ML20137Z672

From kanterella
Jump to navigation Jump to search
Forwards Topical Rept Evaluation of Rev 1 to NEDO-20566-2, GE Analytical Model for LOCA Analysis in Accordance W/10CFR50,App K,Amend 2,One Recirculation Loop-Out-of-Svc. Rept Acceptable
ML20137Z672
Person / Time
Issue date: 03/05/1986
From: Berkow H
Office of Nuclear Reactor Regulation
To: Quirk J
GENERAL ELECTRIC CO.
Shared Package
ML20137Z679 List:
References
NUDOCS 8603130092
Download: ML20137Z672 (2)


Text

.

March 5, 1986 Mr. J. F.. Quirk, Manager BWR Systems Licensing

. Nuclear Safety & Licensing Operation General Electric Company 175 Curtner Avenue San Jose, California 95125

Dear Mr. Quirk:

SUBJECT:

ACCEPTANCE FOR REFERENCING 0F LICENSING TOPICAL REPORT NED0-20566-2, REV. 1 " GENERAL ELECTRIC COMPANY ANALYTICAL'MODEL FOR LOSS-0F-COOLANT ACCIDENT ANALYSIS IN ACCORDANCE WITH 10 CFR 50 APPENDIX K, -

AMENDMENT N0. 2, ONE RECIRCULATION LOOP-0VT-0F-SERVICE" We have completed our review cf the subject topical report submitted by the

~

General Electric Company (GE) by letter dated August 1, 1978. We find the report to be acceptable for referencing in license applications to the extent specified and under the limitations delineated in the report and the associated

-NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of the report.

We.do not intend to repeat our review of the matters described in the report and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to the matters described in the report.

In accordance with procedures established in NUREG-0390, it is requested that GE publish accepted versions of this report, proprietary and non-proprietary, within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall. include an -A (designating accepted) following the report identification symbol.

Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, GE and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.

Sincerely, 8603130092 860305 original signed by PDR TOPRP ErfVQENE Herbert N. Berkow, Director C PDR Standardization and Special Projects Directorate Division of PWR Licensing-B

Enclosure:

DISTRIBUTION:

fh As stated Central File, PDR PNoonan HBerkow GThomas SSPD Reading DCS RDiggs JDosa REmch ,

1 an:ac SPD Dosa B:SSPD DPW SSPD Mf j HBenJw (

86 3 / 5 /86 S/5/86 i

a nag

& 4,, UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION

$ 9 E WASHING TON, D. C. 20555

, 8

%, . . . . / March 5, 1986 Mr. J. F. Quirk, Manager BWR Systems Licensing Nuclear Safety & Licensing Operation General Electric Company 175 Curtner Avenue San Jose, California 95125

Dear Mr. Quirk:

Sl'9 JECT: ACCEPTANCE FOR REFERENCING 0F LICENSING TOPICAL REPORT NED0-20566-2, REV. 1, " GENERAL ELECTRIC COMPANY ANALYTICAL MODEL FOR LOSS-0F-COOLANT ACCIDENT ANALYSIS IN ACCORDANCE WITH 10 CFR 50 APPENDIX K, -

AMENDMENT NO. 2, ONE RECIRCULATION LOOP-0VT-OF-SERVICE" We have completed our review of the subject topical report submitted by the General Electric Company (GE) by letter dated August 1, 1978. We find the report to be acceptable for referencing in license applications to the extent specified and under the limitations delineated in the report and the associated NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of the report.

We do not intend to repeat our review of the matters described in the report and found acceptable when the report appears as a refer? ice in license applications, except to assure that the material presenced is applicable to the specific plant involved. Our acceptance applies only to the matters described in the report.

In accordance with procedures established in NUREG-0390, it is requested that GE publish accepted versions of this report, proprietary and non-proprietary, within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an -A (designating accepted) following the report identification symbol.

Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, GE and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.

Sincerely, erbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B

Enclosure:

As stated

+. , , . . _ , _ . . _ . , - - - _ _ _ _ _ . , _ . . . _ _ _ _ . - _ _ _ _ _

,- _ _.