Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128K376 + (18:30:56, 12 December 2024)
- ML20128K375 + (18:30:57, 12 December 2024)
- ML20128K373 + (18:30:58, 12 December 2024)
- PNO-III-85-058A, on 850716,confirmatory Action Ltr Issued Documenting Util Commitment to Restrict Power Level to 5%, Pending Completion of Evaluation of 850702 Inadvertent Criticality Incident.Investigation Continuing + (18:31:00, 12 December 2024)
- ML20128K370 + (18:31:01, 12 December 2024)
- ML20128K367 + (18:31:02, 12 December 2024)
- ML20128K366 + (18:31:03, 12 December 2024)
- ML20128K365 + (18:31:05, 12 December 2024)
- ML20128K364 + (18:31:06, 12 December 2024)
- ML20128K363 + (18:31:08, 12 December 2024)
- JSP-065-93, Application for Amend to License NPF-62,revising TS 3/4.3.4.2, EOC Recirculation Pump Trip Sys Instrumentation to Revise Frequency for Measuring Breaker Arc Suppression Time + (18:31:09, 12 December 2024)
- IR 05000416/1985018 + (18:31:11, 12 December 2024)
- ML20128K357 + (18:31:13, 12 December 2024)
- ML20128K356 + (18:31:15, 12 December 2024)
- ML20128K352 + (18:31:19, 12 December 2024)
- IR 05000321/1985007 + (18:31:20, 12 December 2024)
- ML20128K348 + (18:31:23, 12 December 2024)
- ML20128K347 + (18:31:26, 12 December 2024)
- ML20128K346 + (18:31:27, 12 December 2024)
- 05000333/LER-1996-008-01, :on 960906,HPCI Sys Declared Inoperable Due to Failed DC to AC Power Inverter.Failed C11 Capacitor Located in HPCI Inverter 23INV-79 Replaced + (18:31:31, 12 December 2024)
- ML20128K344 + (18:31:34, 12 December 2024)
- ML20128K343 + (18:31:36, 12 December 2024)
- ML20128K342 + (18:31:38, 12 December 2024)
- 05000423/LER-1996-001-02, :on 960120,supplementary Leak Collection & Release Sys Declared Inoperable Due to Equipment Failure of Door Latch.Door Repaired & Plant Returned to 100% Power + (18:31:42, 12 December 2024)
- ML20128K338 + (18:31:44, 12 December 2024)
- ML20128K337 + (18:31:45, 12 December 2024)
- ML20128K333 + (18:31:46, 12 December 2024)
- ML20128K332 + (18:31:48, 12 December 2024)
- ML20128K331 + (18:31:51, 12 December 2024)
- 1CAN078504, Forwards Change Notice 1 to Primary Reactor Containment Integrated Leak Rate Test,Final Rept. Errors Caused by Use of Different Computer Sys for Generation of Rept + (18:31:53, 12 December 2024)
- ML20128K323 + (18:31:59, 12 December 2024)
- ML20128K322 + (18:32:01, 12 December 2024)
- ML20128K321 + (18:32:03, 12 December 2024)
- JSP-064-93, Application for Amend to License NPF-62,revising TS 6.9.1.7, Semiannual Radioactive Effluent Release Rept to Bring TS in Compliance W/Amended 10CFR50.36a Requirements Which Change Submittal Frequency of Rept to Annually + (18:32:05, 12 December 2024)
- ML20128K318 + (18:32:07, 12 December 2024)
- NG-96-1687, Advises That Current Repair & Replacement Program Will Be Used for All Activities in RFO 14 to Avoid Confusion,Since DAEC Begins Third 10-yr Insp Interval on 961101 + (18:32:08, 12 December 2024)
- ML20128K312 + (18:32:13, 12 December 2024)
- ML20128K311 + (18:32:15, 12 December 2024)
- ML20128K310 + (18:32:16, 12 December 2024)
- ML20128K309 + (18:32:17, 12 December 2024)
- ML20128K305 + (18:32:20, 12 December 2024)
- ML20128K304 + (18:32:21, 12 December 2024)
- 05000295/LER-1993-002-01, :on 931114,discovered That Various Readings for SG & Pressurizer Pressure Channel Checks Not Completed on Previous Day.Caused by Personnel Error.Rounds Completed on 930114 + (18:32:25, 12 December 2024)
- ML20128K302 + (18:32:28, 12 December 2024)
- ML20128K298 + (18:32:30, 12 December 2024)
- ML20128K297 + (18:32:32, 12 December 2024)
- ML20128K295 + (18:32:34, 12 December 2024)
- ML20128K294 + (18:32:36, 12 December 2024)
- ML20128K293 + (18:32:38, 12 December 2024)
- ML20128K292 + (18:32:40, 12 December 2024)
- ML20128K291 + (18:32:42, 12 December 2024)