ML20134M030
| ML20134M030 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 07/31/1985 |
| From: | Porter R BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20134M010 | List: |
| References | |
| NUDOCS 8509030513 | |
| Download: ML20134M030 (1) | |
Text
o OPERATING DATA REPORT Docket No. 50-318 Date: August 12,1985 Completed by R. Porter Telephone: (301) 260-4747 OPERATING STATUS seeeeeeeeeeeeeeeees 1.
Unit Name:
Calvert Cliffs No. 2 2.
Reporting Period:
JULY 1985 3.
Licensed Thermal Power (MWt):
2,700 4.
Nameplate Rating (Gross MWe):
911 5.
Design Electrical Rating (Net MWe):
845 6.
Maximum Dependable Capacity (Gross MWe):
860 7.
Maximum Dependable Capacity (Net MWe):
825 8.
Change In Capacity Ratings:
None 9.
Power Level To Which Restricted (Net MWe):
NA 10.
Reasons For Restrictions:
NA This Month Yr-To-Date Cumulative 11.
Ilours In Reporting Period 744 5,087 73,055 12.
Number Of Ilours Reactor Was Critical 553.8 4,527.9 61,086.7 13.
Reactor Reserve Shutdown llours 190.3 190.3 1,158.3 14.
Ilours Generator On-line 553.3 4,511.9 60,131.2 15.
Unit Reserve Shutdown llours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWil) 1,468,212 11,968,830 150,689,767 17.
Gross Electrical Energy Generated (MWil) 476,765 3,967,680 49,625,883 18.
Net Electrical Energy Generated (MWil) 456,393 3,795,937 47,338,145 19.
Unit Service Factoc 74.4 88.7 82.3 20.
Unit Availability Factor 74.4 88.7 82.3 21.
Unit Capacity Factor (Using MDC Net) 74.4 90.4 78.9 22.
Unit Capacity Factor (Using Dell Net) 72.6 88.3 76.7 23.
Unit Forced Outage Rate 0.0 7.9 6.3 24.
Shutdowns Scheduled Over the Next Six Months (type, date, and duration): Sixth Itefueling Outage - October 19,1985 to December 22,1985 25.
If Shutdown At End Of Report Period, Estimated Date Of Startup: 8/6/85 8509030513 850823 DR ADOCK 05000318 Itevision 1 PDR