Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000445/1985008 + (06:43:38, 12 December 2024)
- ML20135H747 + (06:43:38, 12 December 2024)
- ML20135H744 + (06:43:39, 12 December 2024)
- ML20135H743 + (06:43:40, 12 December 2024)
- B11640, Forwards Input to SALP Evaluation Process.All Major Const & Test Milestones Met to Support Nov 1985 Fuel Load Date During SALP Assessment Period + (06:43:41, 12 December 2024)
- ML20135H742 + (06:43:41, 12 December 2024)
- PY-CEI-NRR-0314, Forwards FSAR Changes Re Plant Underdrain Sys & Circulating Water Break Analysis.Info Provided to Close Confirmatory Issue 54 Re Flooding Due to Circulating Water Sys Expansion Joint Failure in Turbine Bldg + (06:43:42, 12 December 2024)
- IR 05000312/1985018 + (06:43:45, 12 December 2024)
- ML20135H734 + (06:43:46, 12 December 2024)
- ML20135H736 + (06:43:46, 12 December 2024)
- U-600259, Part 21 & Interim Potentially Reportable Deficiency Rept 55-85-07 Re Seismic Design & Const of Automatic Sprinkler Corp of America,Inc Fire Protection Sys.Initially Reported on 850813.Investigation Continuing + (06:43:47, 12 December 2024)
- ML20135H731 + (06:43:48, 12 December 2024)
- IR 05000401/2008009 + (06:43:49, 12 December 2024)
- PNO-III-85-083, on 850917,leak Observed in East Steam Bypass Line.Transient Power Spike Observed While Attempting to Isolate Line & Open Valve.Cause of Transient Not Determined. Cracked Piping Around Valve Under Investigation + (06:43:50, 12 December 2024)
- ML20135H726 + (06:43:50, 12 December 2024)
- IR 05000401/2007009 + (06:43:51, 12 December 2024)
- ML20135H719 + (06:43:52, 12 December 2024)
- U-600243, Forwards Revs 6 & 3 to Physical Security & Safeguards Contingency Plans,Respectively,Updating & Clarifying Info Re Detailed Security Measures for Physical Protection of Nuclear Power Station.Revs Withheld (Ref 10CFR73.21) + (06:43:53, 12 December 2024)
- IR 05000261/1985027 + (06:43:54, 12 December 2024)
- ML20135H716 + (06:43:54, 12 December 2024)
- U-600261, Forwards Dcrdr Summary Rept. Major Tasks Included in Dcrdr Enumerated.Human Engineering Design Discrepancies Identified by Dcrdr Categorized + (06:43:55, 12 December 2024)
- ML20135H708 + (06:43:56, 12 December 2024)
- ML20135H706 + (06:43:57, 12 December 2024)
- IR 05000341/1985034 + (06:44:00, 12 December 2024)
- ML20135H702 + (06:44:01, 12 December 2024)
- PLA-2537, Forwards Plan & Schedule for Security tie-in of Fifth Diesel Generator Under Const.Plan & Schedule Withheld (Ref 10CFR2.790) + (06:44:01, 12 December 2024)
- ML20135H699 + (06:44:04, 12 December 2024)
- PNO-III-85-082, on 850917,bomb Threat Received.No Suspects Found.Threat Considered Hoax & No Plant Search Taken + (06:44:04, 12 December 2024)
- ML20135H696 + (06:44:05, 12 December 2024)
- ML20135H694 + (06:44:06, 12 December 2024)
- ML20135H693 + (06:44:06, 12 December 2024)
- IR 05000334/1985018 + (06:44:35, 12 December 2024)
- IR 05000445/1984045 + (06:44:35, 12 December 2024)
- ML20135H687 + (06:44:36, 12 December 2024)
- IR 05000727/2008001 + (06:44:37, 12 December 2024)
- ML20135H684 + (06:44:37, 12 December 2024)
- ML20135H682 + (06:44:38, 12 December 2024)
- TXX-4370, Suppls 840907 Response to Violations Noted in Insp Rept 50-445/84-08.Corrective Actions:Reinsp of Baseplate Shims & Bolt Tightening Committed to in Completed.Answers to Questions Raised in NRC Encl + (06:44:38, 12 December 2024)
- ML20135H679 + (06:44:39, 12 December 2024)
- ML20135H676 + (06:44:40, 12 December 2024)
- ML20135H678 + (06:44:40, 12 December 2024)
- ML20135H673 + (06:44:41, 12 December 2024)
- ML20135H667 + (06:44:42, 12 December 2024)
- ML20135H671 + (06:44:42, 12 December 2024)
- U-600257, Forwards Rev 5 to Qualification & Training Plan,In Response to WR Butler .Rev Withheld (Ref 10CFR73.21) + (06:44:44, 12 December 2024)
- ML20135H633 + (06:44:46, 12 December 2024)
- 05000341/LER-1985-052, :on 850818,Div II Reactor Bldg Pressure High/ Low Plan Received.Caused by Reactor Bldg Supply Airflow Being Too High.Airflow Reduced & Div II of Standby Gas Treatment Initiated to Restore Pressure + (06:44:52, 12 December 2024)
- ML20135H597 + (06:44:53, 12 December 2024)
- ML20135H596 + (06:44:54, 12 December 2024)
- 05000528/LER-1985-054, :on 850618,seal Leak Test Not Performed within 72 H Following Operation of Emergency Airlock on 100 Ft Level of Containment Bldg.Security Sys Test Procedure 20SP-02209 Will Be Modified to Notify of Test + (06:44:59, 12 December 2024)
- ML20135H594 + (06:45:00, 12 December 2024)
- ML20135H593 + (06:45:01, 12 December 2024)