Final Deficiency Rept (55(e)-85-11) Re Damaged High Pressure Lube Oil Hose of Standby Diesel Generators Supplied by Cooper Energy Svcs.Initially Reported on 850329.Hose Line Redesigned.Mods Will Be Completed by 851031
ML20128E998
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/14/1985
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(55(E)-85-11), (NMP2L-0426), (NMP2L-426), NUDOCS 8507080082
Download: ML20128E998 (2)


Text

-

Y NIAGARA ffB0- //

NUMOHAWK NINE MILE POINT-UNIT 2'P.O. BOX 63, LYCOMING. NY 13093/ TELEPHONE (315) 343-2110 June 14,1985 (NMP2L0426)

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Comission Region I Division of Reactor Projects 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is a final report in accordance with 10CFR50.55(e) for the problem concerning the high-pressure lube oil hose of the diesel generators furnished by Cooper Energy Services.

This problem was reported by means of tel-con to J. Linville of your office on March 29, 1985.

An interim report was submitted on April 29, 1985.

Very truly yours, C. V. Mangan Vice President Nuclear Engineering and Licensing CVM/GG/cla (1049H) i xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gramm, NRC Senior Resident Inspector j

S

/

ax NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET NO. 50-410 Final Report for a Problem Concerning the High-Pressure Lube Oil Hose of the Diesel Generators (55(e)-85-11)

Description of the Problem The problem concerns the high-pressure lube oil hose of the standby diesel generators furnished by Cooper Energy Services.

During testing and inspection activities at the Nine Mile Point - Unit 2 site for the Division I standby diesel generator (2EGS*EG1), a damaged lube oil line was discovered.

A lube oil hose which feeds the timing chain tightener sprockets was observed to have approximately a 1/4-in. square hole worn into it.

A subsequent inspection of the Division II standby diesel generator (2EGS*EG3) indicated that the subject line in this diesel also was heavily abraded, but a hole was not visible.

Since neither of these engines had been run at the site prior to discovering this problem, the damage occurred during testing at the vendor's facilities.

The cause of the damage has been determined to be the loose attachment of a lube oil hose.

As a result the flexible hose contacted either or both the timing chain and crankshaft timing chain sprocket.

This may have occurred either due to vendor's incorrect installation of the hose or due to a design anomaly which caused the hose to move during engine operation.

Analysis of Safety Implications It is possible that the continued operation of these engines would have resulted in a

timing chain failure which could render the engines inoperative.

During a loss of offsite power, this could result in a loss of Division I and/or II emergency ac power and, had the condition gone uncorrected, the safe operation of the plant could have been adversely affected.

Corrective Action Cooper Energy Services is redesigning this lube oil hose line so as to mount Services will supply the parts necessary to it more rigidly.

Cooper Energy (2ESG*EG1 and 2EGS*EG3).

generators The modification to modify both diesel correct this problem will be completed by October 31, 1985.

_