Proposed Tech Spec 6.9.1.7, Semiannual Radioactive Effluent Release Rept
ML20128K344
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/11/1993
From:
ILLINOIS POWER CO.
To:
Shared Package
ML20128K325 List:
References
NUDOCS 9302180140
Download: ML20128K344 (5)


Text

_ _ . _ _ _ _ _ _ _ _ _ _ ___ _ _ _ ___ _ . , __ _ _ _ _ _ - _ _ . __

At tachinent 3 to U-602096 Page 1 of 5 l INDEX , e u 9. n u I

AnMINISTRATIVE CONTROLS ~,.

SECTION PAGE l 1

i l

i REVIEW AND AUDIT (Continued) 1 Meeting frequency............................................ 6-10 1 Quorum.................. .................................... 6-11 1

Review....................................................... 6-11 Audits...................................................*.... 6-11 Authority.................................................... 6-13 Records..............................................'........ 6-13

6. 5. 3 TECH!llCAL REVIEW AND CONTROL.... ............................ 6-13 Activities...............................................,.... 6-13 6.6 REPORTABLE EVENT ACTION......... . ............................ 6-14 6.7 SAFE 1Y LIMIT VIOLATION......................................... 6-14 6.8 PROCEDURES AND PR0 GRAMS........................................ 6-15 6.8.1 PROCEDURES................................................... 6-15 6.8.2 REVIEW AND APPR0 VAL.......................................... 6-15 6.8.3 T EMPO RARY Ci t ANG E S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15 6.8.4 PP,0 GRAMS..................................................... 6-16 6.9 REPORTING REQUIREMENTS......................................... 6-17 6.9.1 ROUTINE REP 0RTS.............................................. 6-17 Startup Report...................................... ........ 6-17 Annual Reports............................................... 6-17 Annual Radiological Environmental Operating Report. . . . . . . . . . . 6-18 Li,kanu $ Radioactive Effluent Release Report............... 6-19 Monthly Operating Reports.................................... 6-21 Core Ope ra ti ng Limi ts Repo rt. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-21 l CLINTON - UNIT 1 xxy Amendment No. 28 9302180140 930211 PDR ADOCK 05000461 p PDR l

Attachment 3 to U-602096 Page 2 nf 5

, 13-92-021 DEflN!TIONS HEMBER(S) 0F THE PUBLIC (Continuedj persons who enter the site to service equipment or to.make deliveries. This category does include persons who use portions of the site for recreational, occupational or other purposes not associated with the plant.

MlHi, MUM CRITICAL POWER RATIO 4

1.25 The MINIMUM CRITICAL POWER RATIO (MCPR) shall be the smallest CPR which exists in the core.

OFFSITE OOSE CALCULATION MANUAL (00CjH 1.26 The OFFSITE 00SE CALCULATION MANUAL (0.0CM) shall contain the methodology and parameters used in the calculation of offsite doses resulting from radioactive gaseous and liquid effluents, in the calculation of gascous and li. quid ef fluent monitoring Alarm / Trip Setpoints, and in tne conduct of the Environmental Radiological Monitoring Program. The OOCH shall also contain (1) the Radioactive Effluent Controls and Radiological Environmental Monitoring Programs required by Section 6.8.4 and (2) descriptions of the information that should be included in the Annual Radiological Environmental

' Operating and 4ee4,wwa+Madioactive Effluent Release Reports required by l Specifications G.9.1.6 and 6.9.1.7. -

OPERABLE - OPERABILITY 1.27 A system, subsystem, train, component or device shall be OPERABLE or have OPERA 0!LITY when it is capable of performing its specified function (s) and when all necessiry attendant instrumentation, controls, electrical power, cooling or seal water, lubrication or other auxiliary equipment that are required for the system, subsystem, train, component or device to perform its function (s) are also capable of performing their related support function (s).

OPERATIONAL CONDITION - CONDITION

~

1.28 An OPERATIONAL CONDITION, i.e. , CONDITION, shall be any one inclusive com-bination of mode switch position and average reactor coolant temperature as specified in Table 1.2.

PHYSICS TESTS 1.29 PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation as 1) described in Chapter 14 of the FSAR, 2) as authorized under the provisions of 10 CFR 50.59, or 3) as othervise approved by the Commission.

PRESSURE BOUNDARY LEAXAGE 1.30 PRESSURE B0UNDARY LEAKAGE shall be leakage through a nonisolable fault in a reactor coolant system component body, pipe wall or vessel vall.

CLINTON - UNIT 1 1-5 Amendment No. 40

. Attachment 3 to U-602096

- Page 3 of 5

- LS-92-021 PLANT SYSTEMS 3/4.7.7 LIQUID _5TORAGE TANK 5*

LIMITING CONDIT10ri FOR OPERATION __

3.7.7 The quantity of radioactive material contained in each of the following l unprotected outdoor tanks shall be limited to less than or equal to 10 curies, excluding tritium and dissolved or entrained noble gases.

a. Cycled Condensate Storage Tank l
b. RCIC Storage Tank
c. Outside temporary tank APPLICABILITY,: At all times.

ACTION:

a. With-the quantity of radioactive material in any of the above listed tanks excceding the above limit, immediately suspend all additions of radioacti c material to the tank, within 48 hou's r reduce the tank contents to within the limit, and describe the events leading to this condition in the next

& 'r - Radioactive Effluent Release Report.

b. The provisions of Specifications 3.0.3 and 3.0.4 are not appilcable.

SURVEILLANCE REQUIREHENTS _

4.7.7 The quantity of radioactive material contained in each of the above I listed tanks shall be determined to be within the above limit by analyzing a representative sample of the tank's contents at least once per 7 -days when radioactive materials are beino added to the tank.

    • Tanks included in this sp,ect fication are those outdoor tanks that are not surrounded by liners, dikes, or walls capable of holding the tank contents and that do not have tank overflows and surrounding area drains connected to the 1Iquid radwaste treatment system.

CLINTON - UNIT 1 3/4 7-18 Amendment No. 40 ]

Attachment 3 to U-602096 Page 4 of 5 LS-92-021 ADMIi4ISTRATIVE CONTROLS ,

SC" ." cA$ RADIOACTIVE EFFLUENT RELEASE REPORT J2

6. 9.1. 7 The R :!'- uMtRadioactive Effluent telease Report covering the operation of the uni Auring the previous / ,onths of operation shall be submitted within days af ter January 1 u-d July itof each year. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid was'e released from the unit. The material provided shall be (1) consistent with he objectives outilned in the OOCH and PCP and (2) in conformance with 10 CFF $0.3Ga and Section IV.B.1 of Appendix ! to 10 CFR Part 50.

10 o

I CLINTON - UNIT 1 6-19 Amenda.ent No. 40

- =

l umme mu ims iisiu q

Attachment 3 to U-602096 Page 5 of 5 LS-92-021 ADMINISTRATIVE CONTROLS 6.14 0FFSITE DOSE CALCULATION MANUAL (00Cdl Changes to the ODCH:

a. Shall be documented and records of reviews performed shall Le retained as required by Specification 6.10.3.n. This documeatation shall contain:
1. Sufficient information to support the change together with the appropriate analyses or evaluations justifying the change (s), and
2. A determination that the change will maintain the' level of radioactive effluent control required by 10 CFH 20.106, 40 CFR Part 190, 10 CFR 50.36a, and Appendix ! to 10 CFR Part 50 and not adversely 16 pact the accuracy or reliability of effluent, dose, or setpoint calculations,
b. Shall become effective af ten review and acceptance by the FRG and the approval of the Manager - Clinton Power Station.
c. Shall be submitted to the Commission in the-form of a complete, legible co 5 :!:nnt:,pyRadiosctive of the entireEffluent 00CH as a partReport Release of or concurrent for the period withofthe the report in which any change to the 00CM was made. Each change shall be identified by markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (e.g., month / year) the change was implemented.

I' l

CLINTON - UNIT 1 6-25 Amendment No.40