ML20132C503
| ML20132C503 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 09/19/1985 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| PY-CEI-OIE-0119, PY-CEI-OIE-119, NUDOCS 8509270073 | |
| Download: ML20132C503 (2) | |
Text
/ THE CLEVELAND ELECTRIC ILLUMIN ATING COMP ANY P.O. BOX 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG.
- 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT September 19, 1985 WUCLE A R PY-CEI/OIE-0119 L Mr. C. J. Paperiello, Director Division of Reactor Safety U.S. Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
/
RE:
Perry Nuclear P,6wer Plant Docket No. 50-5Sf; 50-441 Noncompliance 440/85043-01, Example (a)
REF: PY-CEI/OIE 0102L--August 20, 1985 PY-CEI/OIE-0094L--August 9, 1985
Dear Mr. Paperiello:
The purpose of this letter is to advise you of additional infor-mation for your files to support closure of Noncompliance 440/85043-01, example (a).
Subsequent to our second response, L.
K. Comstock Inspection Report 19141 and L. K. Comstock Nonconformance Report 6443 were initiated to document further review of weld filler metal withdrawal tabs.
Nonconformance Report 6443 has been closed based on revision to L. K. Comstock Procedures 4.7.1 and 4.8.18, and acceptable tensile tests of coupons welded with 6013 electrodes.
Mr. John Jacobson reviewed corrective actions taken in response to this noncompliance during his inspection conducted from September 10 to 12, 1985.
Preliminary results presented at his exit meeting indicate that this item is considered closed.
If there are any questions, please do not hesitate to call.
Sincerely, ti
[
d Murray Edelman Vice President Nuclear Group MRE:sab Attachment gO ggp g,3 $6 k
=
O G
N!'bO /
0
~~
Mr. C. J.
Paperiello September 19, 1985 PY-CEI/OIE 0119 L cc:
Mr. J. A. Grobe USNRC Site, SBB50 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Mr. R.
F. Warnick, Chief Reactor Projects Branch 1 Division of Reactor Projects U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137