ML20138K787

From kanterella
Jump to navigation Jump to search
Notification of 831111 Meeting W/Util in Atlanta,Ga to Discuss Program for Recertification of Operating Personnel at Facility
ML20138K787
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/10/1983
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20136E506 List:
References
FOIA-85-419 NUDOCS 8512190070
Download: ML20138K787 (4)


Text

UNITED STATES

  1. g nsag,9jo NUCLEAR REGULATORY COMMISSION g

[

o Cf310N 11 3

101 MARIETTA STREET N.W.

[

ATLANTA. GEORGI A 30303 o%,,,,/

Nny 101983 NOTICE OF LICENSEE MEETING Name of Licensee:

Mississippi Power and Light Company Name of Facility: Grand Gulf Nuclear Station Unit 1 Docket No.:

50-416 Date and Time of Meeting:

November 11, 1983, at 9:00 a.m.

Location of Meeting:

Region II Office, Atlanta, Georgia Purpose of Meeting: MP&L's Program for Re-Certificat'an of the Operating Personnel at tne Grand Gulf Faci'.ity NRC Attendees:

J. A. 'Olshinski, Director, Division of Engineering and Operational Programs (DEOP), RII A. F. Gibson, Branch Chief, DEOP, RII D. M. Verrelli, Branch Chief, Division of Project and. Resident Prograins (DPRP), RII

< A.' Julian, Chief, Project Section IA, DPRP, RII L. J.; Watson, Reactor Engineer, Project Section IA, DPRP, RII Additional members of the NRC staff may attend.

Licensee Attendees: J. P. McGaughy, Vice President-Nuclear Additional MP&L representatives may attend.

NOTE:

Attencance by NRC personnel at'this NRC/ Licensee meeting should be mah known by 2:00 p.m., November 10, 1983, via telephone call to David M. Verrelli FTS:

242-5526 f

Distribution:

Victor Stello, Jr., DEDROGR

\\

J. Lieberman, Director, ROED R. DeYoung, Director, IE H. R. Denton, Director, NRR D. Houston, Licensing Project Manager, (Grand Gulf), NRR Region II Distribution List C Receptionist

~

r 3I 8512190070 851127 f3{

[4[g' PDR FOIA 5

/

REBER85-419 PDR f

e

'i m

g..

November 11, 1983 Meeting With Mississippi Power and Light Areas Discussed:

1.

Qualification Cards

- Revised guidance on qual card implementation issued

- Qual card reviewed by shift supervisor (SROS)

- Developing NRC style Matrix for signoffs of important attributes

- Matrix includes theory, practical factors, system knowledge, technical specification

- Signoffs to be accomplished by shift supervisors (SROS)

- Two classes: One on training; one on shift 2.

Relief on Susp_ ended Licenses

- Issue licenses withheld after completion of qual cards (4 licenses)?

- Reinstate three licenses after completion of qual cards / correction of weaknesses?

3.

Standards for Acceptable Performance 1

4.

Certification of Board 4

- After qualification cards are complete, operator Training Evaluation Board will certify training complete and satisfactory performance on oral exam

- MP&L will submit letter stating board certification complete 5.

Feedback of Generie Problems & Training Program

- Feedback from operator

- Feedback from review of exams / records

- Tracking of weaknesses to identify generie problems 6.

STA Certification

)gr

[g[

- 3 STA's on-shift;-3 additional have completed training d lb7-O

Me: ting with Mississippi Power and Light Page 2

- Review of training to identify weaknesses

- Retraining if necessary 7.

Shift Advisors

- Present advisors have three weeks of system training and have been examined

- MP&L will review exams and retrain in weak areas

- MP&L will review qualifications, purpose and use of shift advisors and make determination of adequate training 8.

Implementation of Practical Factors

- Will be accomplished as appropriate in plant or on simulator

- MP&L will review qual cards and identify appropriate locations and how, i.e., walk-thru/ accomplish, the item will be complete 9.

Documentation

- Short term - all documents retained

- Long term - retain main documents

- Discussed types of documents to be used to adequately show that training is completed

10. Removal of Operators

- Upon identification of significant weaknesses operator will be relieved of licensed duties

- MP&L program will address how removal will be accomplished

11. Certification of Instructors (Quadrex)

- Schedule-for certification

- Use of instructors prior to certification 831

MEMD T0:

File FROM:

W. C. Eif f, Quality Assurance Representative

SUBJECT:

Review of FSAR Secticn 13.2 during MAR 83/0133 FILE:

0290/0490/15810/16694.4 QAMI -

83/0533 The identification of FSAR paragraphs reviewed during MAR 83/0133 was inadvertantly c=itted f rc= the audit report.

The FSAR secticas reviewed were:

13.2.1.1.1 - Licensed Personnel 13.2.1.1. 2 - :;uelear Fundamentals Training 13.2.1.1.3 - Systems Operation Training 13.2.1.1.4 - Si=ulator Training 13.2.1.1.5 - Operating Practices Training 13.2.1.1.6 - License Examinatica Preparation 13.2.1.1.7 - Senior Operating Training 13.2.1.1.8 - Onsite Training (1st & 3rd paragraphs only)

CAR 2042 documents those co==itments for which verification docu=entation was not available.

(..

W. C. Eiff 11/11/83 WCE::s cc:

Mr. T. E. Reaves, Jr.

Mr. W. E. Edge Mr. J. E. Reaves Mr. S. M. Feith Site QA File Plant File [1]

2nual File 3}

/5Bt:r A33

~-