ML20128F047
| ML20128F047 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 05/22/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20128F051 | List: |
| References | |
| NUDOCS 8505290546 | |
| Download: ML20128F047 (2) | |
See also: IR 05000298/1985015
Text
-
.
,
g,
.
MAY t W 1985
'
-In Reply Refer-To:
' Docket'.50-298/85-15
- Nebraska PublicIPower District-
=
ATTN: :J..M. Pflant, Manager, Technical
. Staff-Nuclear Power Group
- P. O. Box 499
Columbus, Nebraska ' 68601
,
" Gentlemen:
- This_-refers to:the: inspection conducted by Messrs. D. DuBois and J. Boardman
of this office during the period April 1-30, 1985,'of activities authorized by
NRC Operating License DPR-46 for Cooper Nuclear Station, and to the discussion
J
cof our findings with Mr. P. Thomason and other members of your staff at the
conclusion of-the; inspection.
Areas' examined during-the inspection included operational safety verification,
monthly surveillance and maintenance observations, and licensee action on
previous. inspection findings.
,
-Within these' areas, the inspection consisted of selective examination of
- procedures'and representative records, interviews with personnel, and
observations by the. inspectors. The findings are documented in the enclosed-
inspection report.
'
During this inspection, it was found that certain of your activities were-in.
. violation of NRC' requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions-of
~Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. 'Your response should be based on the specifics contained
.in the Notice of Violation enclosed with this letter.
~
'
The NRC Performance Appraisal Team (PAT) identified in NRC Report 50-298/84-21
numerous licensee failures to have procedures for the performance of
activities affecting quality. A significant concern is identified-in this
,
report relating to the lack of programmatic procedures for the control of
~ vendor technical information, including information directly associated with
,
reactor trip' systems.
In your response to the violations, specific _ detail of
your corrective actions for this area should be included.
We have also examined actions you have taken with regard to previous
inspection findings. The status of these items is identified ~in paragraph 2
of the enclosed report.
l
_
.F- I[
[A '
RPBJA
RPB1
'
'
uBo
Man
JBcedman
J[Jadon
EHJohnson
@
IS
(/Q/85
/}l/85
5 /p /85
\\
(,D
,
8505290546 850522
ADOCK 05000298
lt
G
,
p
- o
6
Nebraska-Public Power District
-2-
- The response directed by this letter and the accompanying Notice is not
-subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
Orignal signed By
E. H. johnson
E. H. Johnson, Chief
Reactor Project Branch 1
Enclosures:
1.
Appendix A
2.
Appendix B - NRC Inspection Report
50-298/85-15
cc w/ enclosures:
Paul V. Thomason, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB1
R. P. Denise, DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB1/A)
- D. Weiss, LFMB (AR-2015
- EP&RPB-
- J. Boardman, RP81/A
- MIS System
- RIV File
- RSTS Operator
- w/766