ML20135H682

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-334/85-18 on 850727-0801 & Notice of Violation
ML20135H682
Person / Time
Site: Beaver Valley
Issue date: 09/17/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20135H683 List:
References
NUDOCS 8509240128
Download: ML20135H682 (2)


See also: IR 05000334/1985018

Text

-

.

.

-

,

4

'

SEP 171985

'

Docket / License:

50-334/DPR-66

EMIG"ATD ORIGI:iAL

Attn:

Mr. J. J. Carey,

~3

M

Duquesne Light Company

Certified B

'

Vice President

Nuclear Group

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

Subject:

Inspection 50-334/85-18

This refers to the routine resident safety inspection by Mr. W. Troskoski on July

27 - August 31, 1985, at the Beaver Valley Power Station, Unit 1, Shippingport,

Pennsylvania.

The inspection consisted of document reviews, interviews and-obser-

vation of activities.

The findings were discussed with Mr. J. Sieber of your staff.

Based on the results of this inspection, it appears that certain of your activities

were not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This violation has been

categorized by severity level in accordance with the NRC Enforcement Policy (47 FR 8583) dated March 8, 1984.

You are required to respond to this letter and in

preparing your response, you should follow the instructions in Appendix A.

Sections of the enclosed inspection report contain details of your security program

that have been determined to be exempt from public disclosure in accordance with

10 CFR 73.21, Safeguards Information.

The sections so identified will not be

placed in the NRC Public Document Room and will receive limited distribution.

The

inspection report cover sheet and any remaining portions of the inspection report

will be placed.in the Public Document Room, in accordance with 10 CFR 2.790(a).

The responses directed by this letter and the accompanying Notice are not subject

to the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation is appreciated.

Sincerely,

printr::1 Signed Bya

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation *

2.

NRC Region I Report 50-334/85-18*

  • Contains Safeguards Information

8509240128 850917

i

p

^* * 05

SE*

  1. g

1

,

i

-

_

__.

-

.

.

.

'

.

.

.

.

t

Duquesne Light Company'

2

SEP 171985

-

1

cc (w/o Appendix A and Page 7 of Enclosure 2):*

H. M. Siegel, Manager, Nuclear Engineering Department

C. E. Ewing, QA Manager

W. S. Lacey, Station Superintendent

R. Druga, Chief Engineer

R. Martin, Nuclear Engineer

J. Sieber, Manager, Nuclear Safety and Licensing

T. D. Jones, . Manager, Nuclear Operations

N. R. Tonet, Manager, Nuclear Engineering

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

  • Contains Safeguards Information

bcc (w/o Appendix A and Page 7 of Enclosure 2):*

Region I Docket Room (with concurrences)

Section Chief, DRP

M. McBride,' RI, Pilgrim

G. Walton, SRI, BV-2

P. Tam, LPM, NRR

D. Holody, RI

  • Contains Safeguards Information

P

P

RI;QRP

-

/

oskoski/meo

hripp

[n,ger

ner

l

$

$*ll"W

I1f0h

f

0FFICIAL RECORD COPY

.

.

-

-.