Text
...
8 Entergy OperCtions,Inc.
. O PO Box 756 Port Gibson. MS 3915o 8
Tel 601437 6408 Fax 601437 279s Joseph J. Hagan Vice President Operatior's November 13, 1996 crane ouir r4uciear station i
l U.S. Nuclear Regulatory Commission Mall Station P1-137 Washington, D.C. 20555 Attention:
Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report l
GNRO-96/00124 Gentlemen:
In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for October 1996.
If you have any questions or require additional information, please contact this office.
Yours truly,
^
JJH/CWG attachments:
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdown and Power Reductions cc:
(See Next Page) l 9611220194 961031 gDR ADOCK 05000416 PDR 220043
.-~._. _
November 13, 1996 GNRO-96/00124 i
Page 2 of 3 i
cc:
Mr. D. C. Hintz (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. J. E. Tedrow (w/a)
Mr. H. L. Thomas (w/o)
Mr. Leonard J. Callan (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission
' Region IV 611 Ryan Plaza Drive Suite 400 i
Arlington, TX 76011
)
Mr. Jack Donohew, Project Manager Office of Nuclear Reactor Regulation i
U.S. Nuclear Regulatory Cornmission Mail Stop 13H3 Washington, D.C. 20555 l
l
{
i i
L i
- to GNRO-96/00124 DOCKET NO 50-416 DATE
.11/05/96 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 2.
Reporting Period: October 1996 3.
Licensed Thermal Power (MWt): 3833 MWT 4.
Nameplate Rating (Gross MWe): 1372.5 MWE 5.
Design Electrical Rating (Net MWe): 1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1228 MWE 7.
Maximum Dependable Capacity (Net MWe):
1179 MWE 8.
If changes occur in Capacity Ratings (items 3 through 7) Since Last Report. Give Reason:
9.
Power Level To Which Restricted, if Any (Net MWe):
N/A
- 10. Reasons For Restrictions, if Any:
N/A This Month Yr to Date Cumulative
- 11. Hours in Reporting Period 745 7,320 105,496
- 12. Number of Hours Reactor was Critical 456.0 6,979.2 87,170.2
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 456.0 6,957.9 84,136.4
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1,669,280 26,335,106 300,568,638
- 17. Gross Electrical Energy Generated (MWH) 548,381 8,741,228 96,410,419
- 18. Net Electrical Energy Generated (MWH) 526.895 8,397,319
_9_2,396,964 l
- 19. Unit Service Factor 61.2 95.1 81.6
- 20. Unit Availability Factor 61.2 95.1 81.6
- 21. Unit Capacity Factor (Using MDC Net) 60.0 97.7 79.9
- 22. Unit Capacity Factor (Using DER Net) 56.6 91.8 72.9
- 23. Unit Forced Outage Rate 0.0 1.0 6.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End of Report Period. Estimated Date of Startup: 11/21/96 @ 0000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br />.
j
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 a-4+
e s
, to GNRO-96/00124 DOCKET NO 50-416 DATE 11/05/96 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 MONTH October 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1131 17 1215 2
1209 18 790 3
1214 19 413 4
1221 20 0
5 1226 21 0
6 1230 22 0
7 1228 23 0
8 1228 24 0
9 1232 25 0
10 1232 26 0
i 11 1239 27 0
12-1238 28 0
13 1221 29 0
14 1231 30 0
q l
15 1230 31 0
'16 1226 j
l
E e
- to GNRO-96/00124 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-416 UNIT NAME GGNS Unit I DATE I1/06/96 COMPLETED BY S.D.Lin TELEPHONE (6011437-6793 REPORT MONTH October 19%
No.
Date Type (1)
Duration Reason Method Of Licensee System Code Component Cause & Correctist Action To Hours (2)
Shutting Event Report #
(4)
Code Present Recurrence (CACA)
Down Reactor (5)
(3) 964)02 10/20/96 S
289.0 C
2 N/A N/A N/A Reactor shut down for Refueling Outage No. 8.
1 2
3 4
5 F: Forced Reason Method:
Exhibit G - Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Esent B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction Continued E-Operator Training &
5-Reduced load Licensing Examination 6-Other F-Administratist G-Operational Error (Explain)
H-Other (Explain)
-