Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134M096 + (08:43:21, 12 December 2024)
- ML20134M093 + (08:43:22, 12 December 2024)
- ML20134M092 + (08:43:23, 12 December 2024)
- ML20134M090 + (08:43:23, 12 December 2024)
- B16221, Provides Addl Info Re TS Restrictions on Load Movement Over Spent Fuel Assemblies & Design Basis for Load Drops & Activity Releases in SFP Per + (08:43:24, 12 December 2024)
- ML20134M087 + (08:43:25, 12 December 2024)
- ML20134M085 + (08:43:26, 12 December 2024)
- ML20134M086 + (08:43:26, 12 December 2024)
- ML20134M084 + (08:43:27, 12 December 2024)
- ML20134M083 + (08:43:28, 12 December 2024)
- ML20134M082 + (08:43:29, 12 December 2024)
- 05000267/LER-1985-012, :on 850724,automatic Scram & Loop 2 Shutdown Initiated by Plant Protective Sys Due to High Moisture Levels in Primary Coolant.Caused by Inadvertent Bearing Water Upsets to Establish Backup Water Seal + (08:43:32, 12 December 2024)
- ML20134M077 + (08:43:34, 12 December 2024)
- ML20134M076 + (08:43:34, 12 December 2024)
- LR-N966376, Monthly Operating Rept for Oct 1996 for Hope Creek Generation Station Unit 1 + (08:43:35, 12 December 2024)
- 1CAN029701, Informs That Listed Individuals No Longer Have Need to Maintain Operating License,Iaw 10CFR50.74 & Requests That Licenses for Individuals Be Withdrawn + (08:43:36, 12 December 2024)
- ML20134M074 + (08:43:36, 12 December 2024)
- ML20134M069 + (08:43:37, 12 December 2024)
- 0CAN119608, Forwards Errata Sheet for Relief Requests for non-code Repair of Service Water Piping & Generic Relief + (08:43:38, 12 December 2024)
- ML20134M068 + (08:43:38, 12 December 2024)
- ML20134M066 + (08:43:39, 12 December 2024)
- ML20134M064 + (08:43:40, 12 December 2024)
- ML20134M065 + (08:43:40, 12 December 2024)
- ML20134M063 + (08:43:41, 12 December 2024)
- ML20134M062 + (08:43:42, 12 December 2024)
- 05000213/LER-1985-019, :on 850726,ex-core Nuclear Instrumentation Power Range Channel 33 Spiked,Causing Actuation of Dropped Rod Load Runback Circuit.Caused by Failure of Gain Adjustment Potentiometer + (08:43:43, 12 December 2024)
- 05000341/LER-1996-008, :on 951213,one Megawatt Thermal Nonconservative Bias Found in Core Thermal Power Calculation.Caused by Heat Pump Seal Purge Flow Being Considered Insignificant During Original Heat Balance & Thermal Power Calculation + (08:43:46, 12 December 2024)
- ML20134M058 + (08:43:47, 12 December 2024)
- ML20134M057 + (08:43:47, 12 December 2024)
- ML20134M055 + (08:43:48, 12 December 2024)
- ML20134M053 + (08:43:49, 12 December 2024)
- U-600240, Interim Potential Deficiency Rept 55-85-05 Re Inadequate Design Change Control by Zack Co.Sargent & Lundy,Inc Requires Addl Time to Perform Safety Significance Evaluation.Final Rept Will Be Submitted in Approx 30 Days + (08:43:49, 12 December 2024)
- ML20134M052 + (08:43:50, 12 December 2024)
- ML20134M051 + (08:43:51, 12 December 2024)
- ML20134M050 + (08:43:51, 12 December 2024)
- ML20134M048 + (08:43:52, 12 December 2024)
- RBG-43394, Monthly Operating Rept for Oct 1996 for River Bend Station Unit 1 + (08:43:53, 12 December 2024)
- 2CAN029709, Submits follow-up Info Re TS Bases,Enabling on-line Testing of Selected Snubbers + (08:43:54, 12 December 2024)
- ML20134M044 + (08:43:58, 12 December 2024)
- ML20134M043 + (08:43:58, 12 December 2024)
- ML20134M041 + (08:43:59, 12 December 2024)
- 05000341/LER-1995-008, Provides Commitment Made Re Suppl to LER 95-008 Concerning Nonconservative Bias in Heat Balance Methodology for Calculating Core Thermal Power + (08:44:00, 12 December 2024)
- ML20134M038 + (08:44:00, 12 December 2024)
- 2CAN029701, Responds to RAI Re TS Change on Extension of PPS Surveillance Test Interval to 123 Days + (08:44:01, 12 December 2024)
- ML20134M036 + (08:44:02, 12 December 2024)
- ML20134M034 + (08:44:02, 12 December 2024)
- ML20134M033 + (08:44:03, 12 December 2024)
- BSEP-97-0039, Responds to RAI Re Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over SR Equipment + (08:44:04, 12 December 2024)
- ML20134M030 + (08:44:05, 12 December 2024)
- ML20134M027 + (08:44:06, 12 December 2024)
- NRC-96-0116, Submits 10-day Followup Rept Describing Results of Confirmatory Test & Insp Items,As Well as Closeout Summary for Util Response to NRC Bulletin 95-002 + (08:44:06, 12 December 2024)