Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-84-015, Documents Actions Taken Re Operator Recertification Program in Response to 840229 Confirmation of Action Ltr.Six Operators Removed from Licensed Duties Effective 840229. Requalification Exam Administered + (23:54:33, 11 December 2024)
- ML20138K840 + (23:54:33, 11 December 2024)
- ML20138K833 + (23:54:34, 11 December 2024)
- AECM-84-0045, Responds to Deviations Noted in Insp of License NPF-13. Corrective Actions:Three Operators Removed from Licensed Duties & Operator Recertification Program Initiated + (23:54:35, 11 December 2024)
- ML20138K824 + (23:54:36, 11 December 2024)
- 05000348/LER-1985-012, :on 850623,reactor Trip Occurred Due to High Negative Flux Rate.Caused by Shutdown Bank & Control Rods E-11 & L-11 Dropping Into Core Due to Electrical Short.Fuses Replaced & Cables Reterminated.Module Ordered + (23:54:38, 11 December 2024)
- ML20138K819 + (23:54:39, 11 December 2024)
- ML20138K813 + (23:54:40, 11 December 2024)
- AECM-83-0750, Forwards Description of Corrective Actions to Strengthen Operator Training Program,Per Discussion at 831118 Meeting. Estimated Schedule for Completion Provided + (23:54:41, 11 December 2024)
- ML20138K810 + (23:54:42, 11 December 2024)
- ML20138K808 + (23:54:43, 11 December 2024)
- 05000348/LER-1985-015, :on 850925,determined That Positive & Negative Rate Trip Settings Existing Before 850619 Outside Tech Spec Tolerance.Caused by Incorrect Interpretation of Vendor Info. Procedure Revised + (23:54:45, 11 December 2024)
- ML20138K803 + (23:54:46, 11 December 2024)
- ML20138K800 + (23:54:47, 11 December 2024)
- ML20138K796 + (23:54:48, 11 December 2024)
- ML20138K795 + (23:54:48, 11 December 2024)
- U-600349, Final Deficiency Rept 55-85-07 Re Omission of Lateral Supports on American Sprinkler Co Fire Protection Sys in Seismic Category I Bldgs.Initially Reported on 850813. Installation of Addl Supports Will Be Completed by 851215 + (23:54:49, 11 December 2024)
- ML20138K789 + (23:54:50, 11 December 2024)
- 05000249/LER-1985-020-05, :on 850925,no Particulate Sample for Reactor Bldg Ventilation Sys Collected for Wk.Caused by Failure to Replace Screen in Filter Holder After Last Sample.Signs to Be Posted in Future + (23:54:51, 11 December 2024)
- ML20138K787 + (23:54:52, 11 December 2024)
- AECM-83-0727, Notifies That Util Will Remove Operators W/License Serials SOP-4216,OP-6239 & OP-6241 from Duties Until Addl Training Provided,Per 831104 Discussion Re Operator Training Program Deficiencies + (23:54:53, 11 December 2024)
- ML20138K776 + (23:54:54, 11 December 2024)
- 05000344/LER-1985-012, :on 850924,reactor Trip Occurred Due to lo-lo Water Level in Steam Generator D.Caused by Personnel Error Resulting in Sys Flow Oscillations.Training Info Bulletin Prepared + (23:54:56, 11 December 2024)
- ML20138K773 + (23:54:57, 11 December 2024)
- ML20138K771 + (23:55:00, 11 December 2024)
- ML20138K768 + (23:55:01, 11 December 2024)
- ML20138K767 + (23:55:02, 11 December 2024)
- 05000213/LER-1984-017, :on 841004,degradation of 15-conductor Interconnection Cable Discovered.Caused by Aging.Insp for Similar Problems in Other Equipment Concluded Problem Isolated Incident.Degraded Equipment Replaced + (23:55:03, 11 December 2024)
- ML20138K763 + (23:55:04, 11 December 2024)
- U-602683, Provides Response to NRCs RAI Re Adequacy & Availabilty of Design Bases Info at Util,Per 10CFR50.54(f) + (23:55:06, 11 December 2024)
- ML20138K754 + (23:55:07, 11 December 2024)
- ML20138K757 + (23:55:07, 11 December 2024)
- ML20138K747 + (23:55:09, 11 December 2024)
- ML20138K744 + (23:55:10, 11 December 2024)
- ML20138K738 + (23:55:11, 11 December 2024)
- ML20138K735 + (23:55:12, 11 December 2024)
- ML20138K731 + (23:55:13, 11 December 2024)
- ML20138K729 + (23:55:14, 11 December 2024)
- ST-HL-AE-1543, First Interim Deficiency Rept Re Const Damage to Low Voltage Electric Penetration Assembly Conductors.Initially Reported on 851107.Extent of Damage to Be Evaluated & Unacceptable Conductors Tagged.Next Rept Due by 860228 + (23:55:14, 11 December 2024)
- ML20138K722 + (23:55:17, 11 December 2024)
- ML20138K717 + (23:55:18, 11 December 2024)
- ML20138K714 + (23:55:19, 11 December 2024)
- ML20138K706 + (23:55:20, 11 December 2024)
- ML20138K712 + (23:55:20, 11 December 2024)
- ML20138K702 + (23:55:21, 11 December 2024)
- 05000249/LER-1985-019-07, :on 850923,observed That Reactor Not Vented at Less than 149 F.Caused by Failure of Shutdown Procedure to Completely Outline Conditions to Vent Reactor.Reactor Head Vents Opened + (23:55:23, 11 December 2024)
- ML20138K699 + (23:55:24, 11 December 2024)
- ML20138K691 + (23:55:25, 11 December 2024)
- B16136, Application for Amend to License DPR-21,changing Plant,Unit 1 Instrument Calibration,Functional,Response Time,Resistance Temperature Detector & Thermocouple Testing Requirements & Clarifies Srs,Thereby Helping to Ensure Proper Testing + (23:55:26, 11 December 2024)
- ML20138K680 + (23:55:27, 11 December 2024)
- ML20138K681 + (23:55:27, 11 December 2024)