Advises That Svc Water Sys Operational Performance Insps Will Be Conducted at Most Power Reactor Facilities.Insps Will Evaluate Capability of Svc Water Sys to Fulfill Thermal & Hydraulic Performance Requirements
ML20126C006
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/17/1992
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 9212220320
Download: ML20126C006 (5)


Text

_

UNITED STATES e s.

t NUCLEAR REGULATORY COMMISSION h'[

REGION IV

.f 611 RYAN PLAZA DRIVE SUITE 1000

'%,,\\ ', 8 ARLINGTON, TEXAS 76011 DEC 171992 Docket Nos. 50-445 50-446 License:

NPF-87 Construction Permit:

CPPR-127 TV Electric ATTN:

W. J. Cahill, Jr., Group Vice President Nuclear Engineering and Operations Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Gentlemen:

SUBJECT:

SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE INSPECTIONS A number of aroblems have recently been identified with service water systems, therefore, tie NRC has designated these systems as the next generic area of emphasis and will perform an in-de)th team inspection at most power reactor facilities.

The inspections will se conducted in accordance with new guidance and will be referred to as service water system operational performance inspections (SWSOPIs).

It will be our intention to complete the inspection process at all involved facilities within the next 3 years.

l The inspections will evaluate the capaoility of the service water system to fulfill its thermal and hydraulic performance requirements.

The inspections will include evaluations of the system design, its operation, maintenance, and surveillance, and its past performance indicators.

The NRC has conducted pilot inspections at a number of facilities, including the South Texas Project l

in Region IV.

These pilot inspections established the inspection criteria that will be utilized in the performance of future inspections.

In order to accomplish the planned inspections Region IV will form five-person inspection teams.

The teams will be composed of Region IV personnel and a mechanical design engineering consultant.

The inspections will include a 4-day preparatory site visit and 2 weeks of onsite inspection.

Each of the l

onsite trips will be separated by a one week review of the gathered documentation.

It will be our intent to have the normal authorized access for the NRC inspectors and escorted access, as necessary, for the consultant.

We will advise you of our schedule for performing the inspection at your Comanche Peak Steam Electric Station, Units 1 and 2 facility in future correspondence. We will then confirm that schedule several weeks prior to the start of the inspection and will request that specific information be made available upon the team's arrival at the site.

9212220320 921217

///h' k

gDR ADOCK 05000445

/

PDR y

TV Electric.

If you have any questions related to the schedule, conduct, or content of the inspection, please contact the assigned team leader, Philip C. Wagner, at (817) 860-8127.

Sincerely,

[

. Bill Beach, rect -

Division of Reactor Projects cc:

TU Electric ATTN:

Roger D. Walker, Manager of Regulatory Affairs for Nuclear Engineering Organization Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Juanita Ellis President - CASE 1426 South Polk Street Dallas, Texas 75224 GDS Associates, Inc.

i Suite 720 1850 Parkway Place Marietta, Georgia 30067-8237 TU Electric Bethesda Licensing 3 Metro Center, Suite 610 Bethesda, Maryland 20814 Jorden, Schulte, and Burchette ATTN: William A. Burchette, Esq.

Counsel for Tex-La Electric Cooperative of Texas 1025 Thomas Jefferson St., N.W.

Washington, D.C.

20007 l

l

_ _ - _. _ _ _ _ _ _ _ _ - ~ _. _ _ _ _. _ - - _ _. _ _ _.. _

i ;

1 i

i e

j TV Electric 2 Newman & Holtzinger, P.C.

j ATTN: Jack R. Newman, Esq.

j 1615 L. Street, N.W.

1 Suite 1000 Washington,-0.C.

20036 I

Texas Department of Licensing & Regulation ATTN:

G. R. Synog, Program Manager /

l Chief Inspector Boiler. Division 1

1 P.O. Box 12157, Capitol Station-j Austin, Texas '78711 Honorable Dale McPherson i

County Judge i

P.O. Box 851 Glen Rose, Texas 76043 Texas Radiation Control Program Director 1100 West 49th Street i

Austin, Texas 78756 Owen L. Thero, President i

Quality Technology Company Lakeview Mobile Home Park, Lot 35 4793 E.-Loop 820 South 4

i-Fort Worth. Texas 76119 l-l 1

i j

i 1

0 Y

TU[lectric -

bec to DMB (IE01) - DRS bec distrib by RIV:

J. L. Milhoan Resident inspector (2)

DRP Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: HNBB 4S03 MIS System DRSS-FIPS RSTS Operator Project Engineer (DRP/B)

RIV File DRS Section Chief (DRP/TSS)

P. Wagner J. D. Wilcox, Jr., NRR (MS-9A1) 1f RIV:TL*

D: [

N dDRP PWagner/lb S[Co'llins -

4BBeach y

/ /92 ke LS/

l Ik/k/92

  • previously concurred

TV Electric ' bec to DMB (IE01) - DRS bec distrib by RIV:

J. L. Milhoan Resident inspector (2)

DRP Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RSTS Operator Project Engineer (DRP/B)

RIV File DRS Section Chief (DRP/TSS)

P. Wagner J. D. Wilcox, Jr., NRR (MS-9A1)

>_f RIV:TL*

D:[h N, dDRP PWagner/lb S[Coblins 4BBeach v

/ /92 k 13/

J ))/)(r /92

  • previously concurred

.