2, and to the discussion of our findings with Mr. T. Cogburn
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verificat. ion,
maintenance, surveillance, followup on previously identified items, followup on
IE information notices, followup on Unit 2 Itcensee event reports, Unit 2 spent
fuel pool activities, emergency preparedness exercise, Unit 2 facility
modifications, Unit 2 refueling activities, Unit 2 pipe support and restraint
systems, and followup on Generic Letter 83-28.
Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors.
The
findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Cunsequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
federal Regulations.
Your response should be based on the specifics contained
in the Notico of Violation enclosed with this letter.
One unresolved item is identified in paragraph 5 of the enclosed inspection
report.
The rea,ponses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Dudget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
C:RPU2/M k C:RPl h
RIV:RPR2/A
RP82
/W9Johnso#vis
'gvPHHa
e
t[Harthf
DRHuntor
6/ //85
A/ //85
4 / //85
6/f/85
050&m
u,m
-
k
. _-
a k ,-
.
2
.' .
.
,
'
~
.
~"
v
.
'
Arkansas Power & Light Company
-2-
1
.
,
Should you have any questions concerning this inspection, we will be' pleased to
discuss them with you.
..t
"
Sincerely,.
,
l
. " Original slened By:~
~
.
,
.,.
D. R. HUNTER
'
-
'
'Dorwin R. Hunter, Chief
Reactor Project Branch 2
-i
,
,
,
.
,
Enclosures:.
<
s.
'
1.
Appendix AJ- Notice of Violation
,
2. ' Appendix B.- NRC Ins'pection Report
'
- 50-313/85-07
~ 50-368/85-07..
,
'
'cc w/ enclosures:
J. M.:Levine,' General Manager
.
..
'
Arkansas . Nuclear One
P. 0. Box 608:
A
. , -
.
..
'
Russe 11ville, Arkansas::72801.
l
Arkansas Radiation Control Program Director
_
'
- bcc to DM8
- (IE01)
'.
~
j
bcc distrib. by RIV:
,
R. D. Martin,~RA
' '
'*RPB2
- Resident. Inspector-
.
- D. Weiss, LFM8 (AR-2015)
~
'*EP&RPB
- Section Chief-(RP82/A)
'
. RIV' File > ..
. R. Denise, DRS&P
- W. Johnson
-
- MIS SYSTEM ~.
- RSTS-Operator
- P. Harrell
.
.,
,
.
- w/766
~
,
,
t
-
'7
(
f
9-
W
p
$
.
'N
.
%- e %
-
'
GOI
'
'
_
.
.
.
.-.
,
-h
.:_ l
-
_.
s
.a