_.

.

  • .

.,

..-.

.

-o (

U.S. NUCLEAR REGULATORY COMMISSION

REGION V

.

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE FOR

'

.

SACRAMENTO-MUNICIPAL UTILITY DISTRICT-RANCHO SECO NUCLEAR GENERATING STATION

.

k V

E g

  • * ~7 j

u

,

-

%

,

J; REPORTNO.Sd-$12/85-18'+'.

,

7,

,

-

-

-

,

-

.

r

-

.

-

-

~

"

EVALUATION PERIOD:

12/1/83

.5/21/.85

. 4,,,

,

,;

-

,

,

,

,

.

  • ,.

'

ASSESSMENT CONDUCTED: ' AUGUST:7, 19851 "'

.

j 7,..

., ~,.

t

,,

-

.m,

_P

<

c,

^

'

,-

,

'

"-

-....L,... I'

. "

<

-

^

'

,

,

,

-

'

8509240100 850909 PDR ADOCK 05000312

,

. r.

" <

r G

PDR

~~ ~I, ',.

-

i

.

-

I

,

.-

-

'f

~

'

"

y

.,

3. e* *

,1

,j9'"

g

%

,,j'

4U

-

< rg i'

-

.,

.#

-m

.

h

.j

,

.

,

,

-,-

,

,

.- -

..,

_

,

.

._

.

.

.. _.,

_

.__ -

.

.

..

.

SUMMARY (12/01/83 - 05/31/85)

RANCHO SECO Inspections Conducted Enforcement Items Inspection **- Percent Severity Level ***

'

Functional Area Hours-of Effort I

II III IV V Dev.

1.

Plant Operations 2891

2

-

,

l 2. ' Radiological.

.

'

Controls 652 10-1*

1

'

~i 3.

Maintenance 475 8'

1 1

-

4.

Surveillance.

260

3 s

t,'

..

5.

Fire Protection

1

g

,1 IL

~3

,

'

>

/

'

v i -

15. : Emergency

  1. -

- "-

'

,

Preparedness 462

-

2-

'

7.

Security and

~

s.

,

- safeguards 404

.7

'

,

,

+

~

,

8.

Refueling

1

'

+

,

'

9.

Quality Programs

,,

and Administrative

,

i Controls 200'

9 9 10. Licensing

0

,

l 11. Engineering and l

Construction 682 11-2 1

12. Training 135

>2

1 Total 6334

'100

0 1*

24 13

  • 0ne Level III issued ~ for three associated violations.
    • Allocations of inspection hours vs. functional areas are approximations'

'

based upon inspection report data, and include onsite and in office inspection effort..Does not include PAT /IE inspection hours or SALP preparation hours.

<

(10 CFR Part 2, Appendix C).

i

~ Data-compiled'from Inspection Report Nos. 83-32-through 85-15 and 85-23,

>

covering inspections performed during the assessment period 12/1/83 - 5/31/85.

.

.

... -

--

.-- --

~'

'

.

y

.

.

.

,

. -,.

,

,,x

-

r

>

-

,

,

" '

<

s.

-

> 3y =

,,

.,

,

,

,

.

.

.:

,

-

- <

<

j s

,

,

r

<

r

,

j

-

'

..

.

a

.

.,

,

i TABLE 2.

~

t

'

Rancho Seco Enforcement Items-

'

(12/01/83 - 05/31/85)-

Inspection Severity Functional

,

Report No.

Subject Level Area 83-34~

Failure of PRC to' review temporary IV

l change to emergency diesel generator

' operating procedure.

(PAB. finding)

Failure of PRC to review a IV

'

temporary change to an incore

. instrument surveillance procedure.

'

(PAB finding)

}[

-Inadequate control of abnormal tags.

V

(PAB finding)

83-36

. Failure to follow revised procedure for hydrogen monitor and purge system.

Continued operation without-IV

i minimum required operable j

pressurizer level instruments.

.

J

.

84-02 PRC did not' evaluate Technical-IV

j Specification. violations

!

(2 examples) (PAB finding)

<

'l PRC did not review Abnormal Tags IV

(PAB finding).

,

Inadequate PRC membership (PAB finding).

..

V

1

,

J j

-

1PRC failed to review V-

_

l procedure changes (PAB finding)

l Failure to document PRC V

i determination of procedure

,

i review (PAB_ finding)

!

l Failure to document PRC V-

determination as to unreviewed

,

i safety questions ~

.

MSRC did not review QA audit' reports'

IV

,

'

. Tardy responses to QA audit findings-IV

'9

.

l Use of out-of-date equipment IV 9-

,2 classification documents.by

. Maintenance and Procurement _ ~

T'

' "'

l'

I?

.

,,

,

'

'

:'y --

,a

, Q,-

- fF

',

,

,

,

l,

., :, w..A, ' '

+

,

,

o

,s.

m

,,

-

.

M,

. '.I O,...,~ s.: ?

_

_ -. _ _,

!

.

.w,

.,. _...

_ -,.

.. - _,

_,,. _

. _.i..,.

'

,

.

-

.

.

.

-

7..

.

.

,.

.

'

'

'

. '.

"

+

-

-

.

,

'

.

-

,-

.

]

-Severity [ Functional

~

-Inspection

,,

Report No.

Subject Level Area 84-02 No training programs for'

'IV

(continued)

Maintenance or Procurement'

'

personnel

~

' 84-07 Failure to maintain up-to-date

'V

revisions of surveillance

'

'

procedures in the Control Room?

84-09 Nuclear instrument calibrations were IV-

not performed as required.

,

84-11 Emergency Preparedness training IV

,

not given after reassignment.

'

Inadequate' data and procedures for IV

~

'

meteorological program.

84-13 Insufficient records relating to V

4 storage and protection of Class IE motor control centers.

A contractor QC inspector was not V

listed as an authorized inspector.

84-14 Welding filler material was not V

adequately controlled by Tool Room.

,

i j'

Written quizzes were not administered V

during.requalification training.

l 84-15 Design calculations for the auxiliary IV

feedwater flow orificies plates were-not adequately reviewed and approved.

'

84-19 Improper control of combustible

_V

'S materials.

,

Improper setting of code safety valve. IV

84-22 Expanded Fire Brigade Training Deviation

had not been performed.

A Senior Control Room Operator had IV

1 not been trained in his designated role as fire brigade leader.

Improper ~ control of combustible IV 5-materials.

l Annual. training with the Herald IV

i Fire Department was not h' eld.

,

!

t

?-

.

' _ _

-

-..,...

-,_... ~ _ _..

..

_

,

...

_

_

.-.

.

,

c m,.

.,

'

.39

-

%-

,

I Inspection.

Severity Functional

.

Report No.

Subject Level Area 84-25 Inadequate radiological survey of (below)

i radioactive fragment removed from steam generator.and inadequate placement of. personnel monitoring j

'

devices, i'

Inadequate records of surveys of (below)

radioactive fragment.

,

Improper reporting of unusual

4 radiation levels, inadequate posting

_

of source of radiation, improper use

,

i of. radiological work permit (RWP) and-

)

inadequate airborne radioactivity

_III

j

< survey.

(collectively)

j MSRC audits;of facility staff

.IV

L qualifications.did not extend below the level of supervisory personnel.

,

84-29 A-Licensed Senior Operator was not Deviation

present during licensed operator

instruction.

i.

85-01 Inadequate design verification and

. Deviation

field change procedures.-

j Four NSEB HVAC seismic supports did$.

l JM/

]

not-conform to drawings but had been

-

.

i inspected and accepted by QC.

'

'

a 85-02-Inaccurate welder'recertification recor,ds.

V

.

-

.

y,

Y "

-Incomplete welding filler; material ~

-

IV -

l-control records.

N

'J'-

-(repeat)

-

cw...

m [, * yn -

v y _.v.

, _.

..

+

5 85 03

. Air particulate and charcoal filter ' '

IV'

y 2'

,

"

samples were not tak'en an'd: analyzed on f l 3 ' ' #h l"',

a regular weekly schedule. ' ' '

s,

-

'

'

'

3 :_ s. L m. 4 5

.

,

.-

,

.

,.

<

e

=

o-

..

.

~

14-

.

.

I 85-08 Inacequate battery l testing. proced.ures.; ~.p.% IV

,w

.

..,.

.

,

,

.g..

~

V-

...

. Incomplete updating of drawings,

'r

.

associated with NCR dispositiona4

?

t

., ' !

i g,

e7

  • -

.

-

J.

.

.

y

.-

.

85-23 Two plant gages not included in, site IV

, /

'4

>

calibration program and" missing

~ '

-

~..

}

calibration recordsf*"

.c '

4-

>

Additional system valves n5E tested

, ~'

IV

,

L following a_ test failure.

C

.3

,

'_

,

>

.

f s

..!

..,..

,4

...

,

-.,. _

y-

,. -,...,

-

...,,.,

_ -,,,, -,.

--.

..

,-

.

.

.. _,

.,

-.

-

,

TABLE 3 SYNOPSIS OF LICENSEE EVENT REP 0 HTS **

l'

Functional SALP Cause Code *

Area A

B C

D E

X Totals 1.

Plant-Operations

0

2

0

'

2.

Radiation Protection

1

1

0

3.

Maintenance

0

1

0

4.

Surveillance

0

10

0

5.

Fire Protection

1

0

1

6.

Emergency Preparedness

0

0

0

7.

Safeguards

0

0

0

8.

Refueling

1

l'

0

9.

Quality Programs and

1

3

1

Administrative Controls-Affecting Safety 10.

Licensing

0

0

0-

11.

Engineering and

~ 3

1

0

3 Construction

,

12.

Training

0

0

'O'

'O

TOTALS

7

19

2

'

  • Cause Codes:

'

'

A-Personnel Error

-

s,

B-Design, Manufacturing or Installation Error C-External Cause

'

D-Defective Procedures E-Component Failure X-Other

.

    • Synopsis tabulates the number of causes and sub-causes identified in 40 LERs (Nos. 83-03-01, 83-37-01 and 83-38 through 85-05)

NOTE:

'Several LER's categorized in multiple areas of cause codes ---

'

follow-up LER's which do not identify additional areas or causes were not double accounted along with the' original LER during this period.

s

.i

!

-

- -

-

-

-

.

-