l C%g UNITED STATES l-
,a x -
NUCLEAR REGULATORY COMMISSION i
REGION IV
[
611 AYAN PLAZA onlVE SUITE 1000 l
D,,'9,,,,8 ARLINo TON. TEXAS 76011 -
i Docket:
50-798 i
License:
DPR-46 Nebraska Public Power District ATTN:. Guy R. Horn, Nuclear Power i
Graup Manager P.O. Box 499 Columbus, Nebraska 68602-0499 I
Gentlemen:
i SU3 JECT:
SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE INSPECTIONS A number of problems have recently been identified with service water systems, therefore, the NRC has designated th3se;uystems as the next generic area of emphasis and wil_1 perform an in-depth team inspection at most power reactor facilities. The-inspections wi;l be conducted in-accordance with new guidance.
i i
and will be referred to as service water system operationalL performance i_
inspect. ions (SWSOPIs).
It will be our intention to complete the: inspection process at all involved facilities within the_next 3 years..
The inspections'will evaluate the capability of-the service water system to-fulfill its thermal and hydraulic performance requirements. l The inspections i
will include evaluations of the system design, its operation,. maintenance, and surveillance, and its past performance indicators.
The NRC has conducted l
pilot' inspections at-a number of facilities, includino the South Texas Project in Region IV. These'pi'iot inspections established the inspection criteria that will be utilized in the performance of future inspections, In order to accomplish the planned inspections,. Region IV will form five-persoa inspection teams.
The teams will be_ composed of Region IV personnel i
and a mechanical design engineering consultant. The inspections will-include j.
a 4-day preparatory site visit and 2 weeks of onsite inspection.' Each of the onsite trips.will.-be separated by a one week review of the gathered' documentation.
It will: be our intent to have the normal authorized access-for-d the NRC inspectors and' escorted access, as necessary, for the consultant.
i
- We are presently planning to conduct the preparatory site visit at the_ Cooper Nuclear Station facility during the week of July 19, 1993.
We'would L
-appreciate being made awarc of any conflict; with our proposed dates as soon -
as possible. _ We will. confirm this' schedule _ several. weeks prior to the start 4
i.
of the inspection and will request that specific information be made.available upon the team's arrival at-the site.
F E20011 9212220310 021217
-1 t
PDR ADOCK 05000290
)Lc 4
2.1 i --
Nebraska Public Power District ;
i l.'
If you have any questions related to the schedule, conduct, or content of the inspection, please contact the assigned team leader, Philip Ce Wagner, at (817) 860-8127.
J Sincerely, 4
4e
/A.-Bill Beach, Director Division of Reactor Projects b
- cc:
Nebraska Public Power District ATIN:
G. D. Watson, General Counsel P.O. Box 499 Columbus, Nebraska 68602-0499
]r Cooper th clear Station
- ATTN: John M. Meacham, Site Manager P.O. Box 98 Brownville, Nebraska 68321 Nebraska Department of Environmental Control:
ATTN: Randolph Wood, Director P.O. Box 98922 Lincoln, Nebraska 68509-8922 Nemaha County Board of Commissioners
. ATTN: Richard Moody, Chairman' Nemaha County Courthouse 1824 N Street Auburn, Nebraska 68305 Nebraska Department of Health
- ATTN:. Harold Borchert, Director Division of Radiological Health 301 Centennial Mall, South P.O. Box 95007 i
Lincoln, Nebraska 68509-5007 q
Kansas Radiation Control Program Director
,c-
.., ~,...,.,...,
. -. ~.
. _. ~.... -. _ - -...., -... -.. -. -.
-.. ~ -
j:
. - Neb'raska Public. Power District ;
1 i
bec to DMB'(IE01) - DRS bec distrib. by RIV:
J. L. Milhoan Resident Inspector DRP Section Chief;(DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503-MIS System i
DRSS-FIPS RSTS Operator Project Engineer (DRP/C)
.RIV File 4
DRS Section Chief (DRP/TSS):
Senior. Resident Inspector - River Bend Senior Resident Inspector - Fort Calhoun P. Wagner J. D. Wilcox, Jr., NRR-(MS-9A1) i-9 l
1 i
i-i 4
i i
I-l lRIV:TL*
DM D#P -
lPWagner/lb
/bJCollins-Al)8)ach -
j.
. l
/ -/92
@ /u /92 11/o /92 j
l
. previously conc W 2-
l
~
Nebraska Public Power District.,
1 jg!bcc'to DMBl(IE01) -.DRS bec distrib. by RIV:
J. L. Milhoan Resident Inspector DRP Section Chief (DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RSTS Operator Project Engineer (DRP/C)
RIV File DRS Section Chief (DRP/TSS)
Senior Resident Inspector - River Bend Senior Resident Inspector - Fort Calhoun P. Wagner J. D. Wilcox, Jr., NRR (MS-9A1) i r
RIV:TL*
D@
D;QRP PWagner/lb
/SJCollins AkB3ach
/ /92 9 /A /92 il /o /92
- previously conc W '
.,.