Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128F068 + (19:08:49, 12 December 2024)
- ML20128F067 + (19:08:50, 12 December 2024)
- ML20128F066 + (19:08:51, 12 December 2024)
- ML20128F065 + (19:08:52, 12 December 2024)
- ML20128F064 + (19:08:52, 12 December 2024)
- ML20128F062 + (19:08:53, 12 December 2024)
- PNO-I-85-037A, on 850523,reactor Shutdown Initiated Due to Lubricating Oil Circulation Pump Motor Tripping on Diesel Generator B.Generator Declared Inoperable.Shutdown Will Be Terminated After Oil Circulation Pump Motor Replaced + (19:08:54, 12 December 2024)
- ML20128F059 + (19:08:55, 12 December 2024)
- ML20128F056 + (19:08:56, 12 December 2024)
- ML20128F057 + (19:08:56, 12 December 2024)
- ML20128F053 + (19:08:57, 12 December 2024)
- ML20128F052 + (19:08:58, 12 December 2024)
- ML20128F050 + (19:08:59, 12 December 2024)
- ML20128F046 + (19:09:00, 12 December 2024)
- ML20128F047 + (19:09:00, 12 December 2024)
- ML20128F042 + (19:09:01, 12 December 2024)
- ML20128F041 + (19:09:02, 12 December 2024)
- HBL-93-005, Forwards Public Version of Rev 2 to Emergency Plan.Vol 3,Rev 20 Appears at Top of Each Page of Rev to Reflect Incorporation of Emergency Plan Into Hbpp Plant Manuals & Current Sys for Maint of Manuals.W/930202 Release Memo + (19:09:03, 12 December 2024)
- ML20128F035 + (19:09:03, 12 December 2024)
- IR 05000272/1985009 + (19:09:05, 12 December 2024)
- ML20128F032 + (19:09:06, 12 December 2024)
- ML20128F023 + (19:09:07, 12 December 2024)
- ML20128F025 + (19:09:07, 12 December 2024)
- ML20128F022 + (19:09:08, 12 December 2024)
- ML20128F018 + (19:09:09, 12 December 2024)
- ML20128F017 + (19:09:10, 12 December 2024)
- 2CAN029301, Forwards Addl Info Re NRC Review of Generic Ltr 90-06, Resolution of Generic Issue 70, Power-Operated Relief Valve & Block Valve Reliability & Generic Issue 94, Addl Lwop for Lwrs + (19:09:11, 12 December 2024)
- ML20128F013 + (19:09:14, 12 December 2024)
- AECM-85-0168, Forwards Application for Amend to License NPF-29,changing Tech Spec Table 3.3.7.9-1 to Add Four Smoke Detectors in Area 1A12.Fee Paid + (19:09:15, 12 December 2024)
- ML20128F006 + (19:09:16, 12 December 2024)
- IR 05000348/1993003 + (19:09:17, 12 December 2024)
- 05000322/LER-1985-021, :on 850615,bomb Threat Received Over 911 Telephone Number from Unidentified Individual Stating Device Placed in Containment Bldg.Security Alert Declared & Site Evacuated.No Explosive Device Found + (19:09:19, 12 December 2024)
- 05000282/LER-1993-001-01, On 930105,discovered That Surveillance of Hydrogen Recombiners Did Not Meet TS 4.4.I Requirement That Require Functional Test Every 6 Months.Caused by Procedure Inadequacy.Surveillance Testing Performed + (19:09:21, 12 December 2024)
- ML20128F000 + (19:09:23, 12 December 2024)
- ML20128E999 + (19:09:25, 12 December 2024)
- ML20128E998 + (19:09:25, 12 December 2024)
- ML20128E997 + (19:09:26, 12 December 2024)
- 05000341/LER-1993-001, :on 930104,HPCI Turbine Exhaust/Exhaust Drain Valve Did Not Fully Open.Caused by Coil in HPCI Turbine Exhaust Valve Open Relay Deenergized.Relay Replaced & Retested to Ensure Proper Function + (19:09:28, 12 December 2024)
- SNRC-1184, Forwards Clarified Responses to Generic Ltr 83-28,Items 2.1.1,2.2.2,4.5.1,4.5.2 & 4.5.3,in Response to NRC .Encl Responses Address Reactor Trip sys,safety-related Equipment,Functional Testing & Testing Intervals + (19:09:29, 12 December 2024)
- ML20128E994 + (19:09:29, 12 December 2024)
- ML20128E989 + (19:09:31, 12 December 2024)
- ML20128E988 + (19:09:31, 12 December 2024)
- PLA-3913, Advises That Ds Hays (Operator License OP-10759) Tentatively Accepted & Currently Performing Duties Associated W/Another Position within Util Which Does Not Require Reactor Operator License.Hays Will Not Maintain License + (19:09:32, 12 December 2024)
- ML20128E983 + (19:09:34, 12 December 2024)
- ML20128E981 + (19:09:34, 12 December 2024)
- ML20128E974 + (19:09:35, 12 December 2024)
- ML20128E972 + (19:09:36, 12 December 2024)
- 0CAN038505, Forwards 1985 Exercise Scenario for Review.Exercise Will Begin on 850424 & Terminate on 850425.Schedule for pre-exercise Briefings & post-exercise Critiques Provided + (19:09:37, 12 December 2024)
- 05000271/LER-1993-002, :on 930114,discovered That TS Required Monthly Surveillance Test on Steam Jet Air Ejector Not Completed within 38 Days.Caused by Inadequate Training.Surveillance Testing Control Procedure Will Be Revised + (19:09:39, 12 December 2024)
- ML20128E966 + (19:09:40, 12 December 2024)
- ML20128E963 + (19:09:41, 12 December 2024)