ML20137Z713

From kanterella
Jump to navigation Jump to search
Advises That Neither Environ Assessment Nor EIS Warranted for Amend to License SNM-1886,authorizing Exemption from Provisions of 10CFR70.24, Criticality Accident Requirement
ML20137Z713
Person / Time
Site: 07002947
Issue date: 11/27/1985
From: Crow W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20137Z684 List:
References
NUDOCS 8512110379
Download: ML20137Z713 (1)


Text

-

4 y'

~

~

, NOV 2 71985 DOCKET NO: 570-2947-LICENSE 8: Illinois Power Company (IPC) fFACILITY:' Clinton Power Station SUBJsCT:- ' CATEGORICAL 1 EXCLUSION FOR AMENDMENT REQUEST DATED NOVEMBER.11, 1985

By; letter dated November 11. 1985, the Illinois' Power Company-(IPC) requested' an amendment _ to Special Nuclear Materials License No. SNM-1886 authorizing an exemption from the. provisions of 10 CFR 70.24,' " Criticality Accident Require-Ement." LSuch an exemption wot.1d relieve IPC's Clinton Power Station from the ~

' requirement of having a criticality alarm system. The NRC: staff has reviewed

~IPC's reason's for; granting the exemption and has-determined that the licensee

.has sh'ownigood'cause for being granted the exemption. Accordingly .the staff has: concluded that the following conditions have been met.

1.- There is no significant change 1in the type or significant increase in the -

> amounts of any effluents--that may-be released offsite, <

^

2. .There _is no significant increase in individual or cumulative occupational
radiation exposure,

,' "3. There is no significant construction impact, and -!

P 4. There 'is -no.signific' ant increase in the potential for or consequences-from radiological accidents.

-Therefore,inaccordancewith10CFR51.22(c)(11),neitheranEnvironmental

-Assessment nor an Environmental Impact Statement is warranted for this action.

FOR THE NUCLEAR REGULATORY COMMISSION-W._T. Crow, Acting Chief

,' $$k21[$$$ $$h47 Uranium Fuel Licensing. Branch r'o Division of Fuel Cycle and

! C PDR

-Material Safety, NMSS 0FC: FCUP :FCUP :FCUF :FCUF  :  :  :

t __._-__..._ g .

[ NAME:KKodali/as:NKetzlach:VLT rpe :  :  :  :

}

K DATE:11/R /85 :11/ /85 :11/14/85 : A /85 :  :  :

0FFICIAL'ECORD COPY t