Final Potential Significant Deficiency Rept SD-80 Re Weld Preparation on Skewed Fillet Weld Joints.Welds Determined Acceptable.Item Not Reportable Per 10CFR50.55(e)
ML20134M068
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/22/1985
From: Mroczka E, Opeka J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
F0810A, F810A, I810A, SD-80, NUDOCS 8509030526
Download: ML20134M068 (2)


Text

_

a N UTILETIES o.n.,e On c... s.io.n sir..i. o.,iin. Conn.ci,cui

l... -

[

4ARTFOnD CONNECTICUT 06141-0270 L

L TJ C'..*. 'l.', 0.',"."Z.',3; (203) 665-5000 Aty;ust 22,1935 flocket No. 50 421 l'0 S 10 A Dr. Thornas E. Murley llegional Adtninistrator U. S. Nudear llegulatery Commission llegion !

631 Park Avenue King of Prussia, PA 19406 Iteferences (1)

3. F. Opeka letter to T. C. Murley, F0735A dated May 10, 1935.

(2) 3.

F.

Opeka letter to T.

E.

Morley, F0773A dated July 10,1935.

Dear Dr. Murley:

Mi'Istone Nuclear Power Station, Unit No. 3 licporting of Potential Significant Deficiencies in Accordance with ICCritSO.S$(c):

Skewed Annie Fillet Welds (50 80)

In an April 12,1983 telephone < onversation between your Mr. T. Itebelowski and our Mr. P. J. Colnlan, Northeast Nuclear Energy Company (NNCCO) reported a potential significant deficiency in the construction of Millstonc thilt No. 3 in acc ordance with 10CFit SO.S$(c). The potentlot significant delit lency involved the weld preparation on skewed fillet wcld joints.

As noted in referen(c (1), our architect engineer, Stonc & Webster Engineering Corporation, has (ompleted their review of the 3 or 4 $1ded welds and deterinined that this is not a significant defitirncy and that the welds are acceptable as tv.

fiD09030$D4 0D0033 t'Ott AI)OCK OD0004D3 11 PDit

\\iPp1

\\

v

o

, e 2

As noted in Reference (2) 133 2-sided welds were being reviewed on a case by case basis for acceptability. All of these welds were found to be acceptable as is and determined not to constitute a significant deficiency in accordance with 10CFit30.53(c). As such, we consider this to be our final report for SD-30.

% e trust this infortnation is suf ficient to close this issue.

Very truly yours, NOllTilEAST NUCt.EAll ENERGY COMPANY 5k hAR'A J.1. Opeka Senior Vice President M.'&

Dy li.g4 Mroczkat/

Vice President cca Mr. 3. M. Taylor, Director Division of Inspection and Enforcernent U. 5. Nuclear Itegulatory Corninission Washington, D. C. 20333 1

-