ML20134M034

From kanterella
Jump to navigation Jump to search
Provides Suppl Info Updating Intent Re Bulletin 96-003 & Related Mods During RFO 11
ML20134M034
Person / Time
Site: Pilgrim
Issue date: 02/07/1997
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2.97-012, 2.97-12, IEB-96-003, IEB-96-3, NUDOCS 9702200068
Download: ML20134M034 (2)


Text

. -.. -

g i

g Boston Edieon Pilgrirn Nucleas Power Station Rocky Hill Road Plymouth Massachusetts 02360 E. T. Boulette, PhD February 7, 199F Senior Vice President - Nuclear BECo Ltr. #2.97- 012 U.S. Nuclear Regulatory Commission

' Attention: Document Control Desk Washington D.C. 20555 j

Docket No. 50-293 License No. DPR-35

Subject:

Additional information Renardina Pump Suction Strainer installation at Pilarim Station

Reference:

Beco Ltr. # 2.96.092 Response to NRC Bulletin 96-03, dated November 1,1996 In the referenced letter, Boston Edison addressed strainer clogging issues associated with NRC Bulletin 96-03 as it relates to Pilgrim Station's emergency core cooling system (ECCS) pump.

suction strainers. That letter outlined our plan to install larger strainers during refueling outage (RFO#11).

This letter provides supplementary information updating our intent regarding NRC Bulletin 96-03 and related modifications during RFO#11 (February 1997).

Pilgrim Station will install new ECCS suction strainers in RFO#11 to increase design margin relative to our existing licensing basis for debris generation (reference Reg. Guide 1.82 Rev.1).

The new strainers will be installed per our design change process under 10CFR50.59 since the modification represents a design change improvement within our current licensing basis.

f This modification may represent Pilgrim Station's final resolution of Bulletin 96-03, but this cannot be determined until the Utility Resolution Guidance (URG) is formally approved by the NRC. We will address final resolution of Bulletin 96-03 in a separate correspondence.

f f.;

/

As stated above, this lotter updates our intent and contains no new commitments.

/

Should you have any further questions, please contact Peter Kahler at (508) 830-7939 in our

. Regulatory Affairs Department.

9702200068 970207

[

PDR ADOCK 05000293 o

.T. Boulette, PhD G

PDR L

KRD/dmc/ieb96-03

cc-Mr. Alan B. Wang, Project Manager Project Directorate 1-1 Office Of Nuclear Reactor Regulation Mail Stop: 1482 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission i

Region I 1

475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station 4

N l

4 i

i

~i I

t 3