ML20126B934
ML20126B934 | |
Person / Time | |
---|---|
Site: | Palo Verde, Catawba, Arkansas Nuclear, Bellefonte, McGuire |
Issue date: | 02/12/1980 |
From: | Wheaton W BYRON JACKSON PUMP, EMVBORGN |
To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
Shared Package | |
ML20126B937 | List: |
References | |
REF-PT21-80-197-000 Q-80-041-WRW, Q-80-41-WRW, NUDOCS 8003240069 | |
Download: ML20126B934 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999
[Table view]Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217F8011999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 1999-09-30 Category:INCOMING CORRESPONDENCE MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999
[Table view]Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 1999-09-09 Category:VENDOR/MANUFACTURER TO NRC MONTHYEARML20059B5801990-08-23023 August 1990
[Table view]Forwards Signed Affidavit Committed in Licensee 900808 Revised Request for License Amend to Increase Reactor Power to 100% Full Power & Nonproprietary Calculation 86-1179795-02, Arkansas Nuclear One-1 HPI Flow Rate ML20005D6401989-11-30030 November 1989 Forwards Affidavit Supporting Proprietary Info in 891121 Ltr from Jj Fisicaro Re Amend to Increase Reactor Power Level to 100% Power ML19327B2491989-10-0606 October 1989 Forwards Justification for Extension of Applicability of 890807 SER Re Acceptance of BAW-10175, Rod Exchange Methodology Topical Rept. ML20246E3551989-06-21021 June 1989 Submits Plan for Quadrex Corp to Lease Plant,Complete Facility,Operate Facility,Sell Power & Eventually Return Plant to Tva.Topic Will Be Discussed at 890711 Meeting ML20247P8071989-04-0404 April 1989 Forwards Ltr in Which Concerns for Potential Significant Deficiency Under 10CFR21 Expressed ML20247G4991989-03-30030 March 1989 Forwards Proprietary BAW-10175P, Rod Exchange Methodology, Developed for Calculating Parameters While Performing Control Rod Measurements Using Rod Exchange Technique to Be Used at Plants.Rept Withheld (Ref 10CFR2.790) ML17304B0511989-02-23023 February 1989 Requests That Sending of NRR Correspondence W/Util Re Plant to Recipient Continue,In Response to 890216 Ltr ML19324C3151989-02-20020 February 1989 Informs of Change in Vendor Plans for Inspecting Fuel Rods Containing Fuel Pellets Supplied by Ge.Ultrasonic Insp of Fuel Rods at Oconee 1 Found No Failed Rods in three-cycle, Discharged Fuel Assemblies ML20235M8971989-02-10010 February 1989 Requests Withholding of Proprietary WCAP 12125, Catawba Unit 1 Evaluation for Tube Vibration Induced Fatigue, Per 10CFR2.790 ML20205Q6331988-11-0202 November 1988 Forwards Revised Proprietary Pages to BAW-10164P, RELAP5/Mod2-B&W,Advanced Computer Program for LWR LOCA & Non-LOCA Transient Analysis. Cso Film Boiling Correlation Replaced w/Condie-Bengston IV Correlation & Typos Corrected ML20195B6091988-10-21021 October 1988 Forwards Summary of B&W Fuel Co Position Re Small Break LOCA Calculations Contained in Util FSARs for Upcoming Reload Cores Which Will Contain Fuel Mfg by B&W ML20207L9221988-09-26026 September 1988 Requests That Proprietary Rept WCAP-10988 Re Response to NRC Questions on COBRA-NC/Model 3 Be Withheld from Public Disclosure (Ref 10CFR2.790).Affidavit Encl ML20207L7651988-08-30030 August 1988 Requests That Proprietary WCAP 11935, McGuire Unit 2 Evaluation for Tube Vibration Induced Fatigue, Be Withheld from Public Disclosure (Ref 10CFR2.790) ML20151H9381988-07-25025 July 1988 Forwards Proprietary BAW-10168P, B&W LOCA Evaluation Model for Recirculating Steam Generator Plants ML20151F7661988-03-29029 March 1988 Forwards Updated Pages to Proprietary BAW-10171P, REFLOD3B- Model for Multinode Core Reflooding Analysis, Per ECCS Methodology for Facilities Reloads.Mod Removes Henry Quench Temp Criteria & Potential Conflict in Logic.Pages Withheld ML20234C2231987-12-28028 December 1987 Forwards Proprietary BAW-10164P, RELAP5/MOD2-B&W,Advanced Program for LWR LOCA & Non-LOCA Transient Analysis. Rept Describes Computer Code Used to Analyze RCS Behavior During Blowdown Phase of LOCA Transient.Rept Withheld ML20234D1101987-12-14014 December 1987 Forwards Proprietary BAW-10171P, REFLOD3B,Model for Multinode Core Reflooding Analysis. Rept Describes Computer Code That B&W Will Be Using to Analyze RCS Behavior During Refill of LOCA Transient.Rept Withheld ML20236C0261987-10-22022 October 1987 Forwards Proprietary BAW-10165P, FRAP-T6-B&W:Computer Code for Transient Analysis of LWR Fuel Rods. Rept Describes Computer Code That B&W Will Be Using for Future Transient Analyses of LWR Fuel Rods.Rept Withheld (Ref 10CFR2.790) ML20235T9741987-09-22022 September 1987 Requests That Encl Proprietary Rev 2 to WCAP-11308, RTD Bypass Elimination Licensing Rept for Catawba Units 1 & 2 Be Withheld (Ref 10CFR2.790) LD-87-056, Forwards Summary of C-E Fuel Irradiated &/Or Discharged in 1986 on plant-by-plant Basis in Response to 870807 Request1987-09-18018 September 1987 Forwards Summary of C-E Fuel Irradiated &/Or Discharged in 1986 on plant-by-plant Basis in Response to 870807 Request ML20235V3811987-09-16016 September 1987 Requests Proprietary Responses for Amend to Tech Specs Re Adoption of Tube Sheet Region Plugging Criterion Be Withheld (Ref 10CFR2.790).Justification & Discussion of NSHC Encl ML20236H4971987-07-29029 July 1987 Forwards Draft Proprietary Topical Rept BAW-10166P, Beach Computer Code for Reflood Heat Transfer During Loca. Draft Submitted to Permit Interaction Between B&W,Nrc & Util. Affidavit for Withholding Encl.Fee Paid ML17303A4851987-07-13013 July 1987 Forwards Steam Generator Tube Vibration Evaluation Program Progress Rept,Per Gw Knighton 870327 Ltr & Author 870410 Commitment.Rept Provides General Description of Program, Results to Date & Anticipated Direction of Future Efforts ML20236B4141987-07-13013 July 1987 Forwards Proprietary Draft 1 of BAW-10168P, ...B&W LOCA Evaluation Model for Recirculating Steam Generator Plants, to Be Used for LOCA Analysis of Catawba & McGuire Reload Fuel Cycles.Rept Withheld (Ref 10CFR2.790).Fee Paid ML20235B6591987-07-0202 July 1987 Forwards Part 21 Rept Re Consolidated 3787WA Safety Valve Spring Failure for Plant,Per Request ML17300A9741987-06-16016 June 1987 Discusses Actions Taken in Investigation of Bechtel Deficiency Rept DER 86-29 Re Cracked Reactor Coolant Inlet Nozzle on Letdown Hx.Utils Should Be Notitified to Perform Visual Exam of Inlet & Outlet Nozzles.Part 21 Related ML20235Z5491987-05-21021 May 1987 Requests Proprietary Classification for Resistance Temp Detector Bypass Elimination Rept & Support Documentation,Per 10CFR2.790 ML20212R4711987-04-15015 April 1987 Forward Proprietary Draft 1 to BAW-10171P, REFLOD3B,Model for Multinode Core Reflooding Analysis, for Review of ECCS Methodology for Plants Fuel Reloads,Per . W/Affidavit.Draft Withheld (Ref 10CFR2.790).Fee Paid LD-87-017, Responds to 870327 Questions Re Steam Generator Tube Vibration Observed at Palo Verde Units 1 & 2.Definition & Scope of Program to Review Phenomenon Will Be Available for Review W/Nrc in Approx 90 Days1987-04-10010 April 1987 Responds to 870327 Questions Re Steam Generator Tube Vibration Observed at Palo Verde Units 1 & 2.Definition & Scope of Program to Review Phenomenon Will Be Available for Review W/Nrc in Approx 90 Days ML20206E7851987-04-0202 April 1987 Confirms Intention to Use FOAM2 Computer Program as Part of ECCS Evaluation Model for Westinghouse Designed Plants. Review of Applicability of Code to Westinghouse Designed Plants Requested Prior to 880701 NRC-87-3194, Documents 861231 Telcon Re Anomalous Plant Data at Callaway & Wolf Creek.Investigation Initiated.Data Specs for McGuire, Catawba & Millstone Will Be Transmitted1987-01-0707 January 1987 Documents 861231 Telcon Re Anomalous Plant Data at Callaway & Wolf Creek.Investigation Initiated.Data Specs for McGuire, Catawba & Millstone Will Be Transmitted ML20213H0151986-11-14014 November 1986 Forwards Proprietary Draft 1 to BAW-10165P, FRAP-T6-B&W Computer Code for Transient Analysis of LWR Fuel Rods. Rept Submitted to Permit Interaction Between NRC & B&W to Support Util Schedule Needs.Rept Withheld (Ref 10CFRF2.790) NRC-86-3160, Submits Updated List of Plants Affected by Changes in ECCS Evaluation Model Described in Rev 1 to Addendum 3 to WCAP-9561-P1986-09-0808 September 1986 Submits Updated List of Plants Affected by Changes in ECCS Evaluation Model Described in Rev 1 to Addendum 3 to WCAP-9561-P LD-86-038, Provides Info for Reactor Coolant Pump Data Bases on C-E Designed NSSS 80 for facilities.WPPSS-3 Should Be Added to Data Base1986-09-0505 September 1986 Provides Info for Reactor Coolant Pump Data Bases on C-E Designed NSSS 80 for facilities.WPPSS-3 Should Be Added to Data Base ML20203M6321986-08-29029 August 1986 Forwards Proprietary Draft 1 to BAW-10164P, RELAP/MOD2 - B&W.Advanced Computer Program for LWR LOCA & Non-LOCA Transient Analysis, Per 860714 Licensing Plan for ECCS Methodology.Rept Withheld (Ref 10CFR2.790).Affidavit Encl LD-86-034, Forwards Performance Info for C-E Supplied Nuclear Fuel for CY85 on plant-by-plant Basis,Per NRC 860618 Request.Info Includes Number of Fuel Assemblies & Fuel Rods Irradiated &/Or Discharged & Batch Average Burnups1986-08-0101 August 1986 Forwards Performance Info for C-E Supplied Nuclear Fuel for CY85 on plant-by-plant Basis,Per NRC 860618 Request.Info Includes Number of Fuel Assemblies & Fuel Rods Irradiated &/Or Discharged & Batch Average Burnups ML20212B8741986-08-0101 August 1986 Requests That WCAP-11224 Tubesheet Region Plugging Criterion for Duke Power Co McGuire Nuclear Station Units 1 & 2 Steam Generators Be Withheld from Public Disclosure (Ref 10CFR2.790).Affidavit Encl ML20199F3121986-06-19019 June 1986 Requests Summary of 860527 Meeting W/Util to Discuss Licensee Plans to Shot Peen Unit 1 Steam Generator Tubes & Results of Recent Unit 2 Steam Generator Tube Insps ML20198J4621986-05-23023 May 1986 Forwards Proposed Licensing Plans for Safety/Eccs Analysis Submittals for Facility Reloads.Comparison W/Original Licensing Plans Provided LD-86-024, Forwards Proprietary & Nonproprietary Rev 0 to CEN-330,Rev 01 to CEN-304 & Rev 01 to CEN-305 Re Improvement Program. Proprietary Repts Withheld (Ref 10CFR2.790).Affidavit for Withholding Repts Encl.Fee Paid1986-05-21021 May 1986 Forwards Proprietary & Nonproprietary Rev 0 to CEN-330,Rev 01 to CEN-304 & Rev 01 to CEN-305 Re Improvement Program. Proprietary Repts Withheld (Ref 10CFR2.790).Affidavit for Withholding Repts Encl.Fee Paid LD-86-022, Forwards Proprietary Suppl 1,Rev 3 to CEN-39(A)-P & Nonproprietary Suppl 1,Rev 3 to CEN-39(A)-NP, CPC Protection Algorithm Software Change Procedure. Affidavit Encl.Proprietary Rept Withheld (Ref 10CFR2.790).Fee Paid1986-04-0808 April 1986 Forwards Proprietary Suppl 1,Rev 3 to CEN-39(A)-P & Nonproprietary Suppl 1,Rev 3 to CEN-39(A)-NP, CPC Protection Algorithm Software Change Procedure. Affidavit Encl.Proprietary Rept Withheld (Ref 10CFR2.790).Fee Paid NRC-86-3112, Forwards Results of Bart Evaluation Model Large Break LOCA 10CFR50.46 Analysis,Demonstrating Acceptability of upper-head Injection Removal in Support of License Amend. Info Re Sys Behavior W/ & W/O upper-head Injection Encl1986-03-18018 March 1986 Forwards Results of Bart Evaluation Model Large Break LOCA 10CFR50.46 Analysis,Demonstrating Acceptability of upper-head Injection Removal in Support of License Amend. Info Re Sys Behavior W/ & W/O upper-head Injection Encl ML20138A1331986-03-12012 March 1986 Forwards Draft McGuire Bart Evaluation Model Analysis W/Upper Head Injection (Uhi) Removed from Svc.Results Preliminary.Discussion of Calculated ECCS Performance W/O Uhi Encl as Requested LD-86-012, Forwards Revs 0 to Proprietary CEN-323-P & Nonproprietary CEN-323-NP, Reload Data Block... & Revs 3 to Proprietary CEN-39(A)-P & Nonproprietary CEN-39(A)-NP, CPC Protection Algorithm.... Proprietary Repts Withheld (Ref 10CFR2.790)1986-02-10010 February 1986 Forwards Revs 0 to Proprietary CEN-323-P & Nonproprietary CEN-323-NP, Reload Data Block... & Revs 3 to Proprietary CEN-39(A)-P & Nonproprietary CEN-39(A)-NP, CPC Protection Algorithm.... Proprietary Repts Withheld (Ref 10CFR2.790) ML20137L0391985-12-0606 December 1985 Requests Withholding of Proprietary Info from Public Disclosure (Ref 10CFR2.790) ML20137Z5281985-11-27027 November 1985 Requests Withholding Proprietary WCAP-10988, COBRA-NC, Analysis of Main Steam Line Break in Catawba Unit 1 Ice Condenser Containment, (Ref 10CFR2.790(b)(1)) NRC-85-3081, Forwards Proprietary WCAP-10988 & Nonproprietary WCAP-10989, COBRA-NC,Analysis of Main Steam Line Break in Catawba Unit 1 Ice Condenser Containment. Proprietary Version Withheld (Ref 10CFR2.790)1985-11-27027 November 1985 Forwards Proprietary WCAP-10988 & Nonproprietary WCAP-10989, COBRA-NC,Analysis of Main Steam Line Break in Catawba Unit 1 Ice Condenser Containment. Proprietary Version Withheld (Ref 10CFR2.790) ML20205H3571985-09-19019 September 1985 Requests Proprietary Resistance Temp Detector Bypass Elimination Licensing Rept for McGuire Units 1 & 2 Be Withheld (Ref 10CFR2.790) LD-85-043, Forwards Nonproprietary Revs 00 to CEN-304-NP & CEN-305-NP & Proprietary Revs 00 to CEN-304-P & CEN-305-P,per NRC Request for Generic Design Specs.Proprietary Repts Withheld (Ref 10CFR2.790)1985-08-30030 August 1985 Forwards Nonproprietary Revs 00 to CEN-304-NP & CEN-305-NP & Proprietary Revs 00 to CEN-304-P & CEN-305-P,per NRC Request for Generic Design Specs.Proprietary Repts Withheld (Ref 10CFR2.790) LD-85-044, Forwards Proprietary & Nonproprietary Rev 0 to Cpc/Ceac Software Mods for CPC Improvement Program. Proprietary Rept Withheld (Ref 10CFR2.790)1985-08-30030 August 1985 Forwards Proprietary & Nonproprietary Rev 0 to Cpc/Ceac Software Mods for CPC Improvement Program. Proprietary Rept Withheld (Ref 10CFR2.790) 1990-08-23 |
Text
.,o n, 9- e -
. .% 3 <- - - 5.3- u t. ; 1 : j it w -
- Q.: -tx, g&Q:g y 7 3 -. y , 9. -
h " " Ec.
Nucicht Vchro Dhisl6n~ :_
. r. ___-
, r, Borg-Wane < Cctpcsataca 7500 Tyrore Ave .ve. Mays. r af% 914D9 - 70:ephorw 213 781-c Ltalog Ao:siess P.O. Es::x 2125. Va n NWs.ceJsiotrua TWX 91N951726 Q-80-041/F'
~
[O - / 9 '7-00 O
'l0
' s \g J, Icbruary 12, 1980
.,7 h g Rotort H. Engelken, Director Region Y Office of Inspection and Enforcarnent d,f qc? ' "siM-,/
U.S. Nuclear Regulatory Cor.znission "
1990 No. California Blvd, Suite 202 9 Walnut Creek, California 94596 ,,
i'
Subject:
Notification Under Rules of 10CFR21 'r #' '
Reference:
Telecon Feb. 7,1930 D. Sternberg, NRC and W.R. Beaton , NVD-BW Dear Mr. Engelken; The attached report serves as forrral written notification supple-mer. ting t.he referer.ce telecon of Feb. 7,1980, as required by 10CFR21.
This report is filed on thc basis of one known safety related applica-tien by Duke Pcwer Ccepany. Other custorrers noted in the report have been asked to evaluate their applicaticas of similar valves and deter-mire their individual situations.
If additicnal infortration is required, do not hesitate to contact i
the undersigned at your convenience. j l
Respectfully, Nucicar Valve Division l BOR3 WARNER CORPORATION l 1
/....-
W.R. Wheaton Di rector, '
Quali ty Assurance WRW/Jeh 213/781-4000 Ext 267/268 cc: C.A. Dotter, President & Gen. Mgr, NVD R.W. Fri tch, Vice President, Engr and Q. A.
e