UNITED STATES
- g nsag,9jo NUCLEAR REGULATORY COMMISSION g
[
o Cf310N 11 3
101 MARIETTA STREET N.W.
[
ATLANTA. GEORGI A 30303 o%,,,,/
Nny 101983 NOTICE OF LICENSEE MEETING Name of Licensee:
Mississippi Power and Light Company Name of Facility: Grand Gulf Nuclear Station Unit 1 Docket No.:
50-416 Date and Time of Meeting:
November 11, 1983, at 9:00 a.m.
Location of Meeting:
Region II Office, Atlanta, Georgia Purpose of Meeting: MP&L's Program for Re-Certificat'an of the Operating Personnel at tne Grand Gulf Faci'.ity NRC Attendees:
J. A. 'Olshinski, Director, Division of Engineering and Operational Programs (DEOP), RII A. F. Gibson, Branch Chief, DEOP, RII D. M. Verrelli, Branch Chief, Division of Project and. Resident Prograins (DPRP), RII
< A.' Julian, Chief, Project Section IA, DPRP, RII L. J.; Watson, Reactor Engineer, Project Section IA, DPRP, RII Additional members of the NRC staff may attend.
Licensee Attendees: J. P. McGaughy, Vice President-Nuclear Additional MP&L representatives may attend.
NOTE:
Attencance by NRC personnel at'this NRC/ Licensee meeting should be mah known by 2:00 p.m., November 10, 1983, via telephone call to David M. Verrelli FTS:
242-5526 f
Distribution:
Victor Stello, Jr., DEDROGR
\\
J. Lieberman, Director, ROED R. DeYoung, Director, IE H. R. Denton, Director, NRR D. Houston, Licensing Project Manager, (Grand Gulf), NRR Region II Distribution List C Receptionist
~
r 3I 8512190070 851127 f3{
/
REBER85-419 PDR f
e
'i m
g..
November 11, 1983 Meeting With Mississippi Power and Light Areas Discussed:
1.
Qualification Cards
- Revised guidance on qual card implementation issued
- Qual card reviewed by shift supervisor (SROS)
- Developing NRC style Matrix for signoffs of important attributes
- Matrix includes theory, practical factors, system knowledge, technical specification
- Signoffs to be accomplished by shift supervisors (SROS)
- Two classes: One on training; one on shift 2.
Relief on Susp_ ended Licenses
- Issue licenses withheld after completion of qual cards (4 licenses)?
- Reinstate three licenses after completion of qual cards / correction of weaknesses?
3.
Standards for Acceptable Performance 1
4.
Certification of Board 4
- After qualification cards are complete, operator Training Evaluation Board will certify training complete and satisfactory performance on oral exam
- MP&L will submit letter stating board certification complete 5.
Feedback of Generie Problems & Training Program
- Feedback from operator
- Feedback from review of exams / records
- Tracking of weaknesses to identify generie problems 6.
STA Certification
)gr
[g[
- 3 STA's on-shift;-3 additional have completed training d lb7-O
Me: ting with Mississippi Power and Light Page 2
- Review of training to identify weaknesses
- Retraining if necessary 7.
Shift Advisors
- Present advisors have three weeks of system training and have been examined
- MP&L will review exams and retrain in weak areas
- MP&L will review qualifications, purpose and use of shift advisors and make determination of adequate training 8.
Implementation of Practical Factors
- Will be accomplished as appropriate in plant or on simulator
- MP&L will review qual cards and identify appropriate locations and how, i.e., walk-thru/ accomplish, the item will be complete 9.
Documentation
- Short term - all documents retained
- Long term - retain main documents
- Discussed types of documents to be used to adequately show that training is completed
- 10. Removal of Operators
- Upon identification of significant weaknesses operator will be relieved of licensed duties
- MP&L program will address how removal will be accomplished
- 11. Certification of Instructors (Quadrex)
- Schedule-for certification
- Use of instructors prior to certification 831
MEMD T0:
File FROM:
W. C. Eif f, Quality Assurance Representative
SUBJECT:
Review of FSAR Secticn 13.2 during MAR 83/0133 FILE:
0290/0490/15810/16694.4 QAMI -
83/0533 The identification of FSAR paragraphs reviewed during MAR 83/0133 was inadvertantly c=itted f rc= the audit report.
The FSAR secticas reviewed were:
13.2.1.1.1 - Licensed Personnel 13.2.1.1. 2 - :;uelear Fundamentals Training 13.2.1.1.3 - Systems Operation Training 13.2.1.1.4 - Si=ulator Training 13.2.1.1.5 - Operating Practices Training 13.2.1.1.6 - License Examinatica Preparation 13.2.1.1.7 - Senior Operating Training 13.2.1.1.8 - Onsite Training (1st & 3rd paragraphs only)
CAR 2042 documents those co==itments for which verification docu=entation was not available.
(..
W. C. Eiff 11/11/83 WCE::s cc:
Mr. T. E. Reaves, Jr.
Mr. W. E. Edge Mr. J. E. Reaves Mr. S. M. Feith Site QA File Plant File [1]
- 2nual File 3}