ML20128K292
| ML20128K292 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 01/31/1993 |
| From: | Maynard O, Mike Williams WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| WO-93-0026, WO-93-26, NUDOCS 9302180130 | |
| Download: ML20128K292 (7) | |
Text
O t
~
W$LF CREEK NUCLEAR OPERATING CORPORATION
' Otto'L Maynard Vice Presetjent Piar.t Operatons February 10, 1993 WO 93-0026 17 S. Nuclear Regulatory Commission ATTN Document-Control Desk Mail Station F1-137 Washington, D. C. 20555 Subject Docket No. 50-482:
January, 1993, Monthly Operating Report Gentlemen:
Attached is the January, 1993 Monthly Operating Report for Wolf Creek Generating. Station.
This submittal is being nede in accordance with the requirements of Technical Sp?cification 6.9.1.8.
Very truly yours, 7
/
/ 84/
Otto L. Maynard Vice President Plant Operations OLM/jad Attachment cci J. L. Milhoan (NRC), w/a G. A. Pick (NRC), w/a W. D. Reckley (NRC), w/a T. F. Stetka (NRC), w/a l h b> O E. S, i
~
1 j
u 4
9302180130 930131' 7 aox 4 t / Burtingtm KS 66839 / Phone: (316) 364-8831
/* -
- DR ADOCK 0500 2
3, g,
. c L
i Attachment to VO 93-0026 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT
.. i MONTH:
January YEAR:
1993 Docket No.:
50-482 Facility Operating License No.:
NPF-42 Report No.
95 Prepared by:
Merlin G. Williams
___ --___ _____- ___---___-___-_--__-_- -_- __-___ - - _-_= _ _ -
Y.
Attachment.to WO 93-0026 s
SUMMARY
The following report highlights the operating experience.of Wolf-Creek-Generating Station for the month of January, 1993.
This report is being provided pursuant to Technical-Specification 6.9.1.8.
-I.
SUMMARY
OF OPERATING EXPERIENCE
~
The unit operated ' at or near 100 percent power throught the month of 7-
- January, y
- i II.
MAJOR SAFETY RELATED HAINTENANCE ACTIVITIES No major safety related maintenahce activities were performed during the; month of January.
b a
b 5
d I
~
- Wolf Creek Ger.erating Station Monthly. Operating; Report-January,1993 Page 1-of:5 y 4-)g y
gg--
tv g
r-i-rr v
ver'nv9 m
e e-W
At achment to WO 93 0026 OPERATING DATA REPORT DOCKE" D.
50-482 WOLF CREEK GENE. t'ING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 02-01-93 COMPLETED BY M. Williams TELEPHONE 316-364-8831 OPERATING STATUS 1.
keporting Period:
January. 1993 Gross Hours in Reporting Period:
744 2.
Carrently Authorized Power Level (MWt): 3411 Max. Depend. Capacity (MWe-Net): 1131 Design Electrical Rating (MWe-Net):
1170
~
3.
Power Level to Which Restricted (If Any)(MWe-Net):
N/A 4.
Reasons for restriction (If Any):
N/A This Month Yr. to Date Cumulative 5.
Number of Hours Reactor was Critical 744.0 744.0 52.046,5 6.
Reactor Reserve Shutdown Hours 0.0 06 339.8 7.
hours Generator on Line 744.0 744.0 51.395.8 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross Thermal Energy Generated (MWH) 2.534.643 2.534.643 168.063.778 10.
Gross Electrical Energy Generated (MWH) 887.072 887.072 58.479.689 11.
Net Electrical Energy Generated (MWH) 853.725 853.725 55.799.854 12.
Reactor Service Factor 100.0__
100.0 80.1 13.
Reactor Availability Factor 100.0 100.0 80.6
'14.
Unit Service Factor 100.0 100.0 79.1 15.
Unit Availability Factor 100.0 100.0 79.1 16.
Unit Capacity Factor (Using MDC) 101.5 101.5 75.9
-17.
Unit Capacity Factor (Using Design MWe) 98.1 98.1 73.4 18.
Unit Forced Outage Rate 0.0 0.0 6.3 19.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): Refueling Outage on March 4, 1993 for 60 days.
20.
If Shut Down at End of Report Period, Estimated Date of Startup:
N/A Wolf Creek Generating Station Monthly Operating Report January 1993 Page 2 of 5
Attachment to WO 93-0026 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-482.
WOLF CREEK GCNERATING STATION WOL" CREEK NUCLEAR OPERATING CORPORATION DATE 02-01-93 COMPLETED BY M. Williams TELEPHONE 316-364-8831 MONTH January. 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POVER LEVEL (MWe-Net)
(MWe-Net) 1 1148 17 1149 2
1148 18 1148 3
1148 19 1148 4
1147 20 1148 5
1148 21 1149 6
1149 22 1150 7
1199 23 1149 8
1148 24 1146 9
1148 25 1139 10 1148 26 1148 11 1148 27 1143 12 1145 28 1148 13 1147 29 1148 14 1146 30 1146 15 1143 31 1149 16 1149 Wolf Creek Generating Station Monthly Operating Report January 1993 Page 3 of 5
. Attachment.to WO 93-0026 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.
50-482 WOLF CREEK GENERATING STATION' WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 02-01-93 COMPLETED BY M. Williams REPORT MONTH-Januarv. 1993 TELEPHONE 316-364r8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS /C0fMENTS No Date S: SCHEDULED _
(HOURS)__ j l)
OR REDUCING POWER (2)
SUMMARY
- The unit operated at or near 100 percent pcwer throughout the month of January.
- 1) REASON: A:
EQUIPMENT FAILURE (EXPLAIN)' F: ADMINISTRATIVE 2.
MANUAL SCRAM E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
.1.
MANUAL B: MAINTENANCE OR TEST C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3.
REGULATORY RESTRICTION H: OTHER (EXPLAIN) ie. CONTINUED 5.
' REDUCED LOAD 9.
OTHER i
Wolf Creek Generating Station
. Monthly Operating Report January 1993 Page 4 of 5
~
~
n.
M hl.
ii. Attachmedt to WO 93-0026
~
s WOLF CREEK NUCLEAR OPERATING CORP 0 RATION WOLF CREEK GENERATING STATION
' UNIT NO.
1.-
MONTH January. 1993 SUltiARY OF OPERATING EXPERIENCE s c Listed.below in -chronological sequence 'is a sumary of operating experiences for this month '
. which required load reductionor resulted in significant'non-load related incidents.
DATE:
TIME
' EVENT-January 1, 1993 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100 percent power.
January 31,~ 1993 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br />
. Unit at 100, percent power.
a c.
t i
Wolf Creek Generating Station
. Monthly Operating Report, January 1993
.Page 5 ofL5
~.
-