Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Z754 + (01:22:32, 12 December 2024)
- IR 05000445/1984040 + (01:22:33, 12 December 2024)
- ML20137Z753 + (01:22:33, 12 December 2024)
- ML20137Z749 + (01:22:34, 12 December 2024)
- ML20137Z750 + (01:22:34, 12 December 2024)
- 1CAN088507, Responds to NRC 850805 Request for Voluntary Participation in Efforts Re Generic Issue 77 Concerning Flooding of Safety Equipment Compartments by Backflow Through Floor Drains. Request Declined Due to Demands on Engineering Resources + (01:22:35, 12 December 2024)
- ML20137Z746 + (01:22:36, 12 December 2024)
- ML20137Z745 + (01:22:37, 12 December 2024)
- ML20137Z740 + (01:22:43, 12 December 2024)
- ML20137Z739 + (01:22:44, 12 December 2024)
- 05000416/LER-1985-042, :on 851102 & 23,ESF Bus Trips Occurred.Caused by Incorrect Wiring Configuration.Configurations Corrected + (01:22:46, 12 December 2024)
- ML20137Z734 + (01:22:50, 12 December 2024)
- ML20137Z736 + (01:22:50, 12 December 2024)
- ML20137Z733 + (01:22:51, 12 December 2024)
- ML20137Z729 + (01:22:52, 12 December 2024)
- PNO-I-85-092, on 851205,PUC of State of PA Voted 3.2 Billion Dollar Cost Cap.Unit About 30% Complete.Restart of Const Planned in Jan 1986 Pending Board of Directors Approval.Fuel Load Planned for Early 1990 + (01:22:52, 12 December 2024)
- ML20137Z726 + (01:22:55, 12 December 2024)
- ML20137Z719 + (01:22:56, 12 December 2024)
- ML20137Z718 + (01:22:57, 12 December 2024)
- ML20137Z714 + (01:22:58, 12 December 2024)
- ML20137Z716 + (01:22:58, 12 December 2024)
- ML20137Z712 + (01:22:59, 12 December 2024)
- ML20137Z713 + (01:22:59, 12 December 2024)
- ML20137Z711 + (01:23:00, 12 December 2024)
- ML20137Z710 + (01:23:00, 12 December 2024)
- ML20137Z707 + (01:23:01, 12 December 2024)
- ST-HL-AE-1369, Clarifies That Stainless Steel Piping Will Be Used for ECCS Piping in Contact W/Borated Piping.Carbon Steel Piping May Be Used for Portions of ECCS Containing Nonborated Piping + (01:23:02, 12 December 2024)
- ML20137Z704 + (01:23:02, 12 December 2024)
- ML20137Z702 + (01:23:03, 12 December 2024)
- ML20137Z701 + (01:23:04, 12 December 2024)
- PNO-IV-85-061, on 851206,scheduled Maint Outage Will Begin. Replacement of Expansion Joint in Feedwater Heater & Repair of Main Generator Cooling Sys Hydrogen Leak Will Be Completed.Restart Scheduled for 851211 + (01:23:05, 12 December 2024)
- ML20137Z698 + (01:23:05, 12 December 2024)
- ML20137Z697 + (01:23:06, 12 December 2024)
- ML20137Z695 + (01:23:06, 12 December 2024)
- 05000250/LER-1985-025, :on 850827 & 30,during App R Safe Shutdown Review,Addl Circuits That May Require Protection,Rerouting or Circuit Mods Identified.Caused by Addl NRC Guidance.Fire Watch Expanded + (01:23:08, 12 December 2024)
- IR 05000454/1986008 + (01:23:09, 12 December 2024)
- ML20137Z689 + (01:23:10, 12 December 2024)
- ML20137Z688 + (01:23:11, 12 December 2024)
- ML20137Z686 + (01:23:11, 12 December 2024)
- ML20137Z683 + (01:23:12, 12 December 2024)
- ML20137Z685 + (01:23:12, 12 December 2024)
- ML20137Z680 + (01:23:13, 12 December 2024)
- ML20137Z677 + (01:23:14, 12 December 2024)
- ML20137Z678 + (01:23:14, 12 December 2024)
- 05000322/LER-1985-053, :on 851107,w/mode Switch in Shutdown & All Rods Inserted in Core,Determination Made That Temporary Procedure Change Notice Not Approved by Plant Manager within 14 Days. Notices Will Be Administratively Expedited + (01:23:16, 12 December 2024)
- ML20137Z671 + (01:23:17, 12 December 2024)
- ML20137Z672 + (01:23:17, 12 December 2024)
- ML20137Z669 + (01:23:18, 12 December 2024)
- ML20137Z668 + (01:23:19, 12 December 2024)
- ML20137Z664 + (01:23:20, 12 December 2024)
- ML20137Z667 + (01:23:20, 12 December 2024)
- ML20137Z663 + (01:23:21, 12 December 2024)