ML20126B987

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 92-184 W/Util on 930107 in King of Prussia,Pa to Conduct Enforcement Conference Re Isolation of ECCS Pump Min Flow Recirculation Line.Nrc & Licensee Attendees Listed
ML20126B987
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/22/1992
From: Larry Nicholson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
EA-92-237, NUDOCS 9212220313
Download: ML20126B987 (3)


Text

. _ _ _ _ _ _ - __

a, -

d#

i U.S. NUCLEAR REGULATORY COMMISSION- No.92-184 REGION I EA 92-237  ;

NOTICE OF SIGNIFICANT MEETING Licensee: Baltimore Gas and Electric Company Facility: Calvert Cliffs Units 1 and 2 Docket Nos.: 50-317 and 50-318 5

Time and Date: 10:00 a.m., January 7,1993 I

Imation: USNRC, Region I, King of Prussia, Pennsylvania Main Conference Room i

Purpose:

Enforcement Conference Concerning Isolation of the Emergency Core Cooling System Pump Minimum Flow l Recirculation Line

! NRC Attendees: C. Hehl, Director, Division of Reactor Projects (DRP)

C. Cowgill, Chief, Reactor Projects Branch No.1, DRP L. Nicholson, Chief, Reactor Projects Section No l A, DRP F. Lyon, Resident Inspector K. Smith, R:gional Attorney i D. Holody, Enforcement Specialist R. Capra, Director, Project Directorate I-1, Office of Nuclear Reactor Re;ulation (NRR) l D. Mcdonald, Project Manager, NRR

S. Greenlee, Reactor Engineer, DRP l

l Licensee Attendees: R. Denton, Vice President, Nuclear Energy Division

C. Cruse, Plant General Manager l G. Detter, Director, Regulatory Affairs

! R. Franke, Compliance Engineer l P. Chabot, Superintendent, Technical Support J. Hill, General Supervisor, Nuclear Power Operations

( ,

1 i

1 i

I 6 9 Es e ' .4 9212220313 921222

- ffl goa ApocK0500g7 Q.

v i

9 8

4 .

4 l I I

! Meeting Notice No.92-184 ~ 2 4 . .

{ NOTE: This enforcement conference is open to the general public. Attendance by NRC personnel at this meeting should be made known by January 6,1993 via telephone

call to Larry Nicholson, Region I, at (215) 337-5128. Handicapped persons requiring assistance to attend or participate in the meeting shall- make their l

requests known to larry Nicholson, USNRC, Region I,475 Allendale 'Rd., King j of Prussia, PA 19406, no later than two business days prior to the meeting.

Prepared by:_ d- Os j I Pg 2rry-E. Nicholson, Chief Reactor Projects Section No. l A

)

2 i

l l

1 i

r i

I' I'i  !

, l i I i

i l

t.

l

. I

.- M o'

0 i i a Meeting Notice No.92-184 3 l Dipributio.n (Via E-Mall): l J. Taylor, Executive Director for Operations (EDO)

J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

B. Grimes, Director, Division of Reactor Inspection an<' & eguards, NRR J. Lieberman, Director, Office of Enforcement J. Goldberg, Office of the General Counsel (OGC)

T. Murley, Director, Office of Nuclear Reactor Regulation W. Russell, Associate Director for Inspection and Technical Assessment, NRR

J. Partlow. Associate Director for Projects, NRR S. Varga, Director, Division of Reacien Projects - I/II, NRR J. Calvo, Assistant Director for Region I Reactors, NRR R. Capra, Director, Project Directorate I-1, NRR D. Mcdonald, P;oject Manager, NRR S. Bajwa, RPEB/NRR N. Green, Jr., Policy Development and Technical Support Branch V. McCree, Regiona? Csordi.nator, OEDO L. Chandler, OriC NRC Resident inspector Region I Branch Chiefs Region I Sectiva Chiefs 4 K. Abraham, Public Affairs Officer, RI D. Screnci, Field Public Affairs Officer, RI 4 M. Banerjec, State Liaison Officer, RI J. McGrath, State Agreements Officer, RI K. Smith, Regional Attorney, RI D. Holody, Enforcement Officer, RI B. Letts, Office of Investigations, Region I Field Office J. Lanning, DRP, RI J. Douglas, DRMA, RI Distribution

l Public Document Room (PDR)

Local Public Document Room (LPDR)

State of Maryland Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRSS Division Secretary, RI-DRMA Division Secretary, RI Projects Branch No.1, Secretary, RI Region I Receptionist J