Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132C536 + (15:12:11, 12 December 2024)
- ML20132C535 + (15:12:12, 12 December 2024)
- RBG-21-585, Forwards Response to Generic Ltr 85-07, Implementation of Integrated Schedules for Plant Mods. Unlicensed Approach Warranted at Present Since Process for Developing Integrated Living Schedule Program in Developmental Phase + (15:12:12, 12 December 2024)
- ML20132C532 + (15:12:14, 12 December 2024)
- ML20132C528 + (15:12:14, 12 December 2024)
- ML20132C524 + (15:12:15, 12 December 2024)
- ML20132C523 + (15:12:16, 12 December 2024)
- ML20132C518 + (15:12:17, 12 December 2024)
- ML20132C519 + (15:12:17, 12 December 2024)
- IR 05000530/1985009 + (15:12:18, 12 December 2024)
- ML20132C516 + (15:12:19, 12 December 2024)
- ML20132C514 + (15:12:19, 12 December 2024)
- ML20132C513 + (15:12:20, 12 December 2024)
- ML20132C512 + (15:12:21, 12 December 2024)
- PNO-V-85-048, on 850724,licensee Determined That Plant Outage of Greater than 7 Days Expected to Repair Main Condenser. Caused by Damage to Two Condenser Tubes & Heater Drain Tank Inlet Shroud Due to Broken Condenser Baffle + (15:12:21, 12 December 2024)
- ML20132C507 + (15:12:22, 12 December 2024)
- ML20132C510 + (15:12:22, 12 December 2024)
- ML20132C505 + (15:12:23, 12 December 2024)
- PNO-V-85-062A, on 850919,reactor Trip Involving Inoperable Turbine Driven Auxiliary Feedwater Pump & Main Turbine Overspeed Occurred.Caused by Inadequate Lubrication of Bearing.Event Still Under Investigation + (15:12:23, 12 December 2024)
- ML20132C504 + (15:12:24, 12 December 2024)
- ML20132C503 + (15:12:25, 12 December 2024)
- 05000219/LER-1996-012, :on 961112,racked Out Breakers in 4160 Volt Ac Switchgear Did Not Meet Seismic Design Bases.Caused Because Previous Seismic Qualification Walkdowns Failed to Identify Problem.Tie Breakers Were Removed from Cubicle + (15:12:27, 12 December 2024)
- ML20132C500 + (15:12:28, 12 December 2024)
- ML20132C499 + (15:12:28, 12 December 2024)
- ML20132C498 + (15:12:29, 12 December 2024)
- ML20132C497 + (15:12:30, 12 December 2024)
- IR 05000346/1984019 + (15:12:55, 12 December 2024)
- ML20132C494 + (15:12:56, 12 December 2024)
- ML20132C492 + (15:12:57, 12 December 2024)
- ML20132C493 + (15:12:57, 12 December 2024)
- ML20132C491 + (15:12:58, 12 December 2024)
- ML20132C484 + (15:12:59, 12 December 2024)
- ML20132C487 + (15:12:59, 12 December 2024)
- ML20132C482 + (15:13:00, 12 December 2024)
- ML20132C481 + (15:13:01, 12 December 2024)
- ML20132C479 + (15:13:02, 12 December 2024)
- LD-96-060, Forwards Rev to Sys 80+ Std Plant Design Control Document + (15:13:03, 12 December 2024)
- ML20132C477 + (15:13:04, 12 December 2024)
- ML20132C475 + (15:13:04, 12 December 2024)
- ML20132C474 + (15:13:05, 12 December 2024)
- ML20132C471 + (15:13:06, 12 December 2024)
- ML20132C468 + (15:13:07, 12 December 2024)
- ML20132C467 + (15:13:07, 12 December 2024)
- ML20132C465 + (15:13:08, 12 December 2024)
- 0CAN129602, Responds to NRC Re Violations Noted in Insp Repts 50-313/96-06 & 50-368/96-06.Corrective Actions:Service Air Was Secured Immediately Upon Identification as Cause of RCS Level Increase + (15:13:09, 12 December 2024)
- ML20132C464 + (15:13:09, 12 December 2024)
- ML20132C459 + (15:13:10, 12 December 2024)
- ML20132C457 + (15:13:11, 12 December 2024)
- ML20132C456 + (15:13:12, 12 December 2024)
- ML20132C453 + (15:13:13, 12 December 2024)
- ML20132C454 + (15:13:13, 12 December 2024)