Text
.
~.
. ~.. -
d Beaver Valley Power Stat 6on a.
Shippingport, PA 15077 0004 1
.i SUSHIL C.JAIN (412) 393-5512 DMalon Vice President Fax (412) 643 8069 N PowY$# vision February 10, 1997 4
U. S. Nuclear Regulatory Commission
/ Attention: Document Control Desk Washington, DC 20555-0001
)
l
Subject:
Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Revised Reactor Vessel Capsule Withdrawal Schedule WCAP-14484, " Analysis of Capsule V from the Duquesne Light Company Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program," was provided by letter dated March 27, 1996, in accordance with 10 CFR 50 Appendix H, Section III. In i
addition, NRC approval was requested for changes to UFSAR Table 5.3-6 in accordance with the WCAP which provided the basis for updated capsule lead factors, withdrawal schedules and fluence values. Pursuant to the Commission's decision in CLI 96-13 (December 6,1996) concerning the Atomic Safety and Licensing Board Memorandum d
and Order (LBP-95-17), this letter documents the reaffirmation of our request for NRC approval to implement these changes as required in accordance with 10 CFR 50 Appendix H, Section III.B.3.
Sincerely, i