1996 Annual Environ Operating Rept for Byron Generating Station
ML20134M090
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/05/1997
From: Kofron K
COMMONWEALTH EDISON CO.
To: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
BYRON-97-0026, BYRON-97-26, NUDOCS 9702200086
Download: ML20134M090 (2)


Text

Cninmonucalth Eden Compan) i 11)run Gener :mu Nation 4 450 North Gernun Church Road

. . ..g fly ron. IL 61010 9 94 Tel M14144 a 41 1

February 5,1997 i

l l

l LTR: BYRON 97-0026 FILE: 2.7.300 Mr. A. B. Beach Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351

SUBJECT:

Annual Environmental Operating Report for Facility Licenses NPF-37 and 66

Dear Mr. Miller:

Byron is submitting the Annual Environmental Operating Report as required by the Operating License, Appendix B, Section 5.4 for Facility Licenses NPF-37 and 66. The period of the report is from January 1,1996 to December 31,199'i 0

The report was reviewed against the objectives of the Environmente: Preta~ ion Plan as stated in Section 1.0, Appendix B to the Operating License, and it has been determined that these objectives are being met.

There were no noncompliances to the Environmental Protection Plan; therefore, no corrective actions were required by Appendix B, Section 5.4,1(1). There were no changes in station design operation, or tests and experiments which involved a potentially significant unreviewed environmental question as defined in Section 3.1. Comed plans to install a floating ice / debris boom in the Rock River at the intake. The modification was reviewed by several agencies, and the Army Corps of Engineers issued a permit in November 1996 to -

install the boom. There were no non-routine reports submitted per Section 5.4.2.

Commonwealth Edison received no noise complaints during 1996. The aerial photographic monitoring program, described in Section 4.2.1 was completed in 1993. The confirmatory sound survey requirements, described in Section 4.2.2.a., were completed in 1988.

l 1

006 97 agog ~ c'

& 2 HOCK 0500o4g4 U l

R PDR

[U JO-(p:\97byltrs\970026.wpfiO20597)

A l~nicom (ump.in)

_ .._ _ . _ . . . . ...__. _ ____ _ . _ ._ _.._ __ _ _ ..... -.._.-.._.. _ _ ._._ _ ...~ _.. _

J

. 7-- ..

i

BYRON 97-0026  :

Page 2 February 5,1997  ;

i I

.i 4

l In accordance with Regulatory Guide 10.1, one copy of this report is provided for

  • 1- your use and 18 copies are being submitted directly to the Document Control Desk, U.S.

l Nuclear Regulatory Commission, Washington, D.C. 20555.

I i.f Sincerely, 4

f

, L, , - 4 4 K. L. Kofron

i. Station Manager i Byron Nuclear Power Station i Attachments KLK/LAL/rp ,

i

,{ '

cc: NRC Resident inspector

! Accument Control Desk (18 copies)

, Site Nuclear Licensing Administrator i

4 Environmental Services a i

i I I 1 l'

i i

l i

l l

I l

i I

(p:\97byttrs\970026.wpfiO20597) 1 I