Provides FFD Performance Data for six-month Period Ending 961231
ML20134M074
Person / Time
Site: Point Beach  
Issue date: 02/12/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PBL-97-0038, PBL-97-38, NUDOCS 9702200082
Download: ML20134M074 (3)


Text

.

Wisconsin Electnc POWER COMPANY Point Beoch Nuclear Pior;t (414) 755-2321 6610 Nuclear Rd., Two Rivers, WI 54241 I

i PBL 97-0038 February 12,1997 R

U. S. NUCLEAR REGULATORY COMMISSION Document Control Ded Mail Station PI 137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 FITNESS-FOR-DUTY (FFD) PROGRAM POINT BEACil NUCLEAR PLANT, UNITS 1 AND 2 In accordance with 10 CFR 26.71(d), we are providing our Fi: ness-For-Duty perfonnance data for the six-month period ending December 31,1996. No events reportable under 10 CFR 26.73(a) occurred during this period.

g If you have any questions or require additional infonnation, please contact us.

Sincerely, Douglas F. Johnson

Manager, Regulatory Services and Licensing sam Enclosure f

\\

cc:

NRC Resident Inspector NRC Regional Administrator

. - l 1

3 190010 9702200082 970212 "

PDR ADOCK 05000266 R

PDR, A subsMwrofHisconsw EnerOxprathm

Fitness for Duty Program

/['

Personnel Subject to 10CFR26 t

' Performance Data i

i i.

Wisconsin Electric Power Company December 31.1996 Company 6 Months Ending s

4 Point Beach Nuclev Plant location i

j:

Brian K. Kopetsky 414/755-6588 Contact Name

' Pl.one (include area cale) i-i Cutoffs! Screen /Confinnation (ng/ml) -

Appendix A to 10CFR26 e

j Effective September 1,1994 i

j Marijuana 50 ng / ml Amphetamines

/

/

Cocaine

/

Phencyclidine

/

/

Opiates

/

Alcohol (% BAC)

/

Long-Term Short-Tenn Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 614 76 444 Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 44 0

0 0

734 7

Fw Post accident 0

0 0

0 0

0 Cause Observed behavior 0

0 0

0 0

0 Random 232 0

28 0

168 0

Follow-up 0

0 0

0 20 0

Other 0

0 0

0 0

0 Total 276 0

28 0

922 7

Breakdown of Confirmed Positive Tests for Specific Substances l

Refusal Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol toTest i

2 3

4 5

Licensee Employees 0

0 0

0 0

0 0

Long-Term Contractors 0

0 0

0

.0 0

0 Short-Term Contractors 1

3 0

1 0

1 0

A Total 1

4 0

1 0

1 0

Seven short term (ST) contractors tested positive for dmgs or alcohol during a pre-access dmg/ alcohol screen. The contractors were not allowed unescorted access and were provided an opportunity to appeal through the Wisconsin Electric appeal process. There were no appeals and unescorted access was denied for 12 months pending results of a drug / alcohol assessment should the individuals reapply for unescorted access at a later date. The increased positive rate during pre-access testing was particularly due to a major steam generator replacement project taking place which required screening several hundreds of craft workers who were not familiar with being screened for working in a nuclear environment.

In October, a full can of beer was located in a vehide during a pre-access vehicle delivery search. The vehicle was not loaded by the driver who delivers vending foods. It was suspected that the vehicle had been used during the weekend for catering services that included the delivery of alcohol. The alcohol was confiscated and there was no indication the driver with unescorted access had consumed alcohol. There was no for-cause testing i

i i

r

.a a

u - zu

-we

'ew$11' TF r em-.e temwN4g.-.

ew,-4

-e.-.w-eaw.

d'mu

e

-a=

m w

---m--u.s 6

p.qM.ru 7w e

b.

wt-m m,w_-

r*

-