Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B11713, Forwards Results of Revised Instrument Uncertainty Analysis in Response to Question 492.7 Re RCS Flow Measurement Capability,Per 850910 Telcon.Ser Open Item 8 Considered Closed + (14:04:49, 12 December 2024)
- ML20133B668 + (14:04:50, 12 December 2024)
- ML20133B670 + (14:04:50, 12 December 2024)
- ML20133B667 + (14:04:51, 12 December 2024)
- ML20133B665 + (14:04:52, 12 December 2024)
- ML20133B662 + (14:04:53, 12 December 2024)
- PNO-V-85-065, on 850920,State of Wa Inspector Discovered Drum Containing 19.8008 Mci Sr-90,exceeding Marked Class a Limitations.Caused by Incorrect Classification.Licensee Banned from Use of Burial Site + (14:04:54, 12 December 2024)
- ML20133B660 + (14:04:55, 12 December 2024)
- ML20133B659 + (14:04:56, 12 December 2024)
- ML20133B656 + (14:04:57, 12 December 2024)
- ML20133B654 + (14:04:58, 12 December 2024)
- ML20133B651 + (14:04:58, 12 December 2024)
- ML20133B650 + (14:04:59, 12 December 2024)
- ML20133B648 + (14:05:03, 12 December 2024)
- ML20133B647 + (14:05:03, 12 December 2024)
- B16082, Discontinues Payment of Annual Fees as Outlined in 10CFR171.15 for Plant,Effective 970101 + (14:05:04, 12 December 2024)
- ML20133B642 + (14:05:05, 12 December 2024)
- ML20133B644 + (14:05:05, 12 December 2024)
- ML20133B641 + (14:05:06, 12 December 2024)
- ML20133B637 + (14:05:06, 12 December 2024)
- ML20133B636 + (14:05:07, 12 December 2024)
- ML20133B633 + (14:05:08, 12 December 2024)
- ML20133B635 + (14:05:08, 12 December 2024)
- ML20133B630 + (14:05:09, 12 December 2024)
- 05000293/LER-1985-025, :on 850901,reactor Scram Occurred When Insulator in Switchyard Arced to Ground & Disintegrated. Caused by Salt Buildup Resulting from Storm.Insulator Replaced & Washdown Procedures Reviewed + (14:05:12, 12 December 2024)
- SNRC-1199, Forwards Rev 5 to Local Offsite Radiological Emergency Response Plan,Including Procedures,App a & App B Agreement Ltrs.Requests FEMA Review Rev 5,per NRC-FEMA MOU + (14:05:13, 12 December 2024)
- PNO-IV-97-001, on 970102,notice Was Received Re Accumulated whole-body Exposure to Radiographer Assistant Which Exceeded Annual Limit of 5,000 Mrem During CY96.Cause of Exposure Unknown.Associated Safety Equipment Was Inspected + (14:05:14, 12 December 2024)
- ML20133B623 + (14:05:15, 12 December 2024)
- ML20133B622 + (14:05:16, 12 December 2024)
- IR 05000530/2007001 + (14:05:19, 12 December 2024)
- 05000293/LER-1985-026, :on 850830,during QA Audit of Operations, Failure to Perform Instrument Check of 28-volt Control Rod Position Indicating Lights Indicated.Caused by Inadequate Surveillance Procedure.Procedure Modified + (14:05:21, 12 December 2024)
- ML20133B619 + (14:05:22, 12 December 2024)
- ML20133B616 + (14:05:23, 12 December 2024)
- ML20133B615 + (14:05:24, 12 December 2024)
- ML20133B614 + (14:05:25, 12 December 2024)
- 05000528/LER-1985-065, :on 850829,moisture Buildup in Sample Line from Gaseous Radwaste Surge Tank to Associated Sample Point Prevented Sampling of Tank.Caused by Design Problem.Design Mod Will Be Installed + (14:05:27, 12 December 2024)
- ML20133B611 + (14:05:28, 12 December 2024)
- ML20133B610 + (14:05:29, 12 December 2024)
- ML20133B606 + (14:05:29, 12 December 2024)
- AECM-84-0192, Clarifies Response to Question Written in Transcript of Commission 840320 Briefing Re Development of Tech Specs. Util Comparing Tech Specs to Fsar,Ser & Present Version of STS + (14:05:31, 12 December 2024)
- ML20133B602 + (14:05:32, 12 December 2024)
- ML20133B598 + (14:05:33, 12 December 2024)
- ML20133B595 + (14:05:34, 12 December 2024)
- ML20133B593 + (14:05:34, 12 December 2024)
- ML20133B592 + (14:05:35, 12 December 2024)
- ML20133B585 + (14:05:41, 12 December 2024)
- ML20133B584 + (14:05:42, 12 December 2024)
- 05000482/LER-1985-064, :on 850902,reactor Trip,Turbine Trip,Steam Generator Blowdown & Sample Isolation,Feedwater Isolation & Auxiliary Feedwater Actuation Occurred as Result of lo-lo Water Level in Steam Generator 2 + (14:05:48, 12 December 2024)
- ML20133B580 + (14:05:49, 12 December 2024)
- ML20133B579 + (14:05:50, 12 December 2024)
- ML20133B575 + (14:05:53, 12 December 2024)